General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
07/14/2026 07:45 PM UTC
Capital Project Number 3544
City of Lake Charles Hodges Street Waterline Extension Capital Project Number 3544 I. Background: Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system. II. Project Scope of Work: Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street. Design Services shall be as per the City of Lake Charles A&E Manual.
08/04/2026 07:45 PM UTC
Capital Project No. CP2894
City of Lake Charles, Louisiana WWTP A McNabb and Cline Street Emergency Sewer System Rehabilitation Capital Project No. CP2894 I. Background: Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system. II. Project Scope of Work: Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following: • Replacement of the existing 18-inch gravity sewer main via pipe bursting installation. • Reinstating of existing sanitary sewer service laterals to the rehabilitated main. • Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
08/04/2026 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. 2011-603, Capital Project No. 2894
Project No. 2011-603, Capital Project No. 2894 Sale Road Lift Station Diversion, City of Lake Charles, LA
04/22/2013 07:45 PM UTC
Project No. CP9778, CDBG #10 PARA 3205
Lake Charles Civic Center, Rosa Hart Theatre Improvements - Part 2 (RE-BID)
04/16/2013 07:45 PM UTC
CP3156
City of Lake Charles, Louisiana Generators for Wastewater Department CDBG-DR
04/16/2013 07:45 PM UTC
Project No. 2013-616, CP No. 3092
Project No. 2013-616, Capital Project No. 3092, Sale Road Turn Lane at Lake Street, City of Lake Charles, LA
04/16/2013 07:45 PM UTC
CP3156
City of Lake Charles, Louisiana Generators for Wastewater Department CDBG-DR
04/02/2013 07:45 PM UTC
Project No. 2012-611, CP No. 3137
Project No. 2012-611 Capital Project No. 3137 Asphalt Paving and Drainage Mignonette Lane from Nelson Road to Alma Lane City of Lake Charles, LA
03/05/2013 08:45 PM UTC
Project No. CP9778
Lake Charles Civic Center, Rosa Hart Theatre Improvements-Part 2, City of Lake Charles, LA
02/05/2013 08:45 PM UTC
Project No. 2011-604A, CP No. 3117
Project No. 2011-604A, Capital Project No. 3117 Water Line Replacement Holmes Street and Colletta Street from LA Hwy. 14 to Cline Street, City of Lake Charles, LA
02/05/2013 08:45 PM UTC
Project No. 2012-607, CP No. 2894
Sewer Pipe Bursting on Various Streets, City of Lake Charles, LA
01/15/2013 08:45 PM UTC
Project No. 2012-612, CP No. 3159
Project No. 2012-612, CP No. 3159 30” Sewer Main CIPP Lining-Franklin Street from Church Street to Pryce Street; Pryce Street from Franklin Street to 1st Avenue; 1st Avenue from Pryce Street South Approx. 80 feet, City of Lake Charles, LA
12/18/2012 08:45 PM UTC
391 - 400 of 402 Solicitations
1 2 33 34 35 36 37 38 40