General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/14/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-150258 Utility Distribtuion System Renewal
Utility Distribution System Renewal
12/16/2016 06:00 PM UTC
OSU-150194 Lincoln - Suite 220 Renovation
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
12/15/2016 07:00 PM UTC
OSU-160527 Parks Room 437 Renovation
Parks Hall - This project will renovate the lab including benches, faucets, fume hoods, flooring.
12/13/2016 07:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement, BP2
Aluminum window replacement of approximately 50 existing masonry openings. Entrance door replacement of 3 exterior doors.
12/13/2016 06:00 PM UTC
OSU-160302 Rhodes Public Restroom
This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
11/28/2016 04:00 PM UTC
OSU-160938 Vet Med Surgical Suite Renovation
This project will renovate surgery and IT facilities to accommodate expansion.
11/28/2016 04:00 PM UTC
OSU-160422 UH East – Elevator 10-11 Modernization
This project will modify the two elevators.
11/22/2016 07:00 PM UTC
OSU-160298 Fawcett Center - Lobby Cafe
Renovation of the Fawcett Center lobby for the construction of a new café and seating area.
10/31/2016 06:00 PM UTC
OSU-160240 Building Identification Sign Replacement
Building Identification Sign Replacement Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents. Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass. Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape. An alternate for (2) Sign Type 41 monument signs. Installation of temporary signs (purchased by allowance through the Owner) while signs are being refurbished. Removal of temporary signs after refurbished signs are installed.
10/19/2016 06:30 PM UTC
OSU-150012 Elevator Safety Repair and Replacements
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
10/06/2016 05:00 PM UTC
491 - 500 of 558 Solicitations
1 2 46 47 48 50 52 53 54 55 56