Gilchrist Hall Roof Replacement
As indicated on the project drawings, remove existing EPDM membrane, remove existing insulation, mechanically attach new insulation into metal/concrete deck, adhere new coverboard and install new adhered Fleecebacked KEE membrane.
05/21/2024 07:00 PM UTC
West Gym Demolition
The complete deconstruction, demolition, and removal of the West Gymnasium facility from the UNI campus. Multiple site utilities will be affected, including a steam utility tunnel, and will be partially modified and removed. Utilities will be restored to support adjacent campus facilities. Site will be cleaned of all building materials, cleared, finish graded, and sodded for possible future building site.
05/07/2024 07:00 PM UTC
Wellness Recreation Center Roof Replacement Phase 2
Remove existing roof system down to roof deck and replace with a new roof system with insultation that meets energy code requirements.
04/30/2024 07:00 PM UTC
Institutional Roads 2024
As part of the 2024 Institutional Roads program, this project includes but is not limited to: 1) Partial reconstruction of Jennings Drive, 2) Reconstruction of the intersection of Ohio St. and Redeker Drive.
04/11/2024 07:00 PM UTC
Innovative Teaching and Technology Center Renovation for Nursing, Phase 2
As part of the new Nursing program, an area on the ground floor is remodeled to provide flexible simulation environments allowing for a diversity of high-fidelity scenarios leading to increase outcomes by students.
03/21/2024 07:00 PM UTC
Hagemann Corridor and Lounge Carpet and Paint - Hazardous Material Abatement
Providing asbestos testing and bid documentation for abatement in selected areas of Hagemann Hall. The areas planned for abatement are floors 1-4 in the corridors and student lounges and the basement floor in the student lounge. Competitive bidding of the work and then a construction phase is included in this project.
03/19/2024 07:00 PM UTC
Center for Energy and Environmental Education Window Replacement Phase 6
Replace wood windows in the atrium and on the upper southeast side of the building with fiberglass windows.
03/19/2024 07:00 PM UTC
Nielsen Field House Roof Replacement Phase 2
Removal and replacement of existing EPDM roof and insulation with new fully adhered KEE roof and insulation system. Removal and replacement of flashings, copings, and accessories as required to accommodate full roof replacement. Addition of roof mounted access stairs and guardrail system.
03/07/2024 08:00 PM UTC
Hagemann Corridor and Lounge Carpet and Paint
Replace the carpet and paint in corridors and lounges throughout the building.
03/07/2024 08:00 PM UTC
West Gym Demolition - Hazardous Material Abatement
The removal of all ACM in the building and steam tunnel system. Additional testing will be conducted to verify the locations of ACM.
03/05/2024 08:00 PM UTC