General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Capital Project Number CP 3274
CITY OF LAKE CHARLES, LOUISIANA SOUTH PARK DRIVE WATERLINE EXTENSION (E. GAUTHIER RD. TO RED DAVIS MCCOLLISTER RD.) CITY OF LAKE CHARLES CAPITAL PROJECT NUMBER CP 3274 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for South Park Drive Waterline Extension project. The Work includes, but is not limited to, the following: o Furnishing and installing of approximately 3,008 linear feet of 20-inch PVC and 2,078 linear feet of 24-inch HDPE water main from Red Davis McCollister Road to East Gauthier Road.
08/05/2025 07:45 PM UTC
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana Project No. 2024-746 Capital Project No. 3502 Kirby and Hodges Street Sidewalk Repairs The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
07/01/2025 07:45 PM UTC
LCR409
City of Lake Charles, Louisiana Buddy Prejean Park Enhancements LCR409 The overall project will include renovations/upgrades to the (2) existing ball fields. The existing fields will have all components removed and new installed. This will include new fencing, new dugouts, new lighting at the baseball field, and new backstop. The fields will be one for baseball and one for softball. The fields will be built to NHSA dimensions for high school sizes and be natural grass/clay. Other miscellaneous components will be provided as needed for a complete and useful project. Alternate No. 1 is for additional fencing and gates as shown on the project drawings.
06/17/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3426
City of Lake Charles Wastewater Treatment Plant A Operational Reliability Improvements Collection System Hardening Capital Project Number CP3426 I. Scope of Work: Implementation of CIPP lining and repairs, as needed, to large diameter (i.e. 24-inch diameter and above) gravity collection mains within the treatment site's service area to reduce I&I to better pump operations and work towards meeting requirements of the subject compliance order. This Work shall be more thoroughly described as: Collection System Hardening • Ford Street from Church Street to Mill Street – (~ 1,367 ft of 24”) o Cleaning/CCTV of Existing 24” Diameter Gravity Sewer Main o Installation of CIPP Lining within Existing 24” Diameter Gravity Sewer Main o Reinstitute Existing Sanitary Sewer Service Laterals o Interior Protective Lining of Existing Concrete Manholes o Furnish, Install, and Maintain Bypass Pumping • Pine Street from Ford Street to Reid Street – (~ 920 ft of 24”) o Cleaning/CCTV of Existing 24” Diameter Gravity Sewer Main o Installation of CIPP Lining within Existing 24” Diameter Gravity Sewer Main o Reinstitute Existing Sanitary Sewer Service Laterals o Interior Protective Lining of Existing Concrete Manholes o Furnish, Install, and Maintain Bypass Pumping • N. Railroad Avenue from Bilbo Street to Enterprise Boulevard – (~ 3,510 ft of 30” and ~ 3,520 ft of 36”) o Cleaning/CCTV of Existing 30” Diameter Gravity Sewer Main o Cleaning/CCTV of Existing 36” Diameter Gravity Sewer Main o Installation of CIPP Lining within Existing 30” Diameter Gravity Sewer Main o Installation of CIPP Lining within Existing 36” Diameter Gravity Sewer Main o Reinstitute Existing Sanitary Sewer Service Laterals o Interior Protective Lining of Existing Concrete Manholes o Furnish, Install, and Maintain Bypass Pumping
04/01/2025 07:45 PM UTC
CP3512
City of Lake Charles, Louisiana Goosport Park New Pool and Improvements CP3512 Providing a new pool to the north of the existing Goosport Park multi-purpose family community center. Project will include a new swimming pool, new pool equipment, new concrete deck, new fencing and other work as noted on drawings and specifications.
04/01/2025 07:45 PM UTC
2025-01
Request for Qualifications for Transit Facility Back-Up Power Improvements
02/18/2025 08:45 PM UTC
Project No. 2024-742 Capital Project No. 3259
City of Lake Charles, Louisiana Project No. 2024-742 Capital Project No. 3259 Mount Talbot Street Drainage Outfall Improvement The general scope of work for this project includes the installation of reinforced concrete pipe with drainage boxes in the existing open channel that currently serves as the outfall for Mount Talbot Street. This existing outfall channel is located on the East side of Lot 25 o the Bush Gardens Subdivision and abuts the West side of O.D. Johnson Ball Field.
01/14/2025 08:45 PM UTC
1 - 10 of 380 Solicitations
← Previous 1 3 4 5 6 7 8 9 37 38