General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Capital Project No. CP3051
City of Lake Charles, Louisiana 2025 Citywide Striping Package Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3051 LEI Project No. 26-006 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. Southpark Road (McNeese Street to Smith Road) 2. 6th Avenue (12th Street to Broad Street) 3. Hodges Street (Alamo Street to Belden Street) 4. Bilbo Street (S. Railroad Avenue to Clarence Street) 5. Lake Street (Shell Beach Drive to Prien Lake Road) 6. Opelousas Street (Enterprise Boulevard to Highway 171) 7. Fitzenreiter Road (Riverside Park to Highway 171) 8. North Goos Boulevard (Knapp Street to Opelousas Street) 9. Medora Street (Simmons Street to Highway 171) 10. Shattuck Street (Broad Street to Moeling Street) 11. 18th Street (Lake Street to Ryan Street) 12. Enterprise Parkway (Interstate 10 to Katherine Street) 13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road) 14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road) 15. Enterprise Boulevard (12th Street to Prien Lake Road) 16. Broad Street (Lakeshore Drive to Enterprise Boulevard) 17. Moeling Street (Enterprise Boulevard to Highway 171) 18. 6th Street (4th Avenue to Highway 14) 19. Mill Street (Lakeshore Drive to Highway 14) 20. Common Street (McNeese Street to Prien Lake Road) 21. Lake Street (Prien Lake Road to McNeese Street) 22. Kirkman Street (Jackson Street to McNeese Street) 23. Alamo Street (Ryan Street to Enterprise Boulevard) 24. Oak Park Boulevard (Enterprise Boulevard to Highway 14) 25. 12th Street (Highway 14 to Hodges Street) 26. Sallier Street (Lake Street to Hodges Street) 27. Ernest Street (Sale Road to Sallier Street) 28. Jefferson Drive (University Drive to University Drive) 29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road) 30. General Doolittle Avenue (Highway 14 to General Twining Street) 31. Alvin Street (Sallier Street to Shell Beach Drive) 32. 18th Street (Enterprise Boulevard to Highway 14) 33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive) 34. Russell Street (12th Street to Hillcrest Drive) 35. Hillcrest Drive (Highway 14 to Russell Street) 36. N. Prater Street (Knapp Street to Fitzenreiter Road) 37. Pear Street (Knapp Street to Fitzenreiter Road) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/17/2026 08:45 PM UTC
2027-04
Maintenance of City of Lake Charles Customer-Owned Lighting
11/17/2026 08:45 PM UTC
Capital Project Number CP3453
CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3453 HMGP PROJECT NUMBER DR-4559-0043 I. Scope of Services: Contractor shall complete Work as specified and indicated in the Contract Documents for Lift Station Back-Up Power Improvements (Capital Project No. CP3453). This Work includes, but is not limited to, the following: • Install of Automatic Transfer Switches & Stand-By Diesel Generators at Lift Stations. • Miscellaneous Work including civil, mechanical, structural, & electrical components required to fully execute the Work.
11/17/2026 08:45 PM UTC
Capital Project No. 3508
City of Lake Charles, Louisiana Project No. 2024-745 Capital Project No. 3508 Riverside Park Shoreline Protection – Phase One The general scope of work for this project includes the restoration and protection of approximately 250 linear feet of shoreline near the entrance of Riverside Park. This restorative work includes placement of stone revetment to rebuild the riverbank, repair/replacement of existing decorative black fence compromised from erosion, and installation of approximately 100 linear feet of steel sheet pile for bank protection near the gate entrance.
11/17/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
RCIP Project No. 10LDRC7711 - CP3520
Wastewater Treatment Plant A Basin A-02 Sewer Rehabilitation Funding by CDBG-DR (SAM.gov Assistance Listing 14.228) Resilient Communities Infrastructure Program (RCIP) RCIP Project No. 10LDRC7711 – CP3520 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. There is approximately 22,000 LF of 6-inch through 15-inch gravity sewer pipeline to be rehabilitated (Critical and Priority 1) as part of this project. Rehabilitation methods include point repairs, pipe bursting, and manhole lining.
05/05/2026 07:45 PM UTC
Capital Project No. CP3503 LEI Project No. 25-016
City of Lake Charles, Louisiana 2025 Asphalt Overlays Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3503 LEI Project No. 25-016 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. This project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, milling asphaltic concrete pavement, in-place cement stabilized base course, asphalt concrete wearing course, asphalt concrete ramps at paved driveways, aggregate surface course on aggregate driveways and hydro-seeding (if required) for the following streets at various locations in the City of Lake Charles: 1. North Grace Street (Opelousas Street to South to Dead End) 2. North Grace Street (Opelousas Street to North to Dead End) 3. Cessford Street (North Grace Street to East to Dead End) 4. Byrne Street (North Grace Street to East to Dead End) 5. Bayou Road (Sale Road to Orchard Street) 6. North Railroad Avenue (1st Avenue to Bilbo Street) 7. Pithon Street (Clarence Street to South to Dead End)
05/05/2026 07:45 PM UTC
2026-17
Request for Qualifications for Architectural & Engineering Design of Resilient Indoor Multi-Sports & Recreation Complex
04/14/2026 07:45 PM UTC
CP3538
City of Lake Charles, Louisiana Buddy Prejean Park Lighting CP3538 The overall project will include new field to the existing softball field. The field will be designed for NHSA regulation foot candles. Other miscellaneous components to be provided as per the bid drawings and manual.
04/14/2026 07:45 PM UTC
Capital Project Number CP3242
CITY OF LAKE CHARLES, LOUISIANA SOUTHERN SEWER LOOP GULF HIGHWAY LIFT STATION FORCEMAIN & GRAVITY EXTENSION CITY OF LAKE CHARLES CAPITAL PROJECT NUMBER CP3242 I. Background: Waggoner Engineering, Inc. (Engineer) was retained by the City of Lake Charles to evaluate a solution to a significant bottleneck occurring at the Sarver Lift Station, which serves as the main anchor station to WWTP ‘D’. Through the evaluation, the station was found to be grossly undersized to accommodate peak weather conditions, much less, expansive growth in its collection area. Due to significant costs and physical constraints associated with expanding the Sarver Lift Station and its collection system, an alternate solution was proposed to redirect flows from the Sarver Lift Station’s service area into an independent transmission system, that would deposit flow downstream of the Sarver Lift Station. The system would serve not only to divert flow from the service area of the Sarver Lift Station, but also, provide adequate capacity to collect flows from presently unserved areas. The full extent of the transmission system will be constructed in phases to expedite completion and reduce capital expenditures of initial construction. Incoming flow will trigger progression into the successive phases of the proposed improvements. Therefore, completion of the transmission system will be controlled by its necessity (i.e. increase in flow either through growth or extension of collection infrastructure). II. Project Scope of Work: Design of approximately 13,500 linear feet of 30/36-inch sewer forcemain from the Gulf Highway Lift Station (Contract ‘B’) to Nelson Road. Project shall conclude at the junction point with Segment 1 and Segment 2 (both by Others) of Phase I of this Project. Design services shall be as per the City of Lake Charles A&E Manual.
03/31/2026 07:45 PM UTC
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749 CAPITAL PROJECT NO. 3309 HAM REID ROAD WATERLINE EXTENSION- ELLIOTT RD. TO BIG LAKE RD. CITY OF LAKE CHARLES, LA SCOPE OF WORK: The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
03/17/2026 07:45 PM UTC
DR002
City of Lake Charles, Louisiana Lake Charles Public Works New Facility Phase 2 DR002 Scope of Project Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
03/03/2026 08:45 PM UTC
LCR 401
City of Lake Charles, Louisiana Lock Park Inclusive Playground LCR 401 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to: PROJECT SUMMARY: • The scope of work that is considered base bid includes: o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking; o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees; o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system. • The scope of work that is considered alternates includes: o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle. o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
03/03/2026 08:45 PM UTC
2026-12
Millennium Park Fall Surface Replacement In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center. All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
03/03/2026 08:45 PM UTC
LR0002
City of Lake Charles, Louisiana Sallier Street Reconstruction LR0002 M.A. Project No. B6-17080-DA SCOPE OF WORK: The project scope of work for Sallier Street Reconstruction consists of the following brief summary: • Base Bid - Riverside Drive to Lake Street o Rehabilitation of an existing two-lane concrete roadway with a three-lane concrete roadway. The expansion of the roadway section is in response to LADOTD's extension of Nelson Road Extension and Bridge (Contraband Bayou Bridge), the large quantity of undeveloped property along Sallier Street and the volume of existing and projected traffic detailed under numerous traffic studies. The project scope will address major improvements in drainage, sanitary sewer and water services due to their required relocation. The Port of Lake Charles under a separate contract relocated the existing rail to the north side of Sallier Street in support of the LADOTD Nelson Road Extension and Bridge with ends at Riverside Drive. • Alternate No. 1 - Riverside Cul-De-Sac o The construction of a cul-de-sac at the southern end of Riverside Drive which was required to be dead ended as a result of the LADOTD Nelson Road Extension and Bridge (Contraband Bayou Bridge) project. • Alternate No. 2 - Riverside Drive and Lake Street Drainage Improvements o The installation of drainage improvements along Riverside Drive and Lake Street is a result of supporting the drainage infrastructure under the Sallier Street Base Bid scope of work. Riverside Drive drainage infrastructure serves as the drainage outfall for the western Sallier Street subsurface drainage infrastructure. The widening and resulting drainage improvements along Lake Street are a result of the Lake/Sallier interchange improvements to facilitate projected traffic counts through the interchange. • Alternate No. 3 - Walnut Grove Improvements o The rehabilitation of Depot Alley includes construction of a new interchange with Sallier Street and parking improvements within the Depot Alley right of way between W. Walnut Street and Jabez Drive.
02/03/2026 08:45 PM UTC
11 - 20 of 408 Solicitations
2 4 5 6 7 8 9 … 40 41