University of Northern Iowa
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Gilchrist Hall Roof Replacement
As indicated on the project drawings, remove existing EPDM membrane, remove existing insulation, mechanically attach new insulation into metal/concrete deck, adhere new coverboard and install new adhered Fleecebacked KEE membrane.
| 05/21/2024 07:00 PM UTC |
West Gym Demolition
The complete deconstruction, demolition, and removal of the West Gymnasium facility from the UNI campus. Multiple site utilities will be affected, including a steam utility tunnel, and will be partially modified and removed. Utilities will be restored to support adjacent campus facilities. Site will be cleaned of all building materials, cleared, finish graded, and sodded for possible future building site.
| 05/07/2024 07:00 PM UTC |
Wellness Recreation Center Roof Replacement Phase 2
Remove existing roof system down to roof deck and
replace with a new roof system with insultation that meets energy code requirements.
| 04/30/2024 07:00 PM UTC |
Institutional Roads 2024
As part of the 2024 Institutional Roads program, this project includes but is not limited to: 1) Partial reconstruction of Jennings Drive, 2) Reconstruction of the intersection of Ohio St. and Redeker Drive.
| 04/11/2024 07:00 PM UTC |
Innovative Teaching and Technology Center Renovation for Nursing, Phase 2
As part of the new Nursing program, an area on the ground floor is remodeled to provide flexible simulation environments allowing for a diversity of high-fidelity scenarios leading to increase outcomes by students.
| 03/21/2024 07:00 PM UTC |
Hagemann Corridor and Lounge Carpet and Paint - Hazardous Material Abatement
Providing asbestos testing and bid documentation for abatement in selected areas of Hagemann Hall. The areas planned for abatement are floors 1-4 in the corridors and student lounges and the basement floor in the student lounge. Competitive bidding of the work and then a construction phase is included in this project.
| 03/19/2024 07:00 PM UTC |
Center for Energy and Environmental Education Window Replacement Phase 6
Replace wood windows in the atrium and on the upper southeast side of the building with fiberglass windows.
| 03/19/2024 07:00 PM UTC |
Nielsen Field House Roof Replacement Phase 2
Removal and replacement of existing EPDM roof and insulation with new fully adhered KEE roof and insulation system. Removal and replacement of flashings, copings, and accessories as required to accommodate full roof replacement. Addition of roof mounted access stairs and guardrail system.
| 03/07/2024 08:00 PM UTC |
Hagemann Corridor and Lounge Carpet and Paint
Replace the carpet and paint in corridors and lounges throughout the building.
| 03/07/2024 08:00 PM UTC |
West Gym Demolition - Hazardous Material Abatement
The removal of all ACM in the building and steam tunnel system. Additional testing will be conducted to verify the locations of ACM.
| 03/05/2024 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.