General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor. Engineer's Estimate: $279,000.00
04/09/2026 06:30 PM UTC
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $105,000
04/16/2026 03:30 PM UTC
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms. A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365.
04/22/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
25-02 Fire Station 2 Construction
25-02 Fire Station 2 Construction The project consists of general, fire protection, plumbing, HVAC, electrical ,and technology work for construction of new fire station and related site work. A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $5,700,000
01/29/2025 07:30 PM UTC
24-14 Pike Street Sanitary Sewer Replacement
24-14 Pike Street Sanitary Sewer Replacement The project consists of the replacement of approximately 745 l.f. of 8” sanitary sewer along Pike Street between St. Marys Avenue and N. Ohio Avenue including replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits. State of Ohio prevailing wage rates apply. Engineer's Estimate: $341,631
10/03/2024 03:30 PM UTC
24-13 McKinley / Spruce Alley Storm Sewer Improvements
24-13 McKinley / Spruce Alley Storm Sewer Improvements The project consists of the replacement of existing 8” clay sanitary sewer with 8” SDR-35 sanitary sewer including sanitary laterals and replacement of existing 18” clay storm sewer with new 18” reinforced concrete storm pipe including storm manholes and catch basin along the alley connecting McKinley Avenue to Spruce Street and resurfacing the alley from McKinley Avenue to Spruce Street. State of Ohio Prevailing Wage Rates apply. Estimate: $193,960
08/01/2024 06:30 PM UTC
24-12 Mulberry Place Improvements
24-12 Mulberry Place Improvements The project consists of the reconstruction of Mulberry Place between Chestnut Avenue & S. Walnut Avenue including new pavement, curb & gutter, water main, storm sewer, sanitary main and services/laterals in addition to the extension of storm sewer through the alley south of Mulberry Place to Cherry Street including reconstruction of the alley. State of Ohio Prevailing Wage Rates apply. Estimate: $544,269
08/01/2024 03:30 PM UTC
24-11 Linden Ave Water Main Replacement
24-11 Linden Avenue Water Main Replacement (Michigan Street to Park Street) OPWC #CM01AB The project consists of replacing the existing water main on Linden Avenue & Forest Street between Michigan Street & Park Street with an 8” PVC water main, tying in at both ends of the street. The existing water services will be extended or reconnected to the new main. Engineer's Estimate: $553,020 Addendum # 1 Engineer's Estimate $564,820
06/27/2024 03:30 PM UTC
24-10 Robert O. New Park Improvements
24-10 Robert O. New Park Improvements The project consists of a new 6' walking path along the outer edge of the Robert O. New Park. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $109,463
06/06/2024 03:30 PM UTC
24-08
24-08 WWTP Raw Water Pump #4 Replacement The project consists of the replacement of existing raw water pump #4 with a new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $70,000
04/11/2024 07:00 PM UTC
24-07
24-07 WWTP Screen Building Make-Up Air Unit Replacements The project consists of the replacement of existing Reznor Make-Up Air (MUA) Units 2 & 3 with new 460 volt gas-fired MUA units to include: disconnecting & removing the existing units and furnishing & installing new units. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $86,250
04/11/2024 06:30 PM UTC
24-09
24-09 Fourth Avenue Sanitary Sewer Replacement The project consists of the replacement of approximately 2270 l.f. of 8” sanitary sewer on Fourth Avenue between Michigan Street and Paul Street; abandonment of approximately 185 l.f. of 8” sanitary sewer along Park Street; and replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits. State of Ohio prevailing wage rates apply. Engineer's Estimate: $724,515
04/11/2024 03:30 PM UTC
24-06
24-06 St. Marys Avenue & Hoewisher Road Traffic Signal The project includes the installation of a new mast arm traffic signal at the intersection of St. Marys Avenue & Hoewisher Road. The project schedule requires that the Contractor complete all underground work and signal pole foundations from June 2024 to August 2024 and in coordination with the General Contractor for the Burr Oak Subdivision. Final completion of the project will be July 25, 2025. State of Ohio Prevailing Wage Rates apply. Estimate: $355,862
04/04/2024 03:30 PM UTC
31 - 40 of 108 Solicitations
1 2 4 6 7 8 9 10 11