City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
DR002
City of Lake Charles, Louisiana
Lake Charles Public Works New Facility Phase 2
DR002
Scope of Project
Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
| 02/16/2026 08:45 PM UTC |
|
LCR 401
City of Lake Charles, Louisiana
Lock Park Inclusive Playground
LCR 401
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to:
PROJECT SUMMARY:
• The scope of work that is considered base bid includes:
o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking;
o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees;
o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system.
• The scope of work that is considered alternates includes:
o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle.
o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
| 02/16/2026 08:45 PM UTC |
|
2026-12
Millennium Park Fall Surface Replacement
In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center.
All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
| 03/03/2026 08:45 PM UTC |
|
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749
CAPITAL PROJECT NO. 3309
HAM REID ROAD WATERLINE EXTENSION-
ELLIOTT RD. TO BIG LAKE RD.
CITY OF LAKE CHARLES, LA
SCOPE OF WORK:
The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
| 03/03/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
LR0002
City of Lake Charles, Louisiana
Sallier Street Reconstruction
LR0002
M.A. Project No. B6-17080-DA
SCOPE OF WORK:
The project scope of work for Sallier Street Reconstruction consists of the following brief summary:
• Base Bid - Riverside Drive to Lake Street
o Rehabilitation of an existing two-lane concrete roadway with a three-lane concrete roadway. The expansion of the roadway section is in response to LADOTD's extension of Nelson Road Extension and Bridge (Contraband Bayou Bridge), the large quantity of undeveloped property along Sallier Street and the volume of existing and projected traffic detailed under numerous traffic studies. The project scope will address major improvements in drainage, sanitary sewer and water services due to their required relocation. The Port of Lake Charles under a separate contract relocated the existing rail to the north side of Sallier Street in support of the LADOTD Nelson Road Extension and Bridge with ends at Riverside Drive.
• Alternate No. 1 - Riverside Cul-De-Sac
o The construction of a cul-de-sac at the southern end of Riverside Drive which was required to be dead ended as a result of the LADOTD Nelson Road Extension and Bridge (Contraband Bayou Bridge) project.
• Alternate No. 2 - Riverside Drive and Lake Street Drainage Improvements
o The installation of drainage improvements along Riverside Drive and Lake Street is a result of supporting the drainage infrastructure under the Sallier Street Base Bid scope of work. Riverside Drive drainage infrastructure serves as the drainage outfall for the western Sallier Street subsurface drainage infrastructure. The widening and resulting drainage improvements along Lake Street are a result of the Lake/Sallier interchange improvements to facilitate projected traffic counts through the interchange.
• Alternate No. 3 - Walnut Grove Improvements
o The rehabilitation of Depot Alley includes construction of a new interchange with Sallier Street and parking improvements within the Depot Alley right of way between W. Walnut Street and Jabez Drive.
| 02/03/2026 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
|
CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA
SOUTHWEST WATER TREATMENT PLANT
BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3414
HMGP GRANT NO. DR-4559-43
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following:
• Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear.
• Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch.
• Installation of Low Voltage Panelboard for Supply to Generator Appurtenances.
• Interconnections to Owner’s SCADA for Generator Monitoring.
• Miscellaneous Civil and Electrical Work as Required to Complete the Work.
| 12/02/2025 08:45 PM UTC |
|
RCIP Project No. 10LDRC7711 - CP3237
Wastewater Treatment Plant A
Basin A-06 Sewer Rehabilitation
Funding by CDBG-DR (SAM.gov Assistance Listing 14.228)
Resilient Communities Infrastructure Program (RCIP)
RCIP Project No. 10LDRC7711 – CP3237
I. Scope of Services:
The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
There is approximately 25,830 LF of 6-inch through 10-inch gravity sewer pipeline to be rehabilitated (Critical and Priority 1) as part of this project. Rehabilitation methods include point repairs, pipe bursting, and manhole lining.
| 12/02/2025 08:45 PM UTC |
|
CP 9778
City of Lake Charles, Louisiana
Lake Charles Event Center ADA Railing and Seating
CP 9778
Develop new handrails in the upper 300 section of the existing coliseum. The handrails will provide an added measure of safety to assist patrons going up and down the existing stairs to their seats. And to add accessible seating at the south end of the coliseum in sections 226 and 202.
| 12/02/2025 08:45 PM UTC |
|
CP 3257
City of Lake Charles, Louisiana
Sally Mae (Medora – Dead End) Phase II
CP 3257
The Sally Mae Street Drainage & Overlay project for the City of Lake Charles, Louisiana, involves improvements to Sally Mae Street that include grading, earthwork, installation of new and replacement drainage infrastructure, sub-surface drainage, and an asphaltic overlay of the roadway. The scope also covers driveway replacements, utility coordination, and erosion control measures to enhance stormwater management and roadway durability along the project corridor.
| 10/14/2025 07:45 PM UTC |
|
Project No. 2023-727 Capital Project No. 3469
City of Lake Charles, Louisiana
E. McNeese Sidewalk -
Corbina Rd. to Lake Crest Blvd
Project No. 2023-727
Capital Project No. 3469
PROJECT SUMMARY: The general scope of work for Project No. 2023-727 involves installing a new 8’ wide sidewalk on the North side of East McNeese Street from the East side of the roundabout at Corbina Rd. to Lake Crest Blvd. This work includes the associated roadway pavement work to facilitate the sidewalk installation.
| 09/02/2025 07:45 PM UTC |
|
Capital Project Number CP 3274
CITY OF LAKE CHARLES, LOUISIANA
SOUTH PARK DRIVE WATERLINE EXTENSION
(E. GAUTHIER RD. TO RED DAVIS MCCOLLISTER RD.)
CITY OF LAKE CHARLES CAPITAL PROJECT NUMBER
CP 3274
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for South Park Drive Waterline Extension project. The Work includes, but is not limited to, the following:
o Furnishing and installing of approximately 3,008 linear feet of 20-inch PVC and 2,078 linear feet of 24-inch HDPE water main from Red Davis McCollister Road to East Gauthier Road.
| 08/05/2025 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.