23-11
23-12 Brooklyn Avenue Sewer Diversion **ADDENDUM NO. 1 ISSUED JULY 27, 2023** **ADDENDUM NO. 2 ISSUED AUGUST 3, 2023** The project includes the construction of a relief sanitary trunk line parallel to the existing sewer interceptor across the Great Miami River in the City of Sidney, Ohio. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. A Non-Mandatory Pre-Bid Meeting will be held at 10:00 a.m. on Thursday, July 27. 2023 in the Council Chambers, Municipal Building, 201 W. Poplar Street, Sidney, Ohio. Engineer's Estimate: BASE (w/PVC) $1,272,950 ALTERNATE 1 (w/Ductile Iron) $1,385,400 ALTERNATE 2 (w/Prestressed Concrete Cylinder $1,317,200
08/10/2023 03:30 PM UTC
23-11
23-11 Broadway Avenue Water Main Replacement (Parkwood St to Hoewisher Rd) OPWC #CM03AA The project consists of abandoning the existing 10” cast iron water main and replacing with 12” PVC water main including gate valves, water service branches, fire hydrants, storm and sewer repairs, layout staking, and necessary concrete and pavement removals and restoration. Engineer's Estimates: Phase 2A $456,510 Phase 2B Alt. #1 $583,830 Phase 2 (A & B) Alt. #2 $1,010,935
07/27/2023 03:30 PM UTC
23-10 Airport Construct Parallel Taxiway
23-10 Airport Construct Parallel Taxiway **ADDENDUM #1 ISSUED 6-20-23** **ADDENDUM #2 ISSUED 6-27-23** The project includes excavation, precast drainage structures, placement of aggregate and asphalt, pavement markings, and airfield lighting. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor. DBE Goal 4% Engineer's Estimate: $3,828,280
06/29/2023 03:00 PM UTC
23-09 Mason Road Lift Station Repairs
23-09 Mason Road Lift Station Repairs The project includes the furnishing of all labor, materials, transportation, tools, supplies, equipment, appurtenances, mobilization/demobilization, and bonding necessary to repair the Mason Road lift station per project specifications. A pre-bid meeting is NOT scheduled. Site visits are recommended and may be coordinated by contacting Utilities Director, William Blakely at 937.498.8152 or WBlakely@SidneyOH.com prior to 2:00 p.m. on Thursday, June 8, 2023. Work is to be performed during a major industrial plant shutdown and is under a strict timeframe. The work will need to begin on Thursday, July 6, 2023 with completion by Friday, July 7, 2023. An extension may be permitted into Saturday, July 8, 2023 if necessary but under no circumstances can the project extend beyond 12:00 noon on Sunday, July 9, 2023. State of Ohio prevailing wages are required. Estimate: $62,000
06/14/2023 03:30 PM UTC
23-08 Alpine Court Reconstruction
23-08 Alpine Court Reconstruction The project consists of the reconstruction of roadway on Alpine Court between the existing curb including pavement & pavement markings. The existing curbs are to remain in place. Engineer's Estimate: $285,370
05/11/2023 07:00 PM UTC
23-07 Pt. Jefferson Road Storm Outlet
23-07 Pt. Jefferson Road Storm Outlet The project consists of erosion repairs of storm water outfall. Engineer's Estimate: $227,390
05/11/2023 03:30 PM UTC
23-06
23-06 Sidney City Airport Apron B, D, & F Rehabilitation The project includes asphalt milling, placement of sand slurry seal and asphalt and pavement markings. Engineer's Estimate: $295,100 ADDENDUM NO. 1 Engineer's Estimate $329,075
05/01/2023 03:30 PM UTC
CDD23-01
Former Wagner Manufacturing Site Building Demolition, Asbestos Abatement, and Site Clearing ADDENDUM #1 ISSUED MARCH 17, 2023 ADDENDUM #2 ISSUED MARCH 23, 2023 ADDENDUM #3 ISSUED MARCH 24, 2023 ADDENDUM #4 ISSUED APRIL 6, 2023 ****An additional site visit will be held March 31, 2023 at 10:00 a.m. EST. This additional site visit is optional and is only for those who attended the mandatory Pre-Bid meeting on March 22, 2023. Those wishing to participate should meet at the site.***** A MANDATORY PRE-BID CONFERENCE will be held for prospective bidders on March 22, 2023, at 10:00 a.m. (EST) at Council Chambers, City Hall, 201 West Poplar Street, Sidney, Ohio 45365. The project includes the furnishing of all material; equipment; and labor necessary in the demolition, removal, including asbestos-containing materials (ACM) abatement, and disposal of the existing building on the former Wagner Manufacturing site. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $3,440,525
04/12/2023 07:00 PM UTC
23-05
23-05 2023 Sidewalk Program The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching. Construction Estimate: $144,960
03/16/2023 03:30 PM UTC
23-04
Echo Drive Extension The project includes the construction for the extension of Echo Drive to connect with Folkerth Avenue including sanitary sewer & storm sewer. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $458,104
02/23/2023 04:30 PM UTC