General Info

Business Logo

Milwaukee County

633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4953

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WY045606 Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots
Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots. PreBid Meeting: Rescheduled, now Tuesday, June 11 at 9:00 a.m at Coggs Building, Conference Room 104.
06/27/2024 07:00 PM UTC
WY012306 Parkway Drive Conversion to Bicycle & Pedestrian Trail
Milwaukee County will be converting existing Asphalt Roadways within the Lincoln Creek Parkway (from N.23rd Street to N.27th Street) and Little Menomonee River Parkway (From Appleton Avenue to Leon Terrace) to a pedestrian pathway/trail. Existing asphalt and concrete pavement, concrete curb and gutter, will be removed and replaced with a 10-foot-wide asphalt path with gravel shoulders. Proposed storm sewer culverts, structures, and piping will be installed at low points. Existing storm structures will remain with minor adjustments. Landscaping trees, turf grass restoration, bollards, stone barriers, pedestrian and bicycle trail signage will be installed as part of the project. Traffic control will be required at project locations. Pre Bid Meeting June 18, at 2:00 p.m. via Microsoft Teams - see advertisement for link
07/10/2024 07:00 PM UTC
C217-20206 Milwaukee County Courthouse Phase 3 Facade Repair
Courthouse Limestone Façade Repair – phase 3 encompasses the following base-bid work: Area of Work 1: East Elevation Complete façade repairs as shown on sheets A202-A204 and as designated during inspections by consultant/owner. Area of Work 2: (Low) East Entrances Rebuild/replace stone at East building Entrances. Refer to sheets A203 and A301. Area of Work 3: South Elevation Complete façade repairs as shown on sheet A205 and as designated during inspections by consultant/owner. Replace built-in copper gutter at sixth-floor cornice. Refer to sheet A205. Refer to photo no. 1 on sheet A501. Deductive Alternate No. 1: Deduction to base bid all associated costs included in Area of Work 2. Alternate A: East and South Elevation Cleaning Clean East and South Elevations 100% below fourth floor water table. Alternate B: 100% Façade Cleaning Clean 100% of the Limestone Facades at all Elevations. MANDATORY Pre-Bid Meeting June 21st, 2024, at 11:00 AM.- This will be a Virtual Teams Meeting – See Bid Documents for Meeting Link information. OPTIONAL Site Visit Tour June 24th, 2024 at 10:00 AM. Tour information available on Addendum One.
07/10/2024 09:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP1 (Demolition)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP2 (New Concourse E)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP3 (Fueling)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP4 (Boarding Bridges)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WO517-16436 -WAR MEMORIAL CENTER LOWER-LEVEL RESTROOMS
Contract Description: Demolition of existing restrooms and south doors, construction of new restrooms, locker room, storage area and entry. Pre-Bid Meeting: July 1, 2024, at 9am. Meet at the Lower Level, North entry, in the lobby in front of the help desk.
08/02/2024 09:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 06A Carpentry & Specialties
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 05A Structural Steel & Misc. Metals
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 04A Masonry
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03C Artificial Rockwork & Theming
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03B Precast
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03A Concrete
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 02A Demolition
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0160: Milwaukee County Zoo Admin Building Roof Replacement
Replacement of approximately 11,070 Square Feet of the Administration Building Roof. Non-Mandatory Pre-Bid Meeting: Wednesday, March 13th from 9:00 – 10:00 AM at the Milwaukee County Zoo’s Administration Building.
04/03/2024 07:00 PM UTC
WA0295 (Expansion Joint Replacement), WA0411 (Traffic Bearing Membrane/Sealer), WA0432 (Post Tensioned Anchorages)
This project includes the repair or replacement of existing expansion joints, concrete column repairs, beam repairs, concrete crack repair, post tensioned concrete repair work, concrete membrane/sealer placement, post tensioned anchorage waterproofing repair/inspection/sealing at the MKE Airport Parking Structure. WA0295 Expansion Joint Replacement includes one Base Bid and Two Alternates. WA0411 Traffic Bearing Membrane includes a Base Bid and Three Alternates. WA0432 Post Tensioned Anchorages includes one Base Bid and One Alternate. Project Completion: If the Base Bids and any of the six (6) alternatives are awarded, the contractor shall have a total of 194 consecutive calendar days to substantially complete the project, excluding punch list. If any or all additive alternatives are not awarded, the total contract time shall be as follows: Base Bids Only = 140 Calendar Days. Pre-Bid Meeting: Wednesday March 20th, 2024 at 8:30AM., held in the Sijan Conference Room, in the GMIA Terminal (Located before security in hallway behind Museum / USO), 5300 South Howell Avenue, Milwaukee, Wisconsin.
04/03/2024 07:00 PM UTC
WP0706 - South Shore Breakwater North Section - Phase 2
Contract Description: Work consists of constructing a temporary access, to relocate existing armor stones as needed to provide suitable base for new armor stones and to supply new armor stone to specified elevations and provide a smooth transition between new armor stones and existing stones on the breakwater. Optional Pre-Bid Meeting: March 20, 2024, 11:00 AM, meet at the South Shore Yacht Club
04/03/2024 07:00 PM UTC
61 - 70 of 255 Solicitations
1 2 3 4 5 7 9 10 11 25 26