General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
ITC Modernization-Parking Lot
This project will remove and replace all the concrete parking surface of Lot 403. Adjacent Sidewalks will be replaced and alignments improved to the AEB and tunnel access. There will be several overgrown tree removals with new plant material, amended soils and mulch installed to enhance the site. Site electrical, Site utilities and Stormwater engineering will be part of the project.
01/30/2025 08:00 PM UTC
Campbell Hall Asbestos Abatement
Asbestos Abatement for the Campbell Hall structure in preparation for demolition.
01/23/2025 08:00 PM UTC
Parking Lot Reconstruction 2024
Removal and replacement of existing asphalt and portions of existing curb and gutter as needed.
01/16/2025 08:00 PM UTC
Jennings Court Interior Improvements Phase 2
Replacement of interior finishes within several apartment units in the Jennings Court Complex. The replacement includes new flooring, paint, lighting, doors, hardware, casework, plumbing, and other miscellaneous items.
12/10/2024 08:00 PM UTC
Rod Library VAV Box Replacement Phase 3
Replace existing boxes and lined ductwork with new VAV boxes on the third floor of the library.
11/26/2024 08:00 PM UTC
Campanile Site Renovation
Renovation of the plaza around the Campanile, sidewalk alignments, removal and installation of plantings, seating, site lighting, and amenities. Donor signage is included. Bid alternates include an irrigation system, Donor bell structure and LED light fixture upgrades.
10/29/2024 07:00 PM UTC
Power Plant Transfer House Floor Replacement
General Contractor’s Scope of Work includes but is not limited to steel floor replacement including support angles, exterior metal panel infill, and replacing a damaged metal stair tread.
09/17/2024 07:00 PM UTC
Maucker Union Generator Replacement
Replace existing 30kW NG generator with new unit located at exterior loading dock. Provide new automatic transfer switch and reconnect to existing generator power distribution system.
08/29/2024 07:00 PM UTC
Sabin Hall Exterior Repairs Phase 1
Construction services to repair selected brick masonry, new joint sealant and repair of the existing roof top skylight. Also included is repair of selected areas of the clay tile roof and tuckpointing the stone masonry surrounds at three (3) entrances. Work includes bidding the project and construction administration.
06/06/2024 07:00 PM UTC
Seerley Hall Gutter and Clay Tile Roof Repairs
This project will include demolition and disposal of existing membrane gutter lining and accessories, repair/replacement of any degraded underlayment and blocking and installation of new membrane gutter liner, terminations and sheet metal drip edge. Additional work includes selective replacement of damaged clay roof tiles.
05/30/2024 07:00 PM UTC
41 - 50 of 164 Solicitations
1 2 3 5 7 8 9 16 17