General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Wellness Recreation Center Roof Replacement Phase 1
Remove existing membrane and insulation as noted on the documents. A new membrane roof system with additional insulation is to replace it.
06/07/2022 07:00 PM UTC
Institutional Roads 2022
As part of the 2022-2026 Institutional Roads program, UNI will include reconstruction of Strayer-Wood Theater Loop Drive and pavement repairs and maintenance on Panther Parkway. The project shall also include new sidewalks at the SWT location that are not eligible for P & IR funding. Replacement of the water utility service to Strayer-Wood Theater shall also be included in this project.
06/07/2022 07:00 PM UTC
Roth Roof Replacement & Exterior Improvements
Full replacement of the existing standing seam metal roof. The new roof shall be a luxury asphalt shingle roof system over the existing roof deck material. Includes new roof insulation, flashings, gutters, masonry tuckpointing of selected areas and re-caulk of masonry window joints.
05/19/2022 07:00 PM UTC
Applied Engineering Building Modernization - Trade Package 01A - General Trades
Applied Engineering Building Modernization - Trade Package 01A - General Trades for Knutson Construction BP #2 Bid Solicitation Manual
04/05/2022 07:00 PM UTC
Applied Engineering Building Modernization - Trade Package 03A/03B - Cast-in-Place Concrete (Renovation)
Applied Engineering Building Modernization - Trade Package 03A/03B - Cast-in-Place Concrete (Renovation) for Knutson Construction BP #2 Bid Solicitation Manual
04/05/2022 07:00 PM UTC
Nielsen Field House Roof Replacement Phase 1
Tear off existing membrane and any wet insulation that is discovered. Replacement with additional insulation to achieve energy code requirements and installation of new membrane.
03/22/2022 07:00 PM UTC
Roth Roof Replacement & Exterior Improvements
Full replacement of the existing standing seam metal roof. The new roof shall be a prefinished standing seam metal roof system over the existing roof deck material. Includes new roof insulation, flashings, gutters, masonry tuckpointing of selected areas and re-caulk of masonry window joints.
03/22/2022 07:00 PM UTC
Maucker Union Room 113 International Engagement Updates
Modifications to Maucker Union Suite 113 including, but not limited to: new walls, ceilings, finishes and modifications to existing casework, electrical, plumbing, and mechanical systems.
03/17/2022 07:00 PM UTC
Power Plant Fuel Oil Piping Replacement
Replace compromised piping system, aging equipment, and improve reliability for the Power Plant No. 2 Fuel Oil system. Project will also upgrade associated auxiliary systems, including instrumentation, electrical service, and the process control system.
03/15/2022 07:00 PM UTC
Curris Business Building Rooms 19 & 21 HVAC Upgrades Phase 1
Installation of computer room air conditioning unit for Room 21, including roof mounted air cooled condensing unit and associated refrigeration piping and power.
02/22/2022 08:00 PM UTC
61 - 70 of 138 Solicitations