General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1001
City of Findlay Fire Hydrants, Gate Valves, & Sewer Pipes RFB - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
12/22/2025 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
35293200
City of Findlay Airport Crack Seal and Re-Mark Runway 7-25. Pre-Bid Meeting will be held on Monday, June 17, 2019 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840 Engineer's Estimate (Base Bid)- $176,000.00
06/27/2019 06:00 PM UTC
35681200
City of Findlay WPCC UV Replacement & Improvements This project consists of replacing the existing UV disinfection system and modification of the existing UV channel. The contract also includes, but not limited to; construction of new UV bypass pipe, replacing existing spray water pumps, replace existing process water pump and locate in a newly constructed process water pit, and replacement of effluent sampler. Substantial Completion Date: April 20, 2020 Final Completion Date: May 31, 2020 Engineer’s Estimate: $2,570,000
06/19/2019 06:00 PM UTC
35793300
City of Findlay Olive Street 8-inch Waterline Replacement. This project consists of installing a new 8-inch C909 waterline on Olive Street., running along the south side of the roadway, in the center westbound lane of Olive Street., from S. Main Street to the west side of Fairmount Drive. The new waterline will need to be directional drilled under S. Main Street to the west side of the southbound curb, to tap onto the existing 6-inch line. This project shall consist of, but not limited to, 960 LF of 8-inch C909 waterline, 100 LF of 8-inch directional drill (alternate), 100 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. Substantial Completion Date: August 30, 2019 Final Completion Date: September 13, 2019 Engineer’s Estimate: $130,000.00
06/19/2019 06:00 PM UTC
31993800
Letters of Interest for ODOT Pre-qualified Consultants for Blanchard River Greenway Extension 2 (PID 109009) LOI Package Requirements can be downloaded for free but must be mailed/delivered to the City of Findlay as outlined in the documents. The selected firm shall provide the services necessary to prepare a complete set of construction plans and specifications for construction of the project.
06/14/2019 08:00 PM UTC
35782800
City of Findlay Reservoir Infrastructure Improvements. Work under Contract includes, but is not limited to, replacing existing valve vault valves and piping, rehabilitating the (2) concrete reservoir transfer pipes, and automating the valves at pump station #1 to open for emergency draining of the reservoirs. The work also includes adding actuators to two existing effluent valves at Reservoirs #1 and #2. Included, but not limited to, are electrical pullboxes, metering chambers, piping installed by open-cut and trenchless methods, and all other work required in accordance with the contract documents. Final Completion: June 5, 2020 Engineer's Estimate: $625,000.00
06/11/2019 06:00 PM UTC
35790200
City of Findlay E. Bigelow Avenue 12-inch Waterline Replacement This project consists of installing a new 12-inch C909 waterline on E. Bigelow Ave., running along the north side of the roadway, in the center westbound lane of E. Bigelow Ave., from N. Main Street to the east side of the CSX Tracks. From the existing 12-inch waterline located on E. Bigelow Ave., just east of the Main Street intersection the proposed waterline will extend east toward the CSX Railroad. Once at the CSX tracks the proposed waterline will be jack and bored under the tracks with a 20-inch casing pipe. After the CSX Jack and Bore, the waterline will continue to the east roughly 100 LF and tie back into the existing 12-inch that is located on the north side of E. Bigelow. This project shall consist of, but not limited to, 1300 LF of 12-inch C909 waterline, 60 LF of 20-inch casing pipe jack and bore, 60 LF of 12-inch Certalock waterline, , 60 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. Substantial Completion Date: October 4, 2019 Final Completion Date: November 8, 2019 Engineer’s Estimate: $260,000.00
06/05/2019 06:00 PM UTC
City of Findlay Pavement Marking
City of Findlay-2019 Annual Pavement Marking Project. This project will consist of pavement marking in various locations across the City of Findlay. Due to fading existing pavement markings will need new paint to be applied to them. This project will consist of four different types of markings, dashed white (37.29 mile), dashed yellow (8.30 mile, double yellow (45.25 mile), and white edge line (30.37 mile). All paint must adhere to Ohio Manual of Uniform Traffic Control Devices standards. EXPECTED START DATE: August 1, 2019 FINAL COMPLETION DATE: September 20, 2019 ENGINEER’S ESTIMATE: $ 55,000
04/23/2019 06:00 PM UTC
35790100
City of Findlay Blanchard Street 16-inch Waterline Replacement. This project consists of installing a new 16-inch C905 waterline on South Blanchard Street, running along the east side of the roadway, from E. Sandusky Street to Sixth Street. From an existing 36-inch waterline stub located on South Blanchard Street just south of the E. Sandusky Street intersection the proposed waterline will extend south toward Eagle Creek. The proposed waterline will be jack and bored under eagle creek with a 22-inch casing pipe. After the Eagle Creek bore the waterline will continue to the south side of the Sixth Street intersection and tie into the existing 10-inch waterlines in the area. This project will consist of multiple waterline abandonments and tie-ins within the project limits. Due to the depth of the existing sewers and sewer laterals, the proposed 16-inch waterline is expected to be 9 foot deep for majority of the run. As part of the proposed waterline project there will be 180 LF of the 16-inch waterline that will need to be jack and bored with a 22-inch casing pipe from north side of Eagle Creek to the south side. The 16-inch waterline pipe running through the casing pipe shall be C905 Certalock pipe, or equal. This project shall consist of, but not limited to, 5100 LF of 16-inch C905 waterline, 180 LF of 22-inch casing pipe jack and bore 180 LF of 16-inch Certalock waterline, 110 LF of 12-inch C909 waterline, 60 LF of 10-inch C909 waterline, 100 LF of 8-inch waterline, 60 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. Substantial Completion Date: September 27, 2019 Final Completion Date: November 1, 2019 Engineer’s Estimate: $1,375,000.00
03/26/2019 06:00 PM UTC
35284600
City of Findlay Airport Wind Cone and Beacon Relocation and Replacement. Pre-Bid Meeting will be held on Wednesday, February 13, 2019 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840 Engineer's Estimate (Base Bid)- $86,000.00 Engineer's Estimate (Alt. Bid)- $15,000.00
02/21/2019 07:00 PM UTC
32890300-A
City of Findlay 2019 Annual Resurfacing Program-Contract A (Concrete) This project consists of nearly 24,902 (LF) of curb removal and replacement on various streets within the City of Findlay in Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 8,500 SF), concrete drive replacement (approximately 690 SY), asphalt drive replacement (approximately 952 SY), adjustment of manholes and catch basins, grading and seeding. Other minor work is described in the details for each segment of pavement. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session. The 2016 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. The project is funded through the City of Findlay’s Capital Improvements Fund. State prevailing wages and the City of Findlay income taxes shall apply. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Final Completion for Each Group: Group One: On or Before July 5, 2019 Group Two: On or Before August 30, 2019 Engineering Estimate: $ 690,000 (Base Bid)
02/21/2019 07:00 PM UTC
291 - 300 of 341 Solicitations
1 2 26 27 28 30 32 33 34 35