General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Maucker Union Tuckpointing & Concrete Repairs
This project consists of sealant, masonry, and concrete repair work. Existing damage has been caused by age, deterioration, moisture intrusion, freeze/thaw cycles, and limited subsidence of flatwork. Sealant joint replacement, solid surface epoxy repairs, concrete patching, repointing of existing brick, replacement of damaged brick, and removal and replacement of flatwork to existing joints will be project requirements. There are four (4) areas requiring attention.
04/13/2023 07:00 PM UTC
Rod Library VAV Box Replacement Phase 1
Replace existing boxes and lined ductwork with new VAV boxes on the first floor of the library.
04/04/2023 07:00 PM UTC
Institutional Roads 2023
Reconstruction of Wisconsin Street and adjacent sidewalks.
03/30/2023 07:00 PM UTC
Multi-Modal Structural Improvements
Repair grout pockets and install vertical coating, slab-on-grade and post-tensioned concrete slab repairs, concrete column, beam, and wall repairs, repair caulk at joints and coves, and apply traffic coating.
03/30/2023 07:00 PM UTC
UNI Rider Hall NE Entrance Canopy
This project located on the NE side of Rider Hall will provide a much needed new entrance canopy for this location. The existing canopy has been removed. The new canopy will have new exposed structural steel, an EPDM roof membrane and cable tie backs to the existing wall. Existing brick masonry will be patched back to match the existing construction.
03/28/2023 07:00 PM UTC
Hagemann Hall and Hagemann and Rider Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation (except for Roof Area 4), adhere/mechanically attach new insulation, adhere new coverboard and install new adhered Fleecebacked KEE membrane.
02/23/2023 08:00 PM UTC
UNI-Dome Fabric Roof Replacement
Replacement of the existing fabric roof with a new PTFE fiberglass membrane while keeping the existing cable and other existing fabric support structure. In addition to the roof replacement, a new fall protection system is to be installed to provide access to all roof levels. The existing waterproofing at entrance canopies, lower & upper gutter, ring beam and cupola is to be replaced or repaired with new waterproofing.
01/31/2023 08:00 PM UTC
Rider Hall Riser Valve Replacement
Installation of heating water riser isolation and drain valves and associated piping insulation and alternate for installing balancing valves at student room convectors.
12/13/2022 08:00 PM UTC
Rider Hall Heating Pumps and Valves Replacement Phase 1
Replacement of the pumps and existing valves in Rider Hall heating system including additional valves so that sections of the heating system can be shut down rather than the entire system when it needs to be worked on.
12/13/2022 08:00 PM UTC
Jennings Courts Fiber Optic Installation
This project will install buried conduits from the existing fiber in-ground box to the Jennings Courts apartments for the installation of fiber optic cables to support UNI data for WiFi. 120V power will also be provided for the IT swtiches.
11/17/2022 08:00 PM UTC
61 - 70 of 152 Solicitations