General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-170358, 2001 Polaris Parkway - Molecular Pathology
Build out of existing lab/support space for the 2 story property at 2001 Polaris Parkway, Columbus, OH 43240. First floor scope: Renovation of approximately 17,000 sf including Molecular Pathology Lab, offices and support spaces. Also included are locker/change room, kitchen/break room and minor restroom/shower upgrades. Second floor scope: Approximately 11,000 sf for a lactation room upgrade and new electrical drops for systems furniture to accommodate new workstations. Exterior work is limited to a new egress door in an existing storefront system and associated concrete pad.
02/09/2018 06:00 PM UTC
OSU-140075, Mansfield - Campus Roadway
OSU Mansfield Campus: Mansfield Campus Roadway including approximately 2328 LF of new entry drive, stormwater, shared use path, roadway lighting, traffic signal and other associated work.
02/08/2018 07:00 PM UTC
OSU-150010 Fire System Replacements, Cockins Hall 4th FL Renovation REBID
REBID OSU-150010 - The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
02/08/2018 07:00 PM UTC
OSU-170578, Mirror Lake Cafe Upgrades
Interior Renovations to the existing Mirror Lake Cafe located in Pomerene Hall: BLDG # 067, 1760 Neil Ave., Columbus, Ohio 43210. Work consists of removal and replacement of casework and misc. finishes, limited new lighting and power, limited plumbing and electrical improvements. Walk-Through cooler.
02/06/2018 07:00 PM UTC
OSU-170872, Morehouse Pavilion-First Floor MRI
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
02/01/2018 07:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation (REBID)
This project is a Re-Bid. Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
02/01/2018 06:00 PM UTC
OSU-160892, Marion - Morrill Hall 3rd Floor Renovation
OSU Marion Campus: The project scope includes the renovation of the third floor of Marion-Morrill Hall. The peroject will renovate 19,100 SF for new faculty offices, classroom spaces, and student spaces. Existing partitions, doors, finishes, ceilings, and MEP systems will be removed.
01/31/2018 07:00 PM UTC
OSU-170647, Rhodes - Room M212E Modifications
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
01/18/2018 07:00 PM UTC
OSU-160147 James Door Operators
This project will reconfigure approximately 50 door operators that continue to function when the fire alarm system is activated.
01/16/2018 06:00 PM UTC
OSU-170391 Transportation Plan Implementation BP6
This project installs a concrete entry drive connector from John H. Herrick Drive to the loading dock of Biomedical Research Tower. Concrete curb, pavement striping, partial free standing wall removal, modifications to wall face brick, tree relocation, turf restoration, and other restoration items are part of the work.
01/10/2018 07:00 PM UTC
491 - 500 of 643 Solicitations
1 2 … 46 47 48 50 52 53 54 … 64 65