CP 3492
City of Lake Charles, Louisiana
Mallard Golf Driving Range
CP 3492
1. Four covered hitting bays totaling 1,333 SF with integrated hitting surfaces, rough ins for ball tracing technology by owner, integrated hitting surfaces, dining area behind each station, heating, and architecture matching the existing clubhouse.
2. Bar area totaling 1,178 SF with fold-up doors on all sides, serving bar, and seating area, architecture consistent with existing clubhouse.
3. Paved hitting area at the driving range with 5’ x 5’ hitting mats.
4. Two additional charging stations at existing cart facility serving 12 golf carts and a paved night hitting area with durable hitting mats.
| 09/15/2026 07:45 PM UTC |
|
CP 3537
City of Lake Charles, Louisiana
Goosport Recreation Splash Pad
CP 3537
Remove the existing splash pad and build a new splash pad and putting green and other work as noted in the project plans and project manual.
| 09/15/2026 07:45 PM UTC |
|
Capital Project No. CP3051
City of Lake Charles, Louisiana
2025 Citywide Striping Package
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 26-006
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Southpark Road (McNeese Street to Smith Road)
2. 6th Avenue (12th Street to Broad Street)
3. Hodges Street (Alamo Street to Belden Street)
4. Bilbo Street (S. Railroad Avenue to Clarence Street)
5. Lake Street (Shell Beach Drive to Prien Lake Road)
6. Opelousas Street (Enterprise Boulevard to Highway 171)
7. Fitzenreiter Road (Riverside Park to Highway 171)
8. North Goos Boulevard (Knapp Street to Opelousas Street)
9. Medora Street (Simmons Street to Highway 171)
10. Shattuck Street (Broad Street to Moeling Street)
11. 18th Street (Lake Street to Ryan Street)
12. Enterprise Parkway (Interstate 10 to Katherine Street)
13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road)
14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road)
15. Enterprise Boulevard (12th Street to Prien Lake Road)
16. Broad Street (Lakeshore Drive to Enterprise Boulevard)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. 6th Street (4th Avenue to Highway 14)
19. Mill Street (Lakeshore Drive to Highway 14)
20. Common Street (McNeese Street to Prien Lake Road)
21. Lake Street (Prien Lake Road to McNeese Street)
22. Kirkman Street (Jackson Street to McNeese Street)
23. Alamo Street (Ryan Street to Enterprise Boulevard)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. 12th Street (Highway 14 to Hodges Street)
26. Sallier Street (Lake Street to Hodges Street)
27. Ernest Street (Sale Road to Sallier Street)
28. Jefferson Drive (University Drive to University Drive)
29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road)
30. General Doolittle Avenue (Highway 14 to General Twining Street)
31. Alvin Street (Sallier Street to Shell Beach Drive)
32. 18th Street (Enterprise Boulevard to Highway 14)
33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive)
34. Russell Street (12th Street to Hillcrest Drive)
35. Hillcrest Drive (Highway 14 to Russell Street)
36. N. Prater Street (Knapp Street to Fitzenreiter Road)
37. Pear Street (Knapp Street to Fitzenreiter Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 09/15/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project No. CP3005
Capital Project No. CP3005
Lake Charles Downtown
Fiber Network Phase 1
City of Lake Charles, LA ~
The purpose of this project is to build a fiber optic network among various municipal buildings in downtown Lake Charles.
This project has four tasks:
1. Install underground conduit from Ryan Street to City Hall
2. Install underground conduit from Ryan Street to 1911 City Hall
3. Install underground conduit from City Hall to the 911 Building on Hodges Street
4. Install fiber optic cable from City Hall to several downtown buildings.
| 06/16/2015 07:45 PM UTC |
|
CP3120 Contraband Lift Station Rehabilitation Project
Capital Project No. CP3120
Contraband Lift Station Rehabilitation Project
City of Lake Charles, LA ~
The City of Lake Charles Wastewater Division owns and operates the Contraband Lift Station. Wastewater Division personnel have indicated that at a minimum the following items must be addressed as part of the rehabilitation project:
1. Remove existing pumps/motors and replace with dry pit submersible pumps, and upgrade electrical equipment as needed to accommodate new pumps
2. New pumps are to be equipped with variable frequency drives. Due to the size of these drives, a new slab on grade building will house the drives. This new electrical building will have a brick veneer and architectural shingle roof.
3. In addition to the new electrical building, addition site improvements include new P.C.C. pavement, green slatted hurricane fencing with brick columns, and improvements to the access road leading to the lift station site.
4. All suction and discharge valves are to be replaced with new.
5. Existing wet well is to be cleaned, repaired, and coated.
| 05/05/2015 07:45 PM UTC |
|
Project No. 2015-644, Capital Project No. 2894
Project No. 2015-644
Capital Project No. 2894
Sale Road Lift Station
Wet Well Wall Structural Rehabilitation
City of Lake Charles, LA ~
Contractor shall provide all materials, all labor, supervision, tools, construction equipment, transportation, services, incidentals and temporary facilities, including electrical power, water, sanitary facilities, offices, and warehouses and other services necessary to construct, complete in place and accepted the new Wet Well Wall Structural Rehabilitation at the Sale Road Lift Station located at 715 W. Sale Road in the City of Lake Charles, Louisiana. All work shall be in accordance with the plans and specifications and/or engineer approved shop drawings.
In general, the work includes, but is not limited to the following:
a. Mobilization
b. Temporary signs and barricades
c. Construct and remove steel sheet pile retaining walls
d. Excavation and disposal of spoils
e. Construct new concrete seal slab
f. Pressure wash the exterior wall surfaces and apply bonding adhesive to the existing wet well walls
g. Construct new concrete exterior wall sections on one side at a time in three (3) lifts per wall.
h. Furnish, place and compact sand backfill
i. Construct aggregate backfill cap at top of fill
j. Remove and replace new 4 foot chain link fence
k. Final cleanup, including hydroseeding
| 03/17/2015 07:45 PM UTC |
|
Project No. 2011-604B, Capital Project No. 3117
Project No. 2011-604B
Capital Project No. 3117
Holmes Street Bridge Removal
City of Lake Charles, LA ~
The general scope of work includes, but is not limited to, the following items:
(a) The removal of the existing timber bridge originally constructed in 1958;
(b) The construction of a concrete pavement turnaround on the South side of the drainage lateral;
(c) The installation of approximately 225 linear feet of W beam guardrail with end of road object markers as indicated on plans;
(d) The installation of the drainage system consisting of approximately 204 linear feet of 18 diameter RCP, 8 each CB-01 drop inlets and 160 linear feet of 18” diameter corrugated metal pipe;
(e) The construction of 6" thick compacted stone aggregate driveways at two locations.
| 03/17/2015 07:45 PM UTC |
|
Project No. 2014-640, Capital Project No. 3109
Project No. 2014-640
Capital Project No. 3109
Mallard Cove Golf Course No. 8 Hole Irrigation Pond
Retaining Wall Rehabilitation
City of Lake Charles, LA ~
The general scope of work for Project No. 2014-640 includes installation of a PVC sheet pile retaining wall around a portion of the irrigation pond at the No. 8 hole at Mallard Cove Golf Course.
| 02/18/2015 08:45 PM UTC |
|
Project No. 2014-634, Capital Project No. 3178
Project No. 2014-634
Capital Project No. 3178
Theriot Street, North Booker Street,
North Adams Street and Woodard Street
Asphalt Overlay and Drainage Improvements
City of Lake Charles, LA ~
The general scope of work for Project No. 2014-634 includes improvements to roadside ditches, patches of full depth asphalt repair; and overlay of the existing asphalt surface.
The project sites for the improvements are Theriot Street from Pear Street to North Adams Street, North Booker Street from Theriot Street to Theriot Street, North Adams Street from Theriot Street to Woodard Street, and Woodard Street from North Adams Street to Simmons Street in the City of Lake Charles, LA.
| 02/18/2015 08:45 PM UTC |
|
Project No. 2014-OP0402
Project No. 2014-OP0402
Reroofing Fire Station #6
City of Lake Charles, LA ~
Provide all labor, material, equipment, and services necessary to complete the installation of all work shown on the plans and specifications.
Project Summary:
Modified Roof Area
1. Remove existing roof membrane and related sheet metal items down to the wood deck.
2. Repair wood deck as required.
3. Remove drain bowl and drain lines. Close holes with 16 galvanized sheet metal.
4. Loose lay red rosin sheet.
5. Install specified insulation (3” Polyisocyanurate Insulation) with fasteners.
6. Install tapered insulation (1/4” : 12” per foot slope) and recovery board (Six Sided Asphalt Impregnated Wood Fiber) in hot asphalt.
7. Install two-ply, high performance Type III SBS Modified roofing system with granulated surface.
8. Install new metal flashings, expansion joint covers and prefabricated metal edge assembly.
9. Fabricate and install new gutters and downspouts.
10. Provide and install new soffit panel system around perimeter of building.
11. Provide and install sheet metal around existing wood beams.
12. Contractor responsible for all electrical and mechanical work required to complete the specified work. Work may include raising curbs and air conditioning units.
Shingle Roof Area
1. Remove existing shingles and related sheet metal items down to the wood deck.
2. Repair and replace any damaged or rotten decking. Secure loose decking as required.
3. Install specified base sheet over wood deck prior to installing shingles.
4. Set starter shingles in flashing cement.
5. Fabricate and install new drip edge.
6. Fabricate and install new vents.
7. Install new 30 year architectural shingles.
8. Shingle installation shall not commence until modified roof assembly is completed.
9. Issue specified warranty.
| 02/18/2015 08:45 PM UTC |
|
Capital Project No. CP3187
Capital Project No. CP3187
2014 Sidewalk Improvements
City of Lake Charles, LA ~
• The City of Lake Charles desires to provide new sidewalks or repair existing sidewalks in the following locations:
o Lake Street, West Side (Sallier St. to Suffolk Manor Apartment Homes)
o Lake Street, East Side (Busy Bee Gas Station to Baker Street)
o Power Center Parkway, South Side (Existing Sidewalk at Magnet School to Temporary Magnet School)
| 12/16/2014 08:45 PM UTC |
|
Project No. 2011-597, Bond Issue No. SW0011
Project No. 2011-597
Bond Issue No. SW0011
Small Bayou Sewer Force Main and Lift Station Installation
City of Lake Charles, LA ~
This work includes construction of a new lift station and force main, complete with all piping, electrical, pumps, valves, FM monitoring unit, ultrasonic level control, manholes, excavating, backfilling, etc. and any other items necessary to provide a complete system which functions properly to the satisfaction of the Engineer and Wastewater Department.
| 11/18/2014 08:45 PM UTC |
|
Project No. 2014-639, Capital Project No. 3191
Project No. 2014-639
Capital Project No. 3191
12th Street Pavement Repair
Between 8th and 9th Avenue
City of Lake Charles, LA ~
The general scope of work includes removal and replacement of approximately 175 linear feet of existing roadway pavement, base, and subgrade material on 12th Street between 8th and 9th Avenue. The existing subgrade soils are exhibiting swelling characteristics. The distressed pavement and poor subgrade material shall be removed and replaced with #610 stone base material and new concrete pavement. Roadway and impacted drives, walks, and drainage will be repaired.
| 11/04/2014 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.