The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
| 08/21/2025 06:00 PM UTC |
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
| 09/03/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-160296 ATI - Residence Hall Demolition
The project consists of asbestos abatement at The Ohio State University-ATI Residence Hall, 1328 Dover Rd., Wooster, Ohio 44691; and demolition and disposal of the building and site improvements at the same location.
| 02/28/2017 07:00 PM UTC |
OSU-160343 REBID Carepoint Lewis Center - 1st & 2nd Floor Office
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine.
| 02/24/2017 07:00 PM UTC |
OSU-160464 Mack - Restroom Renovations
The project involves the demolition and renovation of residence rooms, bathrooms, and electrical branch service and wiring in the A and B wings wiring of Mack Hall. The completed design will be consistent with the previous renovation of the C and D wings in Mack Hall that were completed in 2009.
| 02/24/2017 03:00 PM UTC |
OSU-160657 Ackerman – Chilled Water and Boiler
This project will install a boiler plant including pumping system and DDC controls and install a chilled water plant.
| 02/23/2017 07:00 PM UTC |
OSU-160422 UH East Elevator 10-11 Modernization
This project will renovate two elevators
UH East
181 Taylor Avenue
Columbus OH 43203
| 02/21/2017 07:00 PM UTC |
OSU-160343 CarePoint Lewis Center
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine. Lewis Center, Ohio
| 02/07/2017 07:00 PM UTC |
OSU-160376 Ross – 4th Floor Hybrid Operating Room
This project will renovate the OR and replace imagine equipment to create a hybrid suite.
| 02/02/2017 07:00 PM UTC |
OSU-150403 University Hospitals Relocate Surgical Pathology
This project will relocate Surgical Pathology from 4 East to 5 East.
| 01/19/2017 07:00 PM UTC |
OSU-138009 Steam and Condinsate Distribution System Upgrades Phase 3 - BP3 Pomerene Tunnel
This project installs new waterline, replaces concrete trench, performs structural repairs, installs a concrete tunnel vault, replaces condensate piping and steam piping, installs chilled water supply and return piping, and completes other utility improvements to the Pomerene tunnel in the area from South Oval Drive to just north of 12th Avenue eastbound.
| 01/10/2017 06:00 PM UTC |
OSU-150011 Bricker Hall HVAC Repiar and Renovation BP1 Demolition
Bricker Hall 3rd Floor HVAC and ceiling removal. Install new ceiling and lights as well as demolition
| 12/22/2016 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.