University of Northern Iowa
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
| 05/06/2025 07:00 PM UTC |
Number | Deadline |
---|---|
Hagemann Corridor and Lounge Carpet and Paint - Hazardous Material Abatement
Providing asbestos testing and bid documentation for abatement in selected areas of Hagemann Hall. The areas planned for abatement are floors 1-4 in the corridors and student lounges and the basement floor in the student lounge. Competitive bidding of the work and then a construction phase is included in this project.
| 03/19/2024 07:00 PM UTC |
Center for Energy and Environmental Education Window Replacement Phase 6
Replace wood windows in the atrium and on the upper southeast side of the building with fiberglass windows.
| 03/19/2024 07:00 PM UTC |
Nielsen Field House Roof Replacement Phase 2
Removal and replacement of existing EPDM roof and insulation with new fully adhered KEE roof and insulation system. Removal and replacement of flashings, copings, and accessories as required to accommodate full roof replacement. Addition of roof mounted access stairs and guardrail system.
| 03/07/2024 08:00 PM UTC |
Hagemann Corridor and Lounge Carpet and Paint
Replace the carpet and paint in corridors and lounges throughout the building.
| 03/07/2024 08:00 PM UTC |
West Gym Demolition - Hazardous Material Abatement
The removal of all ACM in the building and steam tunnel system. Additional testing will be conducted to verify the locations of ACM.
| 03/05/2024 08:00 PM UTC |
Rod Library VAV Box Replacement Phase 2
Replace existing boxes and lined ductwork with new VAV boxes on the second floor of the library.
| 11/16/2023 08:00 PM UTC |
Maucker Union Ballroom Roof Replacement
As indicated on the project drawings, remove existing rock ballast and EPDM membrane, reuse existing insulation, mechanically attach new insulation into concrete deck, adhere new coverboard and install new adhered Fleecebacked KEE membrane.
| 11/16/2023 08:00 PM UTC |
Noehren Hall Generator Replacement
The project consists of the removal of an existing diesel generator, diesel tank, exhaust piping, and installation of a new natural gas generator, natural gas piping, and exhaust piping.
| 11/09/2023 08:00 PM UTC |
Power Plant Metal Roof Coating
As indicated on the project drawings, clean existing select metal roof areas and conveyor areas, install primer on all areas with rust or corrosion and then install a fluid-applied elastomeric roof coating.
| 08/10/2023 07:00 PM UTC |
Nielsen Field House Roof Replacement Phase 2
Demolition and disposal of existing membrane roofing, insulation and coverboard and select abandoned roof curbs. Patch and repair roof deck. Installation of new insulation (flat and tapered), KEE membrane roofing, fall protection railing and metal flashings and coping.
| 08/01/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.