General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
07/14/2026 07:45 PM UTC
Capital Project Number 3544
City of Lake Charles Hodges Street Waterline Extension Capital Project Number 3544 I. Background: Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system. II. Project Scope of Work: Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street. Design Services shall be as per the City of Lake Charles A&E Manual.
08/04/2026 07:45 PM UTC
Capital Project No. CP2894
City of Lake Charles, Louisiana WWTP A McNabb and Cline Street Emergency Sewer System Rehabilitation Capital Project No. CP2894 I. Background: Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system. II. Project Scope of Work: Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following: • Replacement of the existing 18-inch gravity sewer main via pipe bursting installation. • Reinstating of existing sanitary sewer service laterals to the rehabilitated main. • Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
08/04/2026 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. 2014-633, Capital Project No. CP3040, State Project No. H.010868
STATE PROJECT NO. H.010868 PROJECT NO. 2014-633 CAPITAL PROJECT NO. 3040 1ST AVENUE MULTI-USE TRAIL PART ONE 12TH STREET TO 7TH STREET CITY OF LAKE CHARLES, LA SCOPE OF WORK The general scope of work for State Project No. H.010868, Project No. 2014-633, 1st Avenue Multi-Use Trail Part One, includes the installation of a new 8 foot wide asphalt trail and the associated concrete sidewalk connectivity enhancements on 1st Avenue from 12th Street North to 7th Street.
09/15/2015 07:45 PM UTC
Project No. CP3003
Capital Project No. 3003 Lake Charles Civic Center Perimeter Power Holiday Lighting Program Phase II City of Lake Charles, LA ~ Provide and installing new in-ground pullboxes with electrical distribution capability in the area in front of the Civic Center (West side of Lakeshore Drive from Civic Center Main Entrance due south to Gill Street) and on south side of Gill Street between Lakeshore Drive and Bord Du Lac. Work includes a new 277/480V Service at Gill Street and Lakeshore Drive with capacity to feed a 480V 3 Phase lift station in the future.
08/18/2015 07:45 PM UTC
Capital Project No. CP3210
Capital Project No. CP3210 Blake, Comeaux, Greinwich Village, and Griffin Coulee Lift Stations Rehabilitation City of Lake Charles, LA ~ I. Scope of Services: A. Blake Lift Station 1. Demolish existing building around station and replace with new hurricane fence with green slats around site. 2. Replace the two existing pumps with new submersible pumps on a rail system. 3. Replace all valves and valve vault lid. Expand valve vault to expose where the two pump discharge pipes combine into a single forcemain and install a permanent bypass connection. 4. Electrical improvements. 5. Coat wet well. B. Comeaux Lift Station 1. Install green slats in existing hurricane fence. 2. Replace the two existing pumps with new submersible pumps on a rail system. 3. Replace all valves. Expand valve vault to install a permanent bypass connection. 4. Electrical Improvements. 5. Coat wet well. C. Greinwich Village Lift Station 1. Demolish existing wooden fence and provide new hurricane fence with green slats. 2. Replace the two existing pumps with new submersible pumps on a rail system. 3. Improve top slab. Coat new wet well. 4. Improve discharge configuration. 5. Replace all valves and evaluate feasibility for permanent bypass connection. 6. Electrical Improvements. 7. Coat wet well. D. Griffin Coulee Lift Station 1. Replace existing double door and windows. 2. Install green slats on existing hurricane fence. 3. Replace existing pumps with new dry pit submersible pumps. 4. Replace all valves. 5. New wet well access hatch. 6. Provide steps with handrail on entry to station. 7. Electrical Improvements. 8. Coat wet well.
08/04/2015 07:45 PM UTC
Capital Project No. CP3219
Capital Project No. CP3219 George West Water Treatment Plant - Filter Media Replacement Project City of Lake Charles, LA ~ I. Scope of Work: a. George West Water Treatment Plant Filter Media Replacement i. Replacement of Filter Media in Filters No. 1 – 6 ii. Estimated total volume needed: 3,400 ft3 iii. Work includes, placement, disinfection, conditioning, and start up
08/04/2015 07:45 PM UTC
Project No. 2014-643, Capital Project No. 3217
Project No. 2014-643 Capital Project No. 3217 Water and Sewer Extension on Weaver Road North of Ham Reid Road City of Lake Charles, LA ~ The general scope of work is the installation of a 12 inch water line from Ham Reid Road North to the Ridge at Lake Charles Apartment Complex, and installation of a 12 inch sewer line from the lift station North of Ham Reid, North approximately 1460 feet.
07/14/2015 07:45 PM UTC
Capital Project No. CP3051
Capital Project No. CP3051 LEI Project No. 15-005 2014-2015 City Wide Striping Project City of Lake Charles, LA ~ The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. 12th Street (Hodges Street to 110 ft. East of Highway 14) 2. Common Street (Sale Road to Kirby Street) 3. North Ryan Street (Belden Street to 300 ft. West on River Road) 4. Dr. Michael DeBakey Drive (Ryan Street to Lake Street) 5. Lake Street (College Street to Sale Road) 6. Rail Road Symbols (Various Locations) 7. Alamo Street (Enterprise Boulevard to Ryan Street) 8. Bilbo Street (Kirby Street to Clarence Street) 9. Clarence Street (Lakeshore Drive to Kirkman Street)10. Derek Drive (Highway 14 to East Prien Lake Road) 11. East Prien Lake Road (Carver Road to East side of Highway 14) 12. Goos Street (Broad Street to Winterhalter Street) 13. Street removed from project 14. Kirkman Street (McNeese Street to Opelousas Street) 15. Sallier Street (Riverside Drive to Hodges Street) 16. Medora Street (Cathy Street to Highway 171) 17. Moeling Street (Enterprise Boulevard to Highway 171) 18. Opelousas Street (Enterprise Boulevard to Highway 171) 19. Alvin Street (Sallier Street to Shell Beach Drive) 20. Ernest Street (Sale Road to Sallier Street) 21. Lake Street (Sallier Street to Shell Beach Drive) 22. Merganser Street (J. Bennett Johnston Avenue to Mallard Cove Street) 23. Dillard Loop (Highway 14 to Derek Drive) 24. Oak Park Boulevard (Enterprise Boulevard to Highway 14) 25. Pineview Street (Highway 171 to Cathy Street) 26. Cathy Street (Alice Street to Medora Street) 27. Mallard Cove Street (Merganser Street to Golf Course) 28. Chennault Parkway (Merganser Street to Dead End) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
06/30/2015 07:45 PM UTC
Project No. 2013-623, CP No. 3213
Project No. 2013-623 Capital Project No. 3213 Replacement of Approximately 300 Feet of 36” Sewer Line on Penn Street West of Creole Street City of Lake Charles, LA ~ The general scope of work for Project No. 2013-623 includes replacement of an existing 36 inch gravity sewer main with new 36 inch polypropylene pipe, water line adjustment, installation of manholes, fittings, and tying the new sewer main into the wet well at the existing Penn Street Sewer Lift Station.
06/16/2015 07:45 PM UTC
Capital Project No. CP3005
Capital Project No. CP3005 Lake Charles Downtown Fiber Network Phase 1 City of Lake Charles, LA ~ The purpose of this project is to build a fiber optic network among various municipal buildings in downtown Lake Charles. This project has four tasks: 1. Install underground conduit from Ryan Street to City Hall 2. Install underground conduit from Ryan Street to 1911 City Hall 3. Install underground conduit from City Hall to the 911 Building on Hodges Street 4. Install fiber optic cable from City Hall to several downtown buildings.
06/16/2015 07:45 PM UTC
CP3120 Contraband Lift Station Rehabilitation Project
Capital Project No. CP3120 Contraband Lift Station Rehabilitation Project City of Lake Charles, LA ~ The City of Lake Charles Wastewater Division owns and operates the Contraband Lift Station. Wastewater Division personnel have indicated that at a minimum the following items must be addressed as part of the rehabilitation project: 1. Remove existing pumps/motors and replace with dry pit submersible pumps, and upgrade electrical equipment as needed to accommodate new pumps 2. New pumps are to be equipped with variable frequency drives. Due to the size of these drives, a new slab on grade building will house the drives. This new electrical building will have a brick veneer and architectural shingle roof. 3. In addition to the new electrical building, addition site improvements include new P.C.C. pavement, green slatted hurricane fencing with brick columns, and improvements to the access road leading to the lift station site. 4. All suction and discharge valves are to be replaced with new. 5. Existing wet well is to be cleaned, repaired, and coated.
05/05/2015 07:45 PM UTC
Project No. 2015-644, Capital Project No. 2894
Project No. 2015-644 Capital Project No. 2894 Sale Road Lift Station Wet Well Wall Structural Rehabilitation City of Lake Charles, LA ~ Contractor shall provide all materials, all labor, supervision, tools, construction equipment, transportation, services, incidentals and temporary facilities, including electrical power, water, sanitary facilities, offices, and warehouses and other services necessary to construct, complete in place and accepted the new Wet Well Wall Structural Rehabilitation at the Sale Road Lift Station located at 715 W. Sale Road in the City of Lake Charles, Louisiana. All work shall be in accordance with the plans and specifications and/or engineer approved shop drawings. In general, the work includes, but is not limited to the following: a. Mobilization b. Temporary signs and barricades c. Construct and remove steel sheet pile retaining walls d. Excavation and disposal of spoils e. Construct new concrete seal slab f. Pressure wash the exterior wall surfaces and apply bonding adhesive to the existing wet well walls g. Construct new concrete exterior wall sections on one side at a time in three (3) lifts per wall. h. Furnish, place and compact sand backfill i. Construct aggregate backfill cap at top of fill j. Remove and replace new 4 foot chain link fence k. Final cleanup, including hydroseeding
03/17/2015 07:45 PM UTC
341 - 350 of 402 Solicitations
1 2 31 32 33 35 37 38 39 40 41