General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-150679 300 W 10th – Rooms 440 and 442 REBID
Renovation of three operating room suites. Upgrades include wall finishes, replacing existing ceramic tile with full height wall protection, and electrical work. New ceiling hung medical booms are planned to replace the existing including medical gases, electrical and structural work. New AV pathways will be provided for new equipment. Sprinklerand fire alarm work will be required for renovation work.Provide CO2 in ORs and tie into existing manifold in Rhodes/Doan Hall.
04/11/2017 06:00 PM UTC
OSU-160299 Fawcett - East Wing Renovation (RE-BID)
Fawcett - East Wing Renovation includes conference rooms and new SASSO office improvements on ground floor.
04/10/2017 06:00 PM UTC
OSU-160380 BP 1 Wexner Medical Center 72 Bed Build Out
Bid Package No. 1 – BUCK HOIST PACKAGE The complete scope of Work for Bid Package No. 1 shall include the erection, operation, and subsequent dismantling and removal or the Man/Material Hoist System and associated roof scaffolding system. The work of this Bid Package includes the removal of existing curtainwall as required to provide adequate passage of man-power and materials into the building; building a weather and air tight, fully insulated enclosure to protect the opening created by the removal of the curtainwall system; storage of the removed curtainwall sections and glazing; followed by reinstallation of the curtainwall system and removal of the weathertight enclosure at the completion of the Bid Package 2 Work. The Bid Package 2 Work is scheduled to be completed in 13 months. Upon award of the Bid Package 2 Work, the Contractor awarded the Bid Package 1 Work shall be assigned to the Bid Package 2 Contractor and sh
04/07/2017 06:00 PM UTC
OSU-150009 Roof Repairs and Replacement Phase 2 (BP1)
Roof Repairs and Replacement Phase 1 (BP1) Caldwell Lab 2024 Neil Ave, Columbus, Oh Dreese Lab, 2015 Neil Ave, Columbus, Oh
04/05/2017 05:00 PM UTC
OSU-150009 Roof Repairs and Replacement Phase 2 - (BP2)
OSU-150009 Roof Repairs and Replacements Phase 2 (BP2) Drinko Hall 55 W 12th Avenue, Columbus, Oh Graves Hall, 333 W 10th Avenue, Columbus, Oh
04/05/2017 05:00 PM UTC
OSU-160664, NRDT - Clock Tower (Rebid)
This project will construct a clock tower in the North Residential district of main campus. The clock tower façade will mainly be brick and stone work. The work within the contract will include masonry, steel support, glazing, roofing, mechanical and electrical.
04/03/2017 06:00 PM UTC
OSU-150679 300 W. 10th Ave - Rooms 440 and 422
This project will move medical gas booms and fully integrate with equipment and medical gas booms including new surgical lights and technology.
03/21/2017 06:00 PM UTC
OSU-160299 Fawcett - East Wing Renovation
Fawcett - East Wing Renovation includes conference rooms and new SASSO office improvements on ground floor.
03/20/2017 06:00 PM UTC
OSU-160664, NRDT - Clock Tower
This project will construct a clock tower in the North Residential district of main campus. The clock tower façade will mainly be brick and stone work. The work within the contract will include masonry, steel support, glazing, roofing, mechanical and electrical.
03/10/2017 07:00 PM UTC
OSU-160890, Marion - Electrical, Lighting and HVAC Upgrades (Bid Package #1)
OSU Marion Campus: Phase 1 construction to replace the HVAC system in Rooms 190, 191, 193, 194, 196, 197, 199, 199A and the adjacent corridor in Bryson Hall.
03/03/2017 07:00 PM UTC
501 - 510 of 593 Solicitations
1 2 47 48 49 51 53 54 55 59 60