26-09 RWPS Generator & Electrical Improvements
26-09 RWPS Generator & Electrical Improvements The project consists of the installation of new standby power system which includes a natural gas-fueled generator and new automatic transfer switch (ATS), electrical system modifications for ATS and new variable frequency drive, vertical turbine pump, motor replacement, piping modification and construction of elevated concrete generator pad as indicated in the Drawings and Technical Specifications. An voluntary alternate is included to possibly abandon/remove existing underground storage tank (UST) system and associated piping/conduit as indicated in the Drawings and Technical Specifications. A NON-MANDATORY pre-bid meeting is scheduled for Monday, May 4, 2026 at 10:00 am located at the WTP, 880 E. Court Street, Sidney, Ohio. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $1,130,000
06/04/2026 03:30 PM UTC
26-14R Raw Water Booster Pump Replacement REBID
26-14R Raw Water Booster Pump Replacement REBID The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, May 29, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $105,000
06/04/2026 03:30 PM UTC
26-13 Great Miami River - Sidney Ohio Water Intake Dam Modification
26-13 Great Miami River - Sidney Ohio Water Intake Dam Modification The project includes the construction of a rock riffle downstream of a low-head dam and stabilization of the existing dam. The project is in the Great Miami River, along Custenborder Park in City of Sidney, Shelby County, Ohio. A pre-bid meeting will be held at 2:00 p.m. on Tuesday, June 2, 2026 onsite at 455 Canal Street, Sidney, Ohio. This meeting is not mandatory, but attendance is strongly recommended. Subcontractors, small, minority or women owned enterprises, and other interested parties are invited to attend. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. Participation goals for DBE, SBE, MBE, or EDGE have not been established for this project; however, DBEs, SBEs, MBEs, and EDGE Bidders are encouraged to review the project and consider submitting a Bid. All qualified Bidders will receive consideration without regard to race, color, religion, national origin, ancestry, age, sex, sexual orientation, handicap or disability. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $327,420
06/11/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
25-11 Tilberry Run Drainage Ditch Improvements
25-11 Tilberry Run Drainage Ditch Improvements The project consists of the regrading of ditch bank, the addition of gabion walls and erosion control measures. State of Ohio Prevailing Wage Rates apply. Estimate: $267,339
05/01/2025 06:30 PM UTC
25-16 Russell Road / St. Marys Avenue Radar & Installation
25-16 Russell Road / St. Marys Avenue Radar & Installation The project involves the installation of advanced and stop line radar detection and abandonment of existing loop detectors at the intersection of Russell Road and St. Marys Avenue. State of Ohio Prevailing Wage Rates for Heavy Highway apply. Estimate: $85,000
04/17/2025 03:30 PM UTC
25-07 Hoge Barrett Wellfield Improvements New Water Supply Well Construction
25-07 Hoge Barrett Wellfield Improvements New Water Supply Well Construction The project involves the abandonment of three existing wells (pump bases, motors, column pipe/drop pipe, related components), the modification of three existing 16” well casings to install two new submersible pumps and pitless adapters and one new vertical turbine pump, new 8” and 10” ductile iron piping, associated electrical and instrumentation improvements, new elevated steel service platforms, drain back vaults, and air release valve vault, grading, and restoration. State of Ohio Prevailing Wage Rates apply. Estimate: $1,340,000
03/27/2025 06:30 PM UTC
25-14 Graceland Cemetery Chip & Seal Program 2025
25-14 Graceland Cemetery Chip & Seal Program 2025 The project consists of chip sealing the drives and parking lots at Graceland Cemetery. State of Ohio Prevailing Wage Rates apply. Estimate: $93,918.50
03/06/2025 04:30 PM UTC
25-15 WTP Raw Water Pump Replacements
25-15 WTP Raw Water Pump Replacements The project consists of the replacement of two (2) existing raw water pumps with new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or sepley@SidneyOH.com prior to Wednesday, February 19, 2025 at 1:00 pm. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $150,000
02/27/2025 08:30 PM UTC
25-10 Aldrin Drive Water Main Replacement
25-10 Aldrin Drive Water Main Replacement The project consists of the replacement of water main along Aldrin Drive between Lunar Street and Apollo Street. State of Ohio Prevailing Wage Rates apply. Estimate: $237,459
02/27/2025 04:30 PM UTC
25-09 Taft Street Waterline & Sanitary Sewer Replacement
25-09 Taft Street Waterline & Sanitary Sewer Replacement The project consists of the replacement of existing 8" clay sanitary sewer with new 8" SDR-35 sanitary sewer along Taft Street between Hall Avenue & S. Highland Avenue and includes the replacement of manholes and service laterals with inspection chambers. and the replacement of the existing 4" cast iron water line with new 8" C-909 PVC water line, including service laterals and fire hydrants. State of Ohio Prevailing Wage Rates apply. Estimate: $638,980.60
02/20/2025 04:30 PM UTC
25-01 Municipal Building Additions & Alterations
25-01 Municipal Building Additions & Alterations The project consists of the partial demolition of existing structure (1939 building), general, fire protection, plumbing, HVAC, electrical, technology work for construction of a new addition to and renovation of the existing 1975 building and related site work. A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio. A walk-through of the site will be offered during the pre-bid meeting. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $13,900,000
02/19/2025 04:30 PM UTC
25-03 2025 Sidewalk Program
25-03 2025 Sidewalk Program The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching. State of Ohio Prevailing Wage Rates apply. Construction Estimate: $264,930
02/13/2025 07:30 PM UTC
25-06 Foraker Avenue Water & Sewer Replacement
Project name: Foraker Avenue Water & Sewer Replacement Project Description: The project consists of the replacement of gravity sanitary sewer and water main along Foraker Avenue between Fair Road and Lincoln Street. The project requires the use of State of Ohio Prevailing Wage Rates for Heavy Highway. Estimate: $1,261,620
02/13/2025 04:30 PM UTC