General Info

Business Logo

Milwaukee County

633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4953

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WY045606 Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots
Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots. PreBid Meeting: Rescheduled, now Tuesday, June 11 at 9:00 a.m at Coggs Building, Conference Room 104.
06/27/2024 07:00 PM UTC
WY012306 Parkway Drive Conversion to Bicycle & Pedestrian Trail
Milwaukee County will be converting existing Asphalt Roadways within the Lincoln Creek Parkway (from N.23rd Street to N.27th Street) and Little Menomonee River Parkway (From Appleton Avenue to Leon Terrace) to a pedestrian pathway/trail. Existing asphalt and concrete pavement, concrete curb and gutter, will be removed and replaced with a 10-foot-wide asphalt path with gravel shoulders. Proposed storm sewer culverts, structures, and piping will be installed at low points. Existing storm structures will remain with minor adjustments. Landscaping trees, turf grass restoration, bollards, stone barriers, pedestrian and bicycle trail signage will be installed as part of the project. Traffic control will be required at project locations. Pre Bid Meeting June 18, at 2:00 p.m. via Microsoft Teams - see advertisement for link
07/10/2024 07:00 PM UTC
C217-20206 Milwaukee County Courthouse Phase 3 Facade Repair
Courthouse Limestone Façade Repair – phase 3 encompasses the following base-bid work: Area of Work 1: East Elevation Complete façade repairs as shown on sheets A202-A204 and as designated during inspections by consultant/owner. Area of Work 2: (Low) East Entrances Rebuild/replace stone at East building Entrances. Refer to sheets A203 and A301. Area of Work 3: South Elevation Complete façade repairs as shown on sheet A205 and as designated during inspections by consultant/owner. Replace built-in copper gutter at sixth-floor cornice. Refer to sheet A205. Refer to photo no. 1 on sheet A501. Deductive Alternate No. 1: Deduction to base bid all associated costs included in Area of Work 2. Alternate A: East and South Elevation Cleaning Clean East and South Elevations 100% below fourth floor water table. Alternate B: 100% Façade Cleaning Clean 100% of the Limestone Facades at all Elevations. MANDATORY Pre-Bid Meeting June 21st, 2024, at 11:00 AM.- This will be a Virtual Teams Meeting – See Bid Documents for Meeting Link information. OPTIONAL Site Visit Tour June 24th, 2024 at 10:00 AM. Tour information available on Addendum One.
07/10/2024 09:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP1 (Demolition)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP2 (New Concourse E)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP3 (Fueling)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP4 (Boarding Bridges)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WO517-16436 -WAR MEMORIAL CENTER LOWER-LEVEL RESTROOMS
Contract Description: Demolition of existing restrooms and south doors, construction of new restrooms, locker room, storage area and entry. Pre-Bid Meeting: July 1, 2024, at 9am. Meet at the Lower Level, North entry, in the lobby in front of the help desk.
08/02/2024 09:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
WS12401 Milwaukee County Secure Residential Care Center for Children and Youth (MC-SRCCCY) - BP 31A Earthwork and Site Demo
The project consists of a 27,000 S/F two-story addition, 1,800 S/F added outdoor recreation space, and 8,800 s/f of renovation to the Vel R. Phillips Youth and Family Justice Center that will be referred to as the Secure Residential Care Center for Children and Youth (SRCCCY). The two-story addition will add a Welcome Center, Administration, Admissions & Release, Security & control, Health Center & Behavioral, Visitation, Food Services, Interior and Exterior Recreation, Education, Housing, and Secured Perimeter to the campus. The Renovation work is to existing MCAP pods and infrastructure. The completed facility is expected to house up to (50) youth. The vision for Milwaukee County SRCCCY is to Establish a safe, positive, sustainable, and developmentally appropriate treatment environment for youth committed to the county that effectively promotes accountability, protects the community, reduces recidivism, and returns youth to our community with the skills needed to become successful and productive citizens. Non Mandatory Pre-Bid Meeting: March 13, 2024 at 10am at Vel R. Phillips Juvenile Justice Center located at 10201 W Watertown Plank Rd, Milwaukee, WI 53226.
04/12/2024 07:00 PM UTC
WS12401 Milwaukee County Secure Residential Care Center for Children and Youth (MC-SRCCCY) - BP 33A Site Utilities
The project consists of a 27,000 S/F two-story addition, 1,800 S/F added outdoor recreation space, and 8,800 s/f of renovation to the Vel R. Phillips Youth and Family Justice Center that will be referred to as the Secure Residential Care Center for Children and Youth (SRCCCY). The two-story addition will add a Welcome Center, Administration, Admissions & Release, Security & control, Health Center & Behavioral, Visitation, Food Services, Interior and Exterior Recreation, Education, Housing, and Secured Perimeter to the campus. The Renovation work is to existing MCAP pods and infrastructure. The completed facility is expected to house up to (50) youth. The vision for Milwaukee County SRCCCY is to Establish a safe, positive, sustainable, and developmentally appropriate treatment environment for youth committed to the county that effectively promotes accountability, protects the community, reduces recidivism, and returns youth to our community with the skills needed to become successful and productive citizens. Non Mandatory Pre-Bid Meeting: March 13, 2024 at 10am at Vel R. Phillips Juvenile Justice Center located at 10201 W Watertown Plank Rd, Milwaukee, WI 53226.
04/12/2024 07:00 PM UTC
WY045601 Clinton Rose Facade Upgrade
The facade of Clinton Rose Senior Center, located at 3045 N Martin Luther King Jr Dr, Milwaukee, WI 53212, needs repair. This includes vertical cracking, deteriorated sealant, damaged brick, step cracking around brick veneer, and damaged mortar at louvre windowsills. DEADLINES 03/19/24 – 11:00 AM Non-Mandatory On-site Pre-Bid Meeting 03/22/24 – Final Questions Due 03/29/24 – Final Addendum 04/05/24 – Prime Contractor Prequalification Statement 04/12/24 – Bids Due 12:00 PM
04/12/2024 05:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 32C Exterior Improvements (Curb & Gutter)
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 32B Landscaping
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 32A Asphalt Paving
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 31A Sitework
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 26A Electrical / AV / Communications / Security
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 23A HVAC
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 22A Plumbing / Site Utilities
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock. Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm. Enter through the Zoofari Contractor Entrance. Meet in the Flamingo Room located in the Administration Building. DEADLINES: RFIs Due: March 14th, send to jstenz@gilbaneco.com RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com Milwaukee County Contractor Pre-Qualification: Before March 22nd Final Addendum: April 2nd After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
04/05/2024 06:00 PM UTC
41 - 50 of 255 Solicitations
1 2 3 5 7 8 9 25 26