26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment
The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications.
Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor.
Engineer's Estimate: $279,000.00
| 04/09/2026 06:30 PM UTC |
|
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement
The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation.
Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $105,000
| 04/16/2026 03:30 PM UTC |
|
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms.
A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365.
| 04/22/2026 03:30 PM UTC |
| Number | Deadline |
|---|---|
|
25-02 Fire Station 2 Construction
25-02 Fire Station 2 Construction
The project consists of general, fire protection, plumbing, HVAC, electrical ,and technology work for construction of new fire station and related site work.
A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio.
State of Ohio Prevailing Wage Rates for Building Construction apply.
Estimate: $5,700,000
| 01/29/2025 07:30 PM UTC |
|
24-14 Pike Street Sanitary Sewer Replacement
24-14 Pike Street Sanitary Sewer Replacement
The project consists of the replacement of approximately 745 l.f. of 8” sanitary sewer along Pike Street between St. Marys Avenue and N. Ohio Avenue including replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits.
State of Ohio prevailing wage rates apply.
Engineer's Estimate: $341,631
| 10/03/2024 03:30 PM UTC |
|
24-13 McKinley / Spruce Alley Storm Sewer Improvements
24-13 McKinley / Spruce Alley Storm Sewer Improvements
The project consists of the replacement of existing 8” clay sanitary sewer with 8” SDR-35 sanitary sewer including sanitary laterals and replacement of existing 18” clay storm sewer with new 18” reinforced concrete storm pipe including storm manholes and catch basin along the alley connecting McKinley Avenue to Spruce Street and resurfacing the alley from McKinley Avenue to Spruce Street.
State of Ohio Prevailing Wage Rates apply.
Estimate: $193,960
| 08/01/2024 06:30 PM UTC |
|
24-12 Mulberry Place Improvements
24-12 Mulberry Place Improvements
The project consists of the reconstruction of Mulberry Place between Chestnut Avenue & S. Walnut Avenue including new pavement, curb & gutter, water main, storm sewer, sanitary main and services/laterals in addition to the extension of storm sewer through the alley south of Mulberry Place to Cherry Street including reconstruction of the alley.
State of Ohio Prevailing Wage Rates apply.
Estimate: $544,269
| 08/01/2024 03:30 PM UTC |
|
24-11 Linden Ave Water Main Replacement
24-11 Linden Avenue Water Main Replacement
(Michigan Street to Park Street) OPWC #CM01AB
The project consists of replacing the existing water main on Linden Avenue & Forest Street between Michigan Street & Park Street with an 8” PVC water main, tying in at both ends of the street. The existing water services will be extended or reconnected to the new main.
Engineer's Estimate: $553,020
Addendum # 1 Engineer's Estimate $564,820
| 06/27/2024 03:30 PM UTC |
|
24-10 Robert O. New Park Improvements
24-10 Robert O. New Park Improvements
The project consists of a new 6' walking path along the outer edge of the Robert O. New Park.
Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price.
A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid.
Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only.
Engineer's Estimate: $109,463
| 06/06/2024 03:30 PM UTC |
|
24-08
24-08 WWTP Raw Water Pump #4 Replacement
The project consists of the replacement of existing raw water pump #4 with a new water pump per specifications contained within the online Bidding Documents.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $70,000
| 04/11/2024 07:00 PM UTC |
|
24-07
24-07 WWTP Screen Building Make-Up Air Unit Replacements
The project consists of the replacement of existing Reznor Make-Up Air (MUA) Units 2 & 3 with new 460 volt gas-fired MUA units to include: disconnecting & removing the existing units and furnishing & installing new units.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $86,250
| 04/11/2024 06:30 PM UTC |
|
24-09
24-09 Fourth Avenue Sanitary Sewer Replacement
The project consists of the replacement of approximately 2270 l.f. of 8” sanitary sewer on Fourth Avenue between Michigan Street and Paul Street; abandonment of approximately 185 l.f. of 8” sanitary sewer along Park Street; and replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits.
State of Ohio prevailing wage rates apply.
Engineer's Estimate: $724,515
| 04/11/2024 03:30 PM UTC |
|
24-06
24-06 St. Marys Avenue & Hoewisher Road Traffic Signal
The project includes the installation of a new mast arm traffic signal at the intersection of St. Marys Avenue & Hoewisher Road. The project schedule requires that the Contractor complete all underground work and signal pole foundations from June 2024 to August 2024 and in coordination with the General Contractor for the Burr Oak Subdivision. Final completion of the project will be July 25, 2025.
State of Ohio Prevailing Wage Rates apply.
Estimate: $355,862
| 04/04/2024 03:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.