WY012305 Zablocki Park Golf Course Synthetic Tee and Green Project REBID
This project includes installing new synthetic greens at Zablocki golf course. The new synthetic greens once installed will significantly reduce the operation and maintenance costs at Zablocki golf course. MANDATORY Pre-Bid Meeting: May 31st at 11am, CT.
06/14/2023 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
P697-19612 - Oak Leaf Trail Relocation Site #716
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Shared-Use Path Construction Work consists of reconstructing and relocating two segments of Milwaukee County’s Oak Leaf Trail located within the Little Menomonee Parkway, specifically on the west side of N 91st St between W. Good Hope Rd and W. Bradley Rd. Project work includes earthwork grading, removing asphalt, providing new asphalt surface, clearing and grubbing, and native seeding. Project Completion: Interim Completion of Asphalt Paving Work by November 19, 2021 or June 24th, 2022 pending weather, construction timing, and contractor option. Final Turf Restoration and Project Substantial Completion July 15th, 2022. Disadvantaged Business Enterprise (DBE) participation goal for this project is 15%.
10/20/2021 07:00 PM UTC
5300-20144 Central Fleet Maintenance HVAC Replacement
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system Project Completion/ Substantial Completion Date/Calendar Days: 150 Days (Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
10/13/2021 07:00 PM UTC
5041-21402-03 Time & Material (MKE) General Mitchell International Airport REBID
Contract 3: Carpet & Resilient Flooring. Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home no later than 2 P.M., September 29, 2021.
09/29/2021 07:00 PM UTC
P698-19613 GREENFIELD PARK OAK LEAF TRAIL CONSTRUCTION
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Trail Construction Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents. Project Completion: Work of the project shall be Substantially Complete as follows: Construction of the project shall begin on or after 10/11/2021 and shall be substantially completed by 11/19/2021. Final turf restoration shall be completed by 6/3/2022. Prime contractor shall perform at least 30 percent of the original contract amount with contractor’s own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid. Contractor shall complete the Affidavit of Non-Collusion that is part of the Bid Form confirming that the bidder has not engaged in any collusion related to the bidding of the project. Bids are to be completed online in Bid Express no later than 2 P.M., September 15, 2021. Milwaukee County project bid summary results will be posted on the Bid Express site and Milwaukee County web site at www.county.milwaukee.gov. Bid summary results may be available a few days following the Bid Due Date time.
09/15/2021 07:00 PM UTC
6533-21400-01 -2021Time & Material (MKE) Behavior Health Divison
Contract 1: General Construction
09/08/2021 07:00 PM UTC
6533-21400-02 -2021Time & Material (MKE) Behavior Health Divison
Contract 2: Plumbing
09/08/2021 07:00 PM UTC
6533-21400-03 -2021Time & Material (MKE) Behavior Health Divison
Contract 3: Fire Protection
09/08/2021 07:00 PM UTC
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
09/08/2021 07:00 PM UTC
6533-21400-05 -2021Time & Material (MKE) Behavior Health Division
Contract 5: Electrical
09/08/2021 07:00 PM UTC
6533-21400-06 -2021Time & Material (MKE) Behavior Health Division
Contract 6: Painting
09/08/2021 07:00 PM UTC