General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor. Engineer's Estimate: $279,000.00
04/09/2026 06:30 PM UTC
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $105,000
04/16/2026 03:30 PM UTC
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms. A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365.
04/22/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
25-14 Graceland Cemetery Chip & Seal Program 2025
25-14 Graceland Cemetery Chip & Seal Program 2025 The project consists of chip sealing the drives and parking lots at Graceland Cemetery. State of Ohio Prevailing Wage Rates apply. Estimate: $93,918.50
03/06/2025 04:30 PM UTC
25-15 WTP Raw Water Pump Replacements
25-15 WTP Raw Water Pump Replacements The project consists of the replacement of two (2) existing raw water pumps with new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or sepley@SidneyOH.com prior to Wednesday, February 19, 2025 at 1:00 pm. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $150,000
02/27/2025 08:30 PM UTC
25-10 Aldrin Drive Water Main Replacement
25-10 Aldrin Drive Water Main Replacement The project consists of the replacement of water main along Aldrin Drive between Lunar Street and Apollo Street. State of Ohio Prevailing Wage Rates apply. Estimate: $237,459
02/27/2025 04:30 PM UTC
25-09 Taft Street Waterline & Sanitary Sewer Replacement
25-09 Taft Street Waterline & Sanitary Sewer Replacement The project consists of the replacement of existing 8" clay sanitary sewer with new 8" SDR-35 sanitary sewer along Taft Street between Hall Avenue & S. Highland Avenue and includes the replacement of manholes and service laterals with inspection chambers. and the replacement of the existing 4" cast iron water line with new 8" C-909 PVC water line, including service laterals and fire hydrants. State of Ohio Prevailing Wage Rates apply. Estimate: $638,980.60
02/20/2025 04:30 PM UTC
25-01 Municipal Building Additions & Alterations
25-01 Municipal Building Additions & Alterations The project consists of the partial demolition of existing structure (1939 building), general, fire protection, plumbing, HVAC, electrical, technology work for construction of a new addition to and renovation of the existing 1975 building and related site work. A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio. A walk-through of the site will be offered during the pre-bid meeting. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $13,900,000
02/19/2025 04:30 PM UTC
25-03 2025 Sidewalk Program
25-03 2025 Sidewalk Program The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching. State of Ohio Prevailing Wage Rates apply. Construction Estimate: $264,930
02/13/2025 07:30 PM UTC
25-06 Foraker Avenue Water & Sewer Replacement
Project name: Foraker Avenue Water & Sewer Replacement Project Description: The project consists of the replacement of gravity sanitary sewer and water main along Foraker Avenue between Fair Road and Lincoln Street. The project requires the use of State of Ohio Prevailing Wage Rates for Heavy Highway. Estimate: $1,261,620
02/13/2025 04:30 PM UTC
25-05 Temporary Office Wiring
25-05 Temporary Office Wiring The project consists of construction of an electrical service and distribution system to power fifty-six (56) temporary modular office units to be erected on the 200 block of W. Poplar Street. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $179,478
02/13/2025 03:30 PM UTC
25-08 Buckeye Avenue Sanitary Sewer Replacement
25-08 Buckeye Avenue Sanitary Sewer Replacement The project includes replacement of gravity sanitary sewer along Buckeye Avenue. State of Ohio Prevailing Wage Rates apply. Estimate: $271,975
02/06/2025 04:30 PM UTC
25-04 Stewart Subdivision Water & Sewer Replacement
25-04 Stewart Subdivision Water & Sewer Replacement The project consists of the reconstruction of Cheryl Ave., Stewart Dr., & Daniel Pl. including replacement of storm sewer, sanitary sewer waterline, sidewalk, and curb ramps from Vandemark Rd. to Vandemark Rd. Sanitary sewer will also be replaced along Vandemark Rd. from Campbell Rd. to Cheryl Ave. State of Ohio Prevailing Wage Rates apply. Estimate: $2,114,226
01/30/2025 04:30 PM UTC
21 - 30 of 108 Solicitations
1 3 5 6 7 8 9 10 11