General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Jennings Courts Fiber Optic Installation
This project will install buried conduits from the existing fiber in-ground box to the Jennings Courts apartments for the installation of fiber optic cables to support UNI data for WiFi. 120V power will also be provided for the IT swtiches.
11/17/2022 08:00 PM UTC
Warehouse 1 Storm Sewer Improvements
Upgrade Warehouse 1 Storm Sewer System
09/27/2022 07:00 PM UTC
Campanile Carillon Renovation
Complete renovation of the existing carillon instrument within the Campanile. Design and construction for this scope of work will be provided by the University of Northern Iowa via a contract with the Verdin Company. Ancillary “non-bell” project scope includes: installation of a new stair from the clock floor up to the playing room floor, new belfry access hatch, acoustical upgrades at the playing room, structural modifications to the playing room floor, upgrade of power requirements, upgrade of lighting requirements, adding controls for heating and ventilation and IT rough in for a future camera feed.
06/30/2022 07:00 PM UTC
Gallagher Bluedorn Performing Arts Center Great Hall Orchestra Level Seating Replacement
Stripping and waxing of existing concrete floor, cut in new trenches for cable management, and replacement and leveling of existing orchestra pit stage floor. The removal and replacement of fixed seating shall be by the owner under separate contract. The bidding contractor is to coordinate with the owner's representative.
06/30/2022 07:00 PM UTC
Area VI South Pedestrian Bridge Replacement
Replace pedestrian bridge that spans Dry Run Creek and connects the University South Campus to the Jennings Court and Roth Housing Complex area.
06/23/2022 07:00 PM UTC
Wellness Recreation Center Roof Replacement Phase 1
Remove existing membrane and insulation as noted on the documents. A new membrane roof system with additional insulation is to replace it.
06/07/2022 07:00 PM UTC
Institutional Roads 2022
As part of the 2022-2026 Institutional Roads program, UNI will include reconstruction of Strayer-Wood Theater Loop Drive and pavement repairs and maintenance on Panther Parkway. The project shall also include new sidewalks at the SWT location that are not eligible for P & IR funding. Replacement of the water utility service to Strayer-Wood Theater shall also be included in this project.
06/07/2022 07:00 PM UTC
Roth Roof Replacement & Exterior Improvements
Full replacement of the existing standing seam metal roof. The new roof shall be a luxury asphalt shingle roof system over the existing roof deck material. Includes new roof insulation, flashings, gutters, masonry tuckpointing of selected areas and re-caulk of masonry window joints.
05/19/2022 07:00 PM UTC
Applied Engineering Building Modernization - Trade Package 01A - General Trades
Applied Engineering Building Modernization - Trade Package 01A - General Trades for Knutson Construction BP #2 Bid Solicitation Manual
04/05/2022 07:00 PM UTC
Applied Engineering Building Modernization - Trade Package 03A/03B - Cast-in-Place Concrete (Renovation)
Applied Engineering Building Modernization - Trade Package 03A/03B - Cast-in-Place Concrete (Renovation) for Knutson Construction BP #2 Bid Solicitation Manual
04/05/2022 07:00 PM UTC
61 - 70 of 143 Solicitations
1 2 3 4 5 7 9 10 11 14 15