General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-140075, Mansfield - Campus Roadway
OSU Mansfield Campus: Mansfield Campus Roadway including approximately 2328 LF of new entry drive, stormwater, shared use path, roadway lighting, traffic signal and other associated work.
02/08/2018 07:00 PM UTC
OSU-150010 Fire System Replacements, Cockins Hall 4th FL Renovation REBID
REBID OSU-150010 - The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
02/08/2018 07:00 PM UTC
OSU-170578, Mirror Lake Cafe Upgrades
Interior Renovations to the existing Mirror Lake Cafe located in Pomerene Hall: BLDG # 067, 1760 Neil Ave., Columbus, Ohio 43210. Work consists of removal and replacement of casework and misc. finishes, limited new lighting and power, limited plumbing and electrical improvements. Walk-Through cooler.
02/06/2018 07:00 PM UTC
OSU-170872, Morehouse Pavilion-First Floor MRI
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
02/01/2018 07:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation (REBID)
This project is a Re-Bid. Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
02/01/2018 06:00 PM UTC
OSU-160892, Marion - Morrill Hall 3rd Floor Renovation
OSU Marion Campus: The project scope includes the renovation of the third floor of Marion-Morrill Hall. The peroject will renovate 19,100 SF for new faculty offices, classroom spaces, and student spaces. Existing partitions, doors, finishes, ceilings, and MEP systems will be removed.
01/31/2018 07:00 PM UTC
OSU-170647, Rhodes - Room M212E Modifications
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
01/18/2018 07:00 PM UTC
OSU-160147 James Door Operators
This project will reconfigure approximately 50 door operators that continue to function when the fire alarm system is activated.
01/16/2018 06:00 PM UTC
OSU-170391 Transportation Plan Implementation BP6
This project installs a concrete entry drive connector from John H. Herrick Drive to the loading dock of Biomedical Research Tower. Concrete curb, pavement striping, partial free standing wall removal, modifications to wall face brick, tree relocation, turf restoration, and other restoration items are part of the work.
01/10/2018 07:00 PM UTC
OSU-150010 Fire System Replacement BP2
OSU-150010 Fire System Replacement BP2 - Cockins Hall 4th Fl Renovation The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
01/09/2018 08:00 PM UTC
471 - 480 of 622 Solicitations
1 2 44 45 46 48 50 51 52 62 63