City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Capital Project No. CP3187
Capital Project No. CP3187
2014 Sidewalk Improvements
City of Lake Charles, LA ~
• The City of Lake Charles desires to provide new sidewalks or repair existing sidewalks in the following locations:
o Lake Street, West Side (Sallier St. to Suffolk Manor Apartment Homes)
o Lake Street, East Side (Busy Bee Gas Station to Baker Street)
o Power Center Parkway, South Side (Existing Sidewalk at Magnet School to Temporary Magnet School)
| 12/16/2014 08:45 PM UTC |
Project No. 2011-597, Bond Issue No. SW0011
Project No. 2011-597
Bond Issue No. SW0011
Small Bayou Sewer Force Main and Lift Station Installation
City of Lake Charles, LA ~
This work includes construction of a new lift station and force main, complete with all piping, electrical, pumps, valves, FM monitoring unit, ultrasonic level control, manholes, excavating, backfilling, etc. and any other items necessary to provide a complete system which functions properly to the satisfaction of the Engineer and Wastewater Department.
| 11/18/2014 08:45 PM UTC |
Project No. 2014-639, Capital Project No. 3191
Project No. 2014-639
Capital Project No. 3191
12th Street Pavement Repair
Between 8th and 9th Avenue
City of Lake Charles, LA ~
The general scope of work includes removal and replacement of approximately 175 linear feet of existing roadway pavement, base, and subgrade material on 12th Street between 8th and 9th Avenue. The existing subgrade soils are exhibiting swelling characteristics. The distressed pavement and poor subgrade material shall be removed and replaced with #610 stone base material and new concrete pavement. Roadway and impacted drives, walks, and drainage will be repaired.
| 11/04/2014 08:45 PM UTC |
Capital Project No. 3188
Project No. CP3188
Cline, Colletta, and Bank St. Lift Station Improvements
City of Lake Charles, Louisiana
~
Scope of Services:
• The City of Lake Charles Wastewater Division owns and operates the Cline, Colletta, and Bank Street Lift Stations. Wastewater Division personnel have indicated that at a minimum the following items must be addressed as part of the rehabilitation project:
1. Remove existing pumps and replace with new submersible pumps, remove existing electrical and controls and replace / relocate with new, remove existing piping and valves and replace with new, remove existing valve vault and wet well riser and replace with new – Bank Street Lift Station ONLY.
2. Clean, repair, and coat the wet wells, install hurricane fencing with green slats, and install permanent bypass connection – at EACH lift station.
| 10/14/2014 07:45 PM UTC |
Project No. 2014-641, Bond Issue No. SW0002
PROJECT NO. 2014-641
BOND ISSUE NO. SW0002
SEWER FORCE MAIN EXTENSION
HENDERSON BAYOU ROAD
FROM WEST PRIEN LAKE ROAD TO DEAD END OF HENDERSON BAYOU ROAD
(PHASE TWO – LOCKE LANE WEST TO DEAD END)
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work includes, but is not limited to, the following:
a. The directional drill installation of approximately 610 linear feet of new 1.5 inch diameter DR-9 HDPE low pressure sewer force main
b. The directional drill installation of approximately 446.linear feet of new 2 inch diameter DR-11 HDPE low pressure sewer force main
c. The directional drill installation of approximately 820 linear feet of new 3 inch diameter DR-7 HDPE low pressure sewer force main
d. The installation of 4 each 2 inch gate valve flush stations
e. The connection of the force main to an existing stub pipe at a manhole located at Locke Lane and Henderson Bayou Road
This project is for the installation of the low pressure sewer force main and appurtenances only. The connections and installation of lateral lines and grinder pump stations are the responsibility of the individual residents.
| 10/14/2014 07:45 PM UTC |
Project No. 2012-615, Capital Project No. 2899
Project No. 2012-615
Capital Project No. 2899
EDI Special Project No. B-09-SP-LA-0141 and B-08-SP-LA-0535
Utility Extension to Serve Tract One C and Tract One D
Lake Charles Civic Center
City of Lake Charles, LA ~~~~ The general scope of work for Project No. 2012-615, includes, but is not limited to, the following:
(a) The directional drill installation of approximately 811 linear feet
of new 12” diameter DR-11 HDPE water line with associated
appurtenances.
(b) The open cut installation of approximately 330 linear feet of
new 12” diameter DR-18 PVC water line with associated
appurtenances.
(c) The directional drill installation of approximately 436 linear feet
of new 12” diameter DR-11 HDPE sanitary sewer line.
(d) The open cut installation of approximately 170 linear feet of
new 8” diameter SDR-26 PVC sanitary sewer line.
(e) The installation of 5 new sanitary sewer manholes.
(f) The directional drill installation of approximately 5960 linear
feet of new 3” diameter DR-13.5 HDPE conduit to include pull
wire, capped ends, and tracer wire. Utility conduit are grouped
in sets of 4 or 8 conduits. Utility conduit installed under this
contract is for the future use by others under separate contract.
| 09/16/2014 07:45 PM UTC |
Project No. 2014-630, Capital Project No. 3186
Project No. 2014-630
Capital Project No. 3186 ~~~
Drainage Improvements
10th Street Between 8th & 9th Avenue
And 11th Street Between 6th & 7th Avenue
City Of Lake Charles, LA
The general scope of work for Project No. 2014-630 includes drainage improvements, concrete pavement repair and sidewalk repair.
| 09/16/2014 07:45 PM UTC |
Project No. 2014-637, Capital Project No. 2968
Project No. 2014-637
Capital Project No. CP2968
Louisiana Avenue Bridge Over Contraband Bayou Piling Repair
City of Lake Charles, LA ~
The general scope of work for Project No. 2014-637, Capital Project No. 2968, Louisiana Avenue Bridge Over Contraband Bayou Piling Repair, includes the following:
(a) Bridge piling repair;
(b) Spall repair on South approach slab;
(c) Sway bracing repair.
| 08/05/2014 07:45 PM UTC |
Project No. 2014-636, CP No. 3003
Project No. 2014-636
Capital Project No. 3003
Demolition of Old Harrah’s Hotel Site Parking Lot
And Building Foundation
City of Lake Charles, LA ~
The general scope of work is the demolition of the existing building foundation, pool, and concrete slabs. Also included is the placement of fill material to level the site.
Alternate Bid #1 includes those bid form items for the demolition of the concrete parking lot, light poles, and boardwalk sidewalks, along with required fill material to level the site.
| 07/15/2014 07:45 PM UTC |
Capital Project No. CP3089
Capital Project No. CP3089
New Transit Bus Wash
City of Lake Charles, LA ~
The project is to provide a 2,270 square foot facility to house a new automated bus wash system. The building will be a metal building with concrete block infill. The project will be complete with concrete drives and security fencing. The facility will be located on city owned property along Goodman Road.
| 06/17/2014 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.