Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Kitchen Equipment Maintenance Request For Proposal
Milwaukee County is seeking proposals from qualified contractors to provide comprehensive maintenance services, to include transportation, labor, equipment, tools, parts, and materials for kitchen equipment across multiple County facilities. These facilities include, but are not limited to:
• Community Reintegration Center (CRC)
• Milwaukee County Sheriff’s Office (MCSO)
• Youth Detention Center (YDC)
PreBid Meeting: Mandatory one person, in person per contractor. Teams link available for additional members. Meeting & Tour of 3 facilities start at CRC (8885 South 68th Street) on January 24th, 2025 at 8:30am. At front reception area. Required to enter through security.
The attached background form needs to be completed (including a copy of their driver's license and a minimum of at least the last four digits of their social security number), submitted back to Milwaukee County. Our backgrounds team requires up to 48hrs to run the checks on each individual. Once approved, their names go on the approved visiting list. Anyone who does not get approved prior to the visit, will not be allowed inside past the main lobby.
| 02/19/2025 08:00 PM UTC |
WA0433 MKE Passenger Loading Bridge Replacement
This project is for the replacement of three existing loading bridges in Concourse C (C9, C11, C25), with eleven additional bridges in alternates. The replacements include: the loading bridge itself, PC Air, GPU, and electrical connections.
Pre-Bid meeting will be done virtually via Teams. To acquire the meeting link to the pre bid meeting, please contact Kwame Amegashitsi at kamegashitsi@mitchellairport.com prior to Monday, February 10, 2025, at 5:00PM. Later requests are not guaranteed a timely response. Bids are due no later than no later than 2 P.M., Wednesday, February 26, 2025. Bids are to be completed online in Bid Express internet Bidding System.
Project Contact: Kwame Amegashitsi
Contact Email: kamegashitsi@mitchellairport.com
| 02/26/2025 08:00 PM UTC |
WA0221: GMIA MKE International Terminal Redevelopment
This project includes the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, selective demolition, construction, fueling system work. Work will be divided up into Bid Packages.
Pre-Bid Meeting: Pre bid meeting date / time is
Thursday, February 13th, 2025 from 9:00 AM to 12:00 PM.
The pre-bid meeting will be done virtually via Teams.
To acquire the meeting link, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, February 12th, 2025 at 5:00PM. Later requests are not guaranteed a timely response.
Pre-Bid Site Visit: Will be in person and meeting date / time is
Friday, February 14th, 2025 from 9:00 AM to 10:30 AM.
To register anticipated attendees for site visit, please contact James Hart at jhart@mitchellairport.com prior to Thursday, February 13th, 2025 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required.
To bid, the site visit is MANDATORY for Prime Contractors.
Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
| 03/05/2025 08:00 PM UTC |
WC0227 Milwaukee County Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 13 elevators.
The Mandatory Pre-Bid Meeting is on Monday, 02/24/25 from 10:00am - 12:00pm at 901 N 9th St, Milwaukee, WI 53233 Room G1. Pre-Registration is Required. for this meeting. Please contact Martina Foss Ashworth at mfoss@millerdunwiddie.com to register.
Project Contact: Martina Foss Ashworth
Contact Email: mfoss@millerdunwiddie.com
| 03/27/2025 07:00 PM UTC |
Number | Deadline |
---|---|
WZ0185: Zoo Humboldt Penguin Exhibit Enhancement BP 32A Landscaping & BP 32B Irrigation
The Milwaukee County Zoo in partnership with Gilbane Building Company will be renovating and expanding the existing Humboldt Penguin Exhibit located at the main entrance of the Zoo. This project will consist of a pool expansion from the existing 10,000 gallons increasing in size to 30,000 gallons (approx.). Included in this expansion is full 100% replacement/upgrade of Life Support System for increased water circulation/purification, increased visitor themed viewing experience (large viewing window) and the incorporation of shade structures for life betterment of the penguins.
Non-Mandatory Pre-Bid Meeting: July 25th at 11am.
Please meet in the main entrance lobby within the Zoo’s Administration Building.
RFIs send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before July 26th
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0185-Milwaukee-County-Zoo-Humboldt-Penguin-Exhibit-Enhancement-Landscape--Irrigation
| 08/09/2024 04:00 PM UTC |
WZ0185: Zoo Humboldt Penguin Exhibit Enhancement BP 32C Asphalt Paving
The Milwaukee County Zoo in partnership with Gilbane Building Company will be renovating and expanding the existing Humboldt Penguin Exhibit located at the main entrance of the Zoo. This project will consist of a pool expansion from the existing 10,000 gallons increasing in size to 30,000 gallons (approx.). Included in this expansion is full 100% replacement/upgrade of Life Support System for increased water circulation/purification, increased visitor themed viewing experience (large viewing window) and the incorporation of shade structures for life betterment of the penguins.
Non-Mandatory Pre-Bid Meeting: July 25th at 11am.
Please meet in the main entrance lobby within the Zoo’s Administration Building.
RFIs send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before July 26th
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0185-Milwaukee-County-Zoo-Humboldt-Penguin-Exhibit-Enhancement-Asphalt-Paving
| 08/09/2024 04:00 PM UTC |
WY012305 Brown Deer Park Golf Practice Facility
This project includes the construction of a 23,500 sf practice putting green built with 8” of rootzone mix over a 2” drainage system, along with fairway surrounds, a 1,560 sf practice bunker, and 5,300 sf asphalt cart path with concrete curbing. The project work area is 1.66 acres and will be restored with seed and sod. An “alternate bid” has been included for the laser leveling and re-sodding of the adjacent range tee area (35,000 sf).
Pre-Bid Meeting: July 22, 2024 at 11am via Microsoft Teams. See Advertisement for Teams Link.
| 08/08/2024 07:00 PM UTC |
WO517-16436 -WAR MEMORIAL CENTER LOWER-LEVEL RESTROOMS
Contract Description: Demolition of existing restrooms and south doors, construction of new restrooms, locker room, storage area and entry.
Pre-Bid Meeting: July 1, 2024, at 9am. Meet at the Lower Level, North entry, in the lobby in front of the help desk.
| 08/02/2024 09:00 PM UTC |
WA0221 MKE International Terminal Redevelopment - BP1 (Demolition)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages.
Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows:
General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min)
BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min)
BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min)
BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min)
BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min)
All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response.
Pre-bid site visits will be in person and provided as follows:
BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min)
BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min)
BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min)
To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required.
To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors.
Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
| 07/25/2024 07:00 PM UTC |
WA0221 MKE International Terminal Redevelopment - BP2 (New Concourse E)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages.
Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows:
General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min)
BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min)
BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min)
BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min)
BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min)
All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response.
Pre-bid site visits will be in person and provided as follows:
BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min)
BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min)
BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min)
To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required.
To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors.
Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
| 07/25/2024 07:00 PM UTC |
WA0221 MKE International Terminal Redevelopment - BP3 (Fueling)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages.
Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows:
General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min)
BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min)
BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min)
BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min)
BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min)
All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response.
Pre-bid site visits will be in person and provided as follows:
BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min)
BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min)
BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min)
To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required.
To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors.
Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
| 07/25/2024 07:00 PM UTC |
WA0221 MKE International Terminal Redevelopment - BP4 (Boarding Bridges)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages.
Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows:
General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min)
BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min)
BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min)
BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min)
BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min)
All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response.
Pre-bid site visits will be in person and provided as follows:
BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min)
BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min)
BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min)
To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required.
To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors.
Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
| 07/25/2024 07:00 PM UTC |
C217-20206 Milwaukee County Courthouse Phase 3 Facade Repair
Courthouse Limestone Façade Repair – phase 3 encompasses the following base-bid work:
Area of Work 1: East Elevation
Complete façade repairs as shown on sheets A202-A204 and as designated during inspections by consultant/owner.
Area of Work 2: (Low) East Entrances
Rebuild/replace stone at East building Entrances. Refer to sheets A203 and A301.
Area of Work 3: South Elevation
Complete façade repairs as shown on sheet A205 and as designated during inspections by consultant/owner. Replace built-in copper gutter at sixth-floor cornice. Refer to sheet A205. Refer to photo no. 1 on sheet A501.
Deductive Alternate No. 1:
Deduction to base bid all associated costs included in Area of Work 2.
Alternate A: East and South Elevation Cleaning
Clean East and South Elevations 100% below fourth floor water table.
Alternate B: 100% Façade Cleaning
Clean 100% of the Limestone Facades at all Elevations.
MANDATORY Pre-Bid Meeting June 21st, 2024, at 11:00 AM.- This will be a Virtual Teams Meeting – See Bid Documents for Meeting Link information.
OPTIONAL Site Visit Tour June 24th, 2024 at 10:00 AM. Tour information available on Addendum One.
| 07/10/2024 09:00 PM UTC |
WY012306 Parkway Drive Conversion to Bicycle & Pedestrian Trail
Milwaukee County will be converting existing Asphalt Roadways within the Lincoln Creek Parkway (from N.23rd Street to N.27th Street) and Little Menomonee River Parkway (From Appleton Avenue to Leon Terrace) to a pedestrian pathway/trail. Existing asphalt and concrete pavement, concrete curb and gutter, will be removed and replaced with a 10-foot-wide asphalt path with gravel shoulders. Proposed storm sewer culverts, structures, and piping will be installed at low points. Existing storm structures will remain with minor adjustments. Landscaping trees, turf grass restoration, bollards, stone barriers, pedestrian and bicycle trail signage will be installed as part of the project. Traffic control will be required at project locations.
Pre Bid Meeting June 18, at 2:00 p.m. via Microsoft Teams - see advertisement for link
| 07/10/2024 07:00 PM UTC |