Capital Project No. CP3051
City of Lake Charles, Louisiana
2025 Citywide Striping Package
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 26-006
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Southpark Road (McNeese Street to Smith Road)
2. 6th Avenue (12th Street to Broad Street)
3. Hodges Street (Alamo Street to Belden Street)
4. Bilbo Street (S. Railroad Avenue to Clarence Street)
5. Lake Street (Shell Beach Drive to Prien Lake Road)
6. Opelousas Street (Enterprise Boulevard to Highway 171)
7. Fitzenreiter Road (Riverside Park to Highway 171)
8. North Goos Boulevard (Knapp Street to Opelousas Street)
9. Medora Street (Simmons Street to Highway 171)
10. Shattuck Street (Broad Street to Moeling Street)
11. 18th Street (Lake Street to Ryan Street)
12. Enterprise Parkway (Interstate 10 to Katherine Street)
13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road)
14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road)
15. Enterprise Boulevard (12th Street to Prien Lake Road)
16. Broad Street (Lakeshore Drive to Enterprise Boulevard)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. 6th Street (4th Avenue to Highway 14)
19. Mill Street (Lakeshore Drive to Highway 14)
20. Common Street (McNeese Street to Prien Lake Road)
21. Lake Street (Prien Lake Road to McNeese Street)
22. Kirkman Street (Jackson Street to McNeese Street)
23. Alamo Street (Ryan Street to Enterprise Boulevard)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. 12th Street (Highway 14 to Hodges Street)
26. Sallier Street (Lake Street to Hodges Street)
27. Ernest Street (Sale Road to Sallier Street)
28. Jefferson Drive (University Drive to University Drive)
29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road)
30. General Doolittle Avenue (Highway 14 to General Twining Street)
31. Alvin Street (Sallier Street to Shell Beach Drive)
32. 18th Street (Enterprise Boulevard to Highway 14)
33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive)
34. Russell Street (12th Street to Hillcrest Drive)
35. Hillcrest Drive (Highway 14 to Russell Street)
36. N. Prater Street (Knapp Street to Fitzenreiter Road)
37. Pear Street (Knapp Street to Fitzenreiter Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 11/17/2026 08:45 PM UTC |
|
2027-04
Maintenance of City of Lake Charles Customer-Owned Lighting
| 11/17/2026 08:45 PM UTC |
|
Capital Project Number CP3453
CITY OF LAKE CHARLES, LOUISIANA
HAZARD MITIGATION GRANT PROGRAM (HMGP)
LIFT STATION BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3453
HMGP PROJECT NUMBER DR-4559-0043
I. Scope of Services:
Contractor shall complete Work as specified and indicated in the Contract Documents for Lift Station Back-Up Power Improvements (Capital Project No. CP3453). This Work includes, but is not limited to, the following:
• Install of Automatic Transfer Switches & Stand-By Diesel Generators at Lift Stations.
• Miscellaneous Work including civil, mechanical, structural, & electrical components required to fully execute the Work.
| 11/17/2026 08:45 PM UTC |
|
Capital Project No. 3508
City of Lake Charles, Louisiana
Project No. 2024-745
Capital Project No. 3508
Riverside Park Shoreline
Protection – Phase One
The general scope of work for this project includes the restoration and protection of approximately 250 linear feet of shoreline near the entrance of Riverside Park. This restorative work includes placement of stone revetment to rebuild the riverbank, repair/replacement of existing decorative black fence compromised from erosion, and installation of approximately 100 linear feet of steel sheet pile for bank protection near the gate entrance.
| 11/17/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. CP3147
Capital Project No. CP3147
LCPD Annex Renovations
City of Lake Charles, LA ~
Upgrade and improve the existing building through renovations. The renovations will include major renovations to the Men and Women’s restrooms (4 total); renovations to the existing breakroom; revise the entry lobby area; and upgrade the open office area with solid wall offices.
| 05/20/2014 07:45 PM UTC |
|
Project No. CP3152
Capital Project No. CP3152
Lake Charles CDBG FY-2013 Sidewalk Improvements
City of Lake Charles, LA ~
I. Scope of Work:
• The City of Lake Charles desires to provide new sidewalks or repair existing sidewalks in the following locations as funds permit:
i. North Blake Steet, West Side (Moeling St.-Existing Sidewalk to Commercial St.)
ii. Commercial Street, North Side (North Shattuck St. to North Prater St.)
iii. Katherine Street, North Side (North Prater St. to Jr. Street)
iv. Martha Street, South Side (N. Shattuck to N. Prater Street)
v. Martha Street, North Side (N. Shattuck to N. Prater Street)
vi. Medora Street, North Side (Graham Street to MLK Hwy)
vii. Fournet Street, North Side ( N. 1st Avenue to N. Lyons Street)
| 05/06/2014 07:45 PM UTC |
|
Project No. CP3167
Capital Project No. CP3167
Lift Station Improvements OCD-DRU
City of Lake Charles, LA ~
I. Scope of Services:
Due to flooding from previous storm events, the City of Lake Charles evaluated several lift stations that were unable to properly pump the collected wastewater flows into the stations. The existing mechanical and electrical design configurations of these lift stations were the limiting factor of proper operation during the flooding. Proposed mechanical improvements include installation of new dry-pit submersible pumps that would enable the pumping of wastewater during flood events. Proposed electrical improvements include elevating the lift station’s control panels and switchgear above the 100-year base flood elevation.
A. Mechanical Evaluation – Mechanical improvements include installation of new dry-pit submersible pumps and the replacement of all suction and discharge valves and header piping to enable the pumping of wastewater during flood events at the following pump stations:
1. 7th Avenue
2. Colletta
3. Cline
4. Goos
5. Holly Hill
6. St. John
7. Creole
B. Electrical Evaluation – Electrical improvements include elevating the control panel(s)and switchgear above flood levels at the following pump stations:
1. Colletta
2. Goos
3. Holly Hill
4. Creole
| 05/06/2014 07:45 PM UTC |
|
Capital Project No. CP3176, LEI Project No. 13-023
Capital Project No. CP3176
LEI Project No. 13-023
East McNeese Utility Extension
City of Lake Charles, LA ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
This project generally consists of extending the existing 16″ PVC water line and 24″ PVC gravity waste water line on East McNeese Street to the east approximately 2,143 linear feet and 1,836 linear feet respectively.
The project will include the following items of work:
1. Clearing and grubbing;
2. Construction of a new water line and gravity waste water lines and appurtenances;
3. Removal and construction of permanent fencing;
4. Site grading and hydroseeding;
5. Pressure and leak testing of new waste water facilities and water lines and disinfection and Health Department water testing of the new water line.
| 05/06/2014 07:45 PM UTC |
|
Capital Project No. CP3124
Capital Project No. CP3124
Central School Arts & Humanities 3rd Floor Flooring
City of Lake Charles, LA ~
• Installation of plywood sub floor, wood finish floor and shoe mouldings on the third floor as well as replacement of stair treads and nosing at stairs indicated on plan.
• Trimming all doors as required.
• Installing carpet at entrance of theater Balcony.
• Replacing seats and backs on existing Theater chairs where indicated. Removing existing Theater chairs and installing new Theater chairs where indicated.
| 03/18/2014 07:45 PM UTC |
|
Project No. 2013-622, CP No. 2894
Project No. 2013-622, Capital Project No. 2894
PIPE BURSTING – 9TH STREET FROM 2ND AVENUE TO 4TH AVENUE; 5TH STREET FROM 2ND AVENUE TO 3RD AVENUE;
VARNEY CIRCLE FROM I-210 EAST TO BUNKER ROAD;
AND ILLINOIS STREET FROM LOUISIANA AVENUE, EAST
CITY OF LAKE CHARLES, LOUISIANA
SCOPE OF WORK
The general scope of work for Project No. 2013-622 includes pipe bursting the existing 8” or 15” sewer lines and reconnecting the existing sewer services, installation of new precast concrete manholes, and installation of protective manhole interior liners. The sewer main North of Varney Circle shall be up-sized to 16 inches.
| 03/18/2014 07:45 PM UTC |
|
Capital Project No. CP3089
Capital Project No. CP3089
New Transit Bus Wash
City of Lake Charles, LA ~
The project is to provide a 2,270 square foot facility to house a new automated bus wash system. The building will be a metal building with concrete block infill. The project will be complete with concrete drives, a guard shack and controlled automated access. The facility will be located on a fenced, city owned property on Goodman Road.
| 03/03/2014 08:45 PM UTC |
|
Capital Project No. CP3165, LEI Project No. 13-008
CITY OF LAKE CHARLES
2013 ASPHALT OVERLAY OF VARIOUS STREETS
CITY OF LAKE CHARLES CAPITAL PROJECT NO. CP3165
LEI PROJECT NO. 13-008
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of pavement widening, pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles:
1. See Street (North Booker Street to Sallie Mae Street)
2. Poplar Street (North Booker Street to Sallie Mae Street)
3. Katherine Street (North Booker Street to North Lincoln Street)
4. Beam Street (Mill Street to Dead End)
5. 3rd Street (Highway 14 to McNabb Street)
6. 7th Avenue (2nd Street to Dead End)
7. Shellbeach Drive (Lake Street to Bridge West of Wilson Street)
8. West Walton Street (Illinois Street to South Walton Street)
9. Briarfield Street (Illinois Street to Dead End)
10. South Walton Street (West Walton Street to East Walton Street)
11. East Walton Street (Illinois Street to South Walton Street)
12. Fourden Lane (Illinois Street to South Walton Street)
13. Brentwood Street (Illinois Street to Dead End)
14. Greenfield Circle (Full Length)
15. West Autumnwood Lane (Full Length)
16. Autumnwood Lane (West Autumnwood Lane to McNeese Street)
17. Springwood Lane (Autumnwood Lane to Dead End)
18. Stillwood Lane (Springwood Lane to McNeese Street)
19. Christina Drive (McNeese Street to Dead End)
20. Happy Lane (Riverside Drive to Dead End)
| 02/18/2014 08:45 PM UTC |
|
Project No. 2013-624, Capital Project No. 3183
Project No. 2013-624
Capital Project No. CP3183
Water Line Extension-Burton Lane from Prien Lake Road to Francis Drive and Francis Drive from Burton Lane East to Dead End
City of Lake Charles, LA ~
The general scope of work is the installation of a 12 inch HDPE water line by directional drill along the West side of Burton Lane from West Prien Lake Road, South to Francis Drive, and an 8 inch HDPE water line by directional drill along the South side of Francis Drive, East approximately 860 feet.
| 01/14/2014 08:45 PM UTC |
|
Project No. 2013-620, Captial Project No. 3159
Project No. 2013-620
Capital Project No. 3159
CIPP Lining of 30” Sewer Main Under I-10
From Intersection of Belden and Franklin
To Intersection of Church and Franklin
City of Lake Charles, Louisiana ~
The general scope of work includes CIPP lining of 30” sewer main under I-10 from intersection of Belden and Franklin to the intersection of Church and Franklin, and includes the installation of a cured-in-place pipe (CIPP) lining system, manhole installation, including protective liners, and removal and replacement of reinforced concrete street pavement.
| 11/19/2013 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.