General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-09 RWPS Generator & Electrical Improvements
26-09 RWPS Generator & Electrical Improvements The project consists of the installation of new standby power system which includes a natural gas-fueled generator and new automatic transfer switch (ATS), electrical system modifications for ATS and new variable frequency drive, vertical turbine pump, motor replacement, piping modification and construction of elevated concrete generator pad as indicated in the Drawings and Technical Specifications. An voluntary alternate is included to possibly abandon/remove existing underground storage tank (UST) system and associated piping/conduit as indicated in the Drawings and Technical Specifications. A NON-MANDATORY pre-bid meeting is scheduled for Monday, May 4, 2026 at 10:00 am located at the WTP, 880 E. Court Street, Sidney, Ohio. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $1,130,000
06/04/2026 03:30 PM UTC
26-14R Raw Water Booster Pump Replacement REBID
26-14R Raw Water Booster Pump Replacement REBID The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, May 29, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $105,000
06/04/2026 03:30 PM UTC
26-13 Great Miami River - Sidney Ohio Water Intake Dam Modification
26-13 Great Miami River - Sidney Ohio Water Intake Dam Modification The project includes the construction of a rock riffle downstream of a low-head dam and stabilization of the existing dam. The project is in the Great Miami River, along Custenborder Park in City of Sidney, Shelby County, Ohio. A pre-bid meeting will be held at 2:00 p.m. on Tuesday, June 2, 2026 onsite at 455 Canal Street, Sidney, Ohio. This meeting is not mandatory, but attendance is strongly recommended. Subcontractors, small, minority or women owned enterprises, and other interested parties are invited to attend. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. Participation goals for DBE, SBE, MBE, or EDGE have not been established for this project; however, DBEs, SBEs, MBEs, and EDGE Bidders are encouraged to review the project and consider submitting a Bid. All qualified Bidders will receive consideration without regard to race, color, religion, national origin, ancestry, age, sex, sexual orientation, handicap or disability. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $327,420
06/11/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
25-05 Temporary Office Wiring
25-05 Temporary Office Wiring The project consists of construction of an electrical service and distribution system to power fifty-six (56) temporary modular office units to be erected on the 200 block of W. Poplar Street. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $179,478
02/13/2025 03:30 PM UTC
25-08 Buckeye Avenue Sanitary Sewer Replacement
25-08 Buckeye Avenue Sanitary Sewer Replacement The project includes replacement of gravity sanitary sewer along Buckeye Avenue. State of Ohio Prevailing Wage Rates apply. Estimate: $271,975
02/06/2025 04:30 PM UTC
25-04 Stewart Subdivision Water & Sewer Replacement
25-04 Stewart Subdivision Water & Sewer Replacement The project consists of the reconstruction of Cheryl Ave., Stewart Dr., & Daniel Pl. including replacement of storm sewer, sanitary sewer waterline, sidewalk, and curb ramps from Vandemark Rd. to Vandemark Rd. Sanitary sewer will also be replaced along Vandemark Rd. from Campbell Rd. to Cheryl Ave. State of Ohio Prevailing Wage Rates apply. Estimate: $2,114,226
01/30/2025 04:30 PM UTC
25-02 Fire Station 2 Construction
25-02 Fire Station 2 Construction The project consists of general, fire protection, plumbing, HVAC, electrical ,and technology work for construction of new fire station and related site work. A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $5,700,000
01/29/2025 07:30 PM UTC
24-14 Pike Street Sanitary Sewer Replacement
24-14 Pike Street Sanitary Sewer Replacement The project consists of the replacement of approximately 745 l.f. of 8” sanitary sewer along Pike Street between St. Marys Avenue and N. Ohio Avenue including replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits. State of Ohio prevailing wage rates apply. Engineer's Estimate: $341,631
10/03/2024 03:30 PM UTC
24-13 McKinley / Spruce Alley Storm Sewer Improvements
24-13 McKinley / Spruce Alley Storm Sewer Improvements The project consists of the replacement of existing 8” clay sanitary sewer with 8” SDR-35 sanitary sewer including sanitary laterals and replacement of existing 18” clay storm sewer with new 18” reinforced concrete storm pipe including storm manholes and catch basin along the alley connecting McKinley Avenue to Spruce Street and resurfacing the alley from McKinley Avenue to Spruce Street. State of Ohio Prevailing Wage Rates apply. Estimate: $193,960
08/01/2024 06:30 PM UTC
24-12 Mulberry Place Improvements
24-12 Mulberry Place Improvements The project consists of the reconstruction of Mulberry Place between Chestnut Avenue & S. Walnut Avenue including new pavement, curb & gutter, water main, storm sewer, sanitary main and services/laterals in addition to the extension of storm sewer through the alley south of Mulberry Place to Cherry Street including reconstruction of the alley. State of Ohio Prevailing Wage Rates apply. Estimate: $544,269
08/01/2024 03:30 PM UTC
24-11 Linden Ave Water Main Replacement
24-11 Linden Avenue Water Main Replacement (Michigan Street to Park Street) OPWC #CM01AB The project consists of replacing the existing water main on Linden Avenue & Forest Street between Michigan Street & Park Street with an 8” PVC water main, tying in at both ends of the street. The existing water services will be extended or reconnected to the new main. Engineer's Estimate: $553,020 Addendum # 1 Engineer's Estimate $564,820
06/27/2024 03:30 PM UTC
24-10 Robert O. New Park Improvements
24-10 Robert O. New Park Improvements The project consists of a new 6' walking path along the outer edge of the Robert O. New Park. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $109,463
06/06/2024 03:30 PM UTC
24-08
24-08 WWTP Raw Water Pump #4 Replacement The project consists of the replacement of existing raw water pump #4 with a new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $70,000
04/11/2024 07:00 PM UTC
31 - 40 of 111 Solicitations
1 2 4 6 7 8 9 10 11 12