General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2026-17
Request for Qualifications for Architectural & Engineering Design of Resilient Indoor Multi-Sports & Recreation Complex
04/14/2026 07:45 PM UTC
CP3538
City of Lake Charles, Louisiana Buddy Prejean Park Lighting CP3538 The overall project will include new field to the existing softball field. The field will be designed for NHSA regulation foot candles. Other miscellaneous components to be provided as per the bid drawings and manual.
04/14/2026 07:45 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Capital Project Number CP3242
CITY OF LAKE CHARLES, LOUISIANA SOUTHERN SEWER LOOP GULF HIGHWAY LIFT STATION FORCEMAIN & GRAVITY EXTENSION CITY OF LAKE CHARLES CAPITAL PROJECT NUMBER CP3242 I. Background: Waggoner Engineering, Inc. (Engineer) was retained by the City of Lake Charles to evaluate a solution to a significant bottleneck occurring at the Sarver Lift Station, which serves as the main anchor station to WWTP ‘D’. Through the evaluation, the station was found to be grossly undersized to accommodate peak weather conditions, much less, expansive growth in its collection area. Due to significant costs and physical constraints associated with expanding the Sarver Lift Station and its collection system, an alternate solution was proposed to redirect flows from the Sarver Lift Station’s service area into an independent transmission system, that would deposit flow downstream of the Sarver Lift Station. The system would serve not only to divert flow from the service area of the Sarver Lift Station, but also, provide adequate capacity to collect flows from presently unserved areas. The full extent of the transmission system will be constructed in phases to expedite completion and reduce capital expenditures of initial construction. Incoming flow will trigger progression into the successive phases of the proposed improvements. Therefore, completion of the transmission system will be controlled by its necessity (i.e. increase in flow either through growth or extension of collection infrastructure). II. Project Scope of Work: Design of approximately 13,500 linear feet of 30/36-inch sewer forcemain from the Gulf Highway Lift Station (Contract ‘B’) to Nelson Road. Project shall conclude at the junction point with Segment 1 and Segment 2 (both by Others) of Phase I of this Project. Design services shall be as per the City of Lake Charles A&E Manual.
03/31/2026 07:45 PM UTC
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749 CAPITAL PROJECT NO. 3309 HAM REID ROAD WATERLINE EXTENSION- ELLIOTT RD. TO BIG LAKE RD. CITY OF LAKE CHARLES, LA SCOPE OF WORK: The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
03/17/2026 07:45 PM UTC
DR002
City of Lake Charles, Louisiana Lake Charles Public Works New Facility Phase 2 DR002 Scope of Project Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
03/03/2026 08:45 PM UTC
LCR 401
City of Lake Charles, Louisiana Lock Park Inclusive Playground LCR 401 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to: PROJECT SUMMARY: • The scope of work that is considered base bid includes: o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking; o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees; o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system. • The scope of work that is considered alternates includes: o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle. o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
03/03/2026 08:45 PM UTC
2026-12
Millennium Park Fall Surface Replacement In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center. All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
03/03/2026 08:45 PM UTC
LR0002
City of Lake Charles, Louisiana Sallier Street Reconstruction LR0002 M.A. Project No. B6-17080-DA SCOPE OF WORK: The project scope of work for Sallier Street Reconstruction consists of the following brief summary: • Base Bid - Riverside Drive to Lake Street o Rehabilitation of an existing two-lane concrete roadway with a three-lane concrete roadway. The expansion of the roadway section is in response to LADOTD's extension of Nelson Road Extension and Bridge (Contraband Bayou Bridge), the large quantity of undeveloped property along Sallier Street and the volume of existing and projected traffic detailed under numerous traffic studies. The project scope will address major improvements in drainage, sanitary sewer and water services due to their required relocation. The Port of Lake Charles under a separate contract relocated the existing rail to the north side of Sallier Street in support of the LADOTD Nelson Road Extension and Bridge with ends at Riverside Drive. • Alternate No. 1 - Riverside Cul-De-Sac o The construction of a cul-de-sac at the southern end of Riverside Drive which was required to be dead ended as a result of the LADOTD Nelson Road Extension and Bridge (Contraband Bayou Bridge) project. • Alternate No. 2 - Riverside Drive and Lake Street Drainage Improvements o The installation of drainage improvements along Riverside Drive and Lake Street is a result of supporting the drainage infrastructure under the Sallier Street Base Bid scope of work. Riverside Drive drainage infrastructure serves as the drainage outfall for the western Sallier Street subsurface drainage infrastructure. The widening and resulting drainage improvements along Lake Street are a result of the Lake/Sallier interchange improvements to facilitate projected traffic counts through the interchange. • Alternate No. 3 - Walnut Grove Improvements o The rehabilitation of Depot Alley includes construction of a new interchange with Sallier Street and parking improvements within the Depot Alley right of way between W. Walnut Street and Jabez Drive.
02/03/2026 08:45 PM UTC
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
CP3427
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT B/C SLUDGE PROCESSING IMPROVEMENTS CAPITAL PROJECT NUMBER CP3427 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following: • Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors. • Installation of Access Hardware for Operation/Maintenance of Digestors. • Construction of New Blower Building for Process Equipment. • Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion. • Construction of New Motor Control Center. • Reconstruction of Existing Sludge Pump Station. • Construction of New Sludge Processing Building. • Installation of Screw Presses for Solids Processing. • Installation of Dewatering Polymer Feed System. • Installation of Conveyance System for Solids Handling/Disposal. • Interconnections to Owner’s SCADA for Control/Monitoring. • Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
12/16/2025 08:45 PM UTC
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA SOUTHWEST WATER TREATMENT PLANT BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3414 HMGP GRANT NO. DR-4559-43 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear. • Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch. • Installation of Low Voltage Panelboard for Supply to Generator Appurtenances. • Interconnections to Owner’s SCADA for Generator Monitoring. • Miscellaneous Civil and Electrical Work as Required to Complete the Work.
12/02/2025 08:45 PM UTC
1 - 10 of 394 Solicitations
← Previous 1 3 4 5 6 7 8 9 39 40