Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4953
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4953
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WP005046 Lincoln Park Baseball Lighting
Demo and/or abandon any existing baseball lighting systems/facilities and install eight (8) new light poles and fixtures as specified. Coordinate with We Energies and install new electrical as required.
Pre-Bid Meeting: September 11, 2024 at 11am. Meet at Hank Aaron Field, 1301 W. Hampton Avenue.
| 09/26/2024 07:00 PM UTC |
WY012302 Crime Prevention through Environmental Design
Work of the Project includes removal and regulated disposal of all proposed excavated and tree materials associated with the King Park Berm on northwest side of the park in accordance with the plans, specifications, and permit requirements.
Pre-Bid Meeting: September 11, 2024 at 9:00am. See advertisement for Microsoft Teams Link.
| 09/27/2024 07:00 PM UTC |
WJ0113 Disaster Recovery Back-up Power at Community Reintegration Center (CRC).
This contract involves the addition of a second electrical feeder to the Community Reintegration Center facility. Bidding document distribution will be online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home.
Mandatory Pre-Bid Meeting: Tuesday, October 1st, 2024, at 10:30 AM. Meet at the Community Reintegration Center at 8885 S. 68th Street, Franklin, WI 53132. Please plan on meeting in the lobby for expedited security protocols. Please be prompt.
Bids are due no later than Wednesday, October 23rd ,2024 at 2:00 P.M. Bids are to be completed online in Bid Express internet Bidding System at: https://www.bidexpress.com/businesses/24937/home
Project Contact: Andy Tran
Contact Email: an.tran@milwaukeecountywi.gov
| 10/23/2024 07:00 PM UTC |
Number | Deadline |
---|---|
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 06A Carpentry & Specialties
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 05A Structural Steel & Misc. Metals
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 04A Masonry
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03C Artificial Rockwork & Theming
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03B Precast
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03A Concrete
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 02A Demolition
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0160: Milwaukee County Zoo Admin Building Roof Replacement
Replacement of approximately 11,070 Square Feet of the Administration Building Roof.
Non-Mandatory Pre-Bid Meeting: Wednesday, March 13th from 9:00 – 10:00 AM at the Milwaukee County Zoo’s Administration Building.
| 04/03/2024 07:00 PM UTC |
WA0295 (Expansion Joint Replacement), WA0411 (Traffic Bearing Membrane/Sealer), WA0432 (Post Tensioned Anchorages)
This project includes the repair or replacement of existing expansion joints, concrete column repairs, beam repairs, concrete crack repair, post tensioned concrete repair work, concrete membrane/sealer placement, post tensioned anchorage waterproofing repair/inspection/sealing at the MKE Airport Parking Structure. WA0295 Expansion Joint Replacement includes one Base Bid and Two Alternates. WA0411 Traffic Bearing Membrane includes a Base Bid and Three Alternates. WA0432 Post Tensioned Anchorages includes one Base Bid and One Alternate.
Project Completion:
If the Base Bids and any of the six (6) alternatives are awarded, the contractor shall have a total of 194 consecutive calendar days to substantially complete the project, excluding punch list. If any or all additive alternatives are not awarded, the total contract time shall be as follows:
Base Bids Only = 140 Calendar Days.
Pre-Bid Meeting: Wednesday March 20th, 2024 at 8:30AM., held in the Sijan Conference Room, in the GMIA Terminal (Located before security in hallway behind Museum / USO), 5300 South Howell Avenue, Milwaukee, Wisconsin.
| 04/03/2024 07:00 PM UTC |
WP0706 - South Shore Breakwater North Section - Phase 2
Contract Description: Work consists of constructing a temporary access, to relocate existing armor stones as needed to provide suitable base for new armor stones and to supply new armor stone to specified elevations and provide a smooth transition between new armor stones and existing stones on the breakwater.
Optional Pre-Bid Meeting: March 20, 2024, 11:00 AM, meet at the South Shore Yacht Club
| 04/03/2024 07:00 PM UTC |