General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
07/14/2026 07:45 PM UTC
Capital Project Number 3544
City of Lake Charles Hodges Street Waterline Extension Capital Project Number 3544 I. Background: Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system. II. Project Scope of Work: Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street. Design Services shall be as per the City of Lake Charles A&E Manual.
08/04/2026 07:45 PM UTC
Capital Project No. CP2894
City of Lake Charles, Louisiana WWTP A McNabb and Cline Street Emergency Sewer System Rehabilitation Capital Project No. CP2894 I. Background: Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system. II. Project Scope of Work: Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following: • Replacement of the existing 18-inch gravity sewer main via pipe bursting installation. • Reinstating of existing sanitary sewer service laterals to the rehabilitated main. • Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
08/04/2026 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Capital Project No. CP3089
Capital Project No. CP3089 New Transit Bus Wash City of Lake Charles, LA ~ The project is to provide a 2,270 square foot facility to house a new automated bus wash system. The building will be a metal building with concrete block infill. The project will be complete with concrete drives, a guard shack and controlled automated access. The facility will be located on a fenced, city owned property on Goodman Road.
03/03/2014 08:45 PM UTC
Capital Project No. CP3165, LEI Project No. 13-008
CITY OF LAKE CHARLES 2013 ASPHALT OVERLAY OF VARIOUS STREETS CITY OF LAKE CHARLES CAPITAL PROJECT NO. CP3165 LEI PROJECT NO. 13-008 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement widening, pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles: 1. See Street (North Booker Street to Sallie Mae Street) 2. Poplar Street (North Booker Street to Sallie Mae Street) 3. Katherine Street (North Booker Street to North Lincoln Street) 4. Beam Street (Mill Street to Dead End) 5. 3rd Street (Highway 14 to McNabb Street) 6. 7th Avenue (2nd Street to Dead End) 7. Shellbeach Drive (Lake Street to Bridge West of Wilson Street) 8. West Walton Street (Illinois Street to South Walton Street) 9. Briarfield Street (Illinois Street to Dead End) 10. South Walton Street (West Walton Street to East Walton Street) 11. East Walton Street (Illinois Street to South Walton Street) 12. Fourden Lane (Illinois Street to South Walton Street) 13. Brentwood Street (Illinois Street to Dead End) 14. Greenfield Circle (Full Length) 15. West Autumnwood Lane (Full Length) 16. Autumnwood Lane (West Autumnwood Lane to McNeese Street) 17. Springwood Lane (Autumnwood Lane to Dead End) 18. Stillwood Lane (Springwood Lane to McNeese Street) 19. Christina Drive (McNeese Street to Dead End) 20. Happy Lane (Riverside Drive to Dead End)
02/18/2014 08:45 PM UTC
Project No. 2013-624, Capital Project No. 3183
Project No. 2013-624 Capital Project No. CP3183 Water Line Extension-Burton Lane from Prien Lake Road to Francis Drive and Francis Drive from Burton Lane East to Dead End City of Lake Charles, LA ~ The general scope of work is the installation of a 12 inch HDPE water line by directional drill along the West side of Burton Lane from West Prien Lake Road, South to Francis Drive, and an 8 inch HDPE water line by directional drill along the South side of Francis Drive, East approximately 860 feet.
01/14/2014 08:45 PM UTC
Project No. 2013-620, Captial Project No. 3159
Project No. 2013-620 Capital Project No. 3159 CIPP Lining of 30” Sewer Main Under I-10 From Intersection of Belden and Franklin To Intersection of Church and Franklin City of Lake Charles, Louisiana ~ The general scope of work includes CIPP lining of 30” sewer main under I-10 from intersection of Belden and Franklin to the intersection of Church and Franklin, and includes the installation of a cured-in-place pipe (CIPP) lining system, manhole installation, including protective liners, and removal and replacement of reinforced concrete street pavement.
11/19/2013 08:45 PM UTC
MA Project No. A9-13002-DA
MA Project No. A9-13002-DA Graymarket Drive Sanitary Sewer Extension City of Lake Charles, LA ~ The project scope includes the new construction of 1,700 LF of 8” and 10” diameter gravity sanitary sewer main. The proposed main includes but is not limited to 11 sanitary sewer manholes, 200 LF of jacking and boring and 14 sanitary sewer service assemblies.
11/05/2013 08:45 PM UTC
Project No. 2013-618, Capital Project No. 3151
Project No. 2013-618 (CP #3151) Drainage and Asphalt Overlay Improvements Vito Street - Prater to Albert Street Carr Street – Vito to Evans Street Prater Street – Vito to Evans Street City of Lake Charles, LA ~ The general scope of work for Project No. 2013-618 includes: • Improvements to roadside ditches, • Patches of full depth asphalt repair; • and overlay of the existing asphalt surface
11/05/2013 08:45 PM UTC
Project No. 3128, LDEQ SRF Project No. CS221215-01
Project No. CP3128 LDEQ SRF Project No. CS221215-01 Plant B/C Pump Station City of Lake Charles, LA ~ The scope of work for the project is the construction of a new Plant B/C Pump Station for pumping of raw sewage which shall consist of, but is not limited to: • Site Excavation and Borrow Structural Fills • Construction of Reinforced Concrete Pump Station Wetwell • Furnish and Install Gravity Sewers and Manholes • Furnish and Install Sewer Force Mains • Furnish and Install Mechanical Bar Screen System with Screenings Washer Conveyor rated for • Furnish and Installation of two (2) – 100 Hp Vertical Turbine Solids Handling Pumps each rated for 3,500 GPM • Furnish and Installation of four (4) 300 Hp Vertical Turbines Solids Handling Pumps each rated for 7,000 GPM • Furnish and Install Mechanical Piping and Valve Systems • Furnish and Install Electrical Lighting, MCC Switchgear, Process Equipment Controls, and Pump Control Systems • Furnish and Install Painting and Protective Coatings Systems • Installation of Site Drainage, Driveways, Paving, and Turfing
10/15/2013 07:45 PM UTC
Project No. 2013-617, Capital Project No. 2894
Project No. 2013-617 Capital Project No. 2894 Sewer Line Pipe Bursting and Manhole Installation at Various Locations (8th Street, Oklahoma Street, 12th Street, Hinton Drive and Windsor Street) City of Lake Charles, LA SCOPE OF WORK: The general scope of work includes pipe bursting the existing 8” or 12” sewer lines and reconnecting the existing sewer services, and installation of new precast concrete manholes, and installation of protective manhole interior liners. The project sites for the sewer repairs are as follows: - From 2nd Avenue to 4th Avenue between 7th Street and 8th Street - From Louisiana Avenue to Maine Street between Virginia Street and Oklahoma Street - From Bank Street to 1st Avenue between 11th Street and 12th Street - Between Hinton Drive and Legion Street - From Jefferson Drive to Dolby Street between Lee Street and Windsor Street
10/15/2013 07:45 PM UTC
CP No. CP3051, LEI Project No. 13-007
Capital Project No. CP3051 LEI Project No. 13-007 2013 City Wide Striping Project City of Lake Charles, LA ~ The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles. The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
09/17/2013 07:45 PM UTC
Project No. CP3152
Project No. CP3152, Lake Charles CDBG 2013 Sidewalk Improvements, City of Lake Charles, LA
08/20/2013 07:45 PM UTC
371 - 380 of 402 Solicitations
1 2 33 34 35 36 38 40 41