General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
OSU-130331 University Hospitals Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions. University East 181 Taylor Ave Columbus, OH 43203
09/08/2016 06:00 PM UTC
OSU-130635 North High Street Landscape BP 2 (Ohio Field Signage)
To provide historical interpretive signage for the portion of campus west of High Street between Woodruff Street and 17th Ave.
09/08/2016 04:00 PM UTC
OSU-150194 Lincoln - Suite 220 Renovation
** This project has been cancelled until further notice. This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
08/15/2016 06:00 PM UTC
OSU-150010 Fire System Replacements
The project consists of new manual fire alarm systems, hazardous material abatement of duct and pipe insulation, mudded fittings, ceiling and floor tiles, and the associated material replacement, and architectural patching and finishes in 9 buildings on OSU’s main campus: Agricultural Administration Building, Atwell Hall, Campbell Hall, Denney Hall, (Alternate 1) Enarson Classroom Building, Electroscience Lab, Sisson Hall, University Hall, Scott Hall. The existing fire alarm system in each building will be removed completely after the approval of the new system.
08/12/2016 02:00 PM UTC
OSU-120652, Lima - Booster Pump Station
OSU Lima Campus-This project will install a new master booster pump station to increase campus water pressure to all buildings.
08/11/2016 06:00 PM UTC
OSU-160198, 1900 Kenny Rd - Flooring and Window Replacement
This project involves the removal and replacement of all existing windows; removal and replacement of a portion of the existing entrance doors; the removal and replacement of existing floor finishes in corridors and stairs; painting of corridor walls; and the installation of new room identification signs.
08/10/2016 06:00 PM UTC
OSU-160203, Newark - Founders Administrative Office-REBID
OSU Newark Campus - The project scope covers the renovation of existing interior spaces for a new Executive Office Suite for the Dean of The Ohio State University, Newark Campus. The areas to be remodeled comprise approximately 1,550 square feet. Existing walls, doors, finishes, electric and HVAC systems will be removed.
08/10/2016 05:00 PM UTC
OSU-150012 Elevator Safety Repair and Replacements BP2
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
08/09/2016 05:00 PM UTC
OSU-150017 Electrical Infrastructure Improvements - REBID
Electrical Campus Infrastructure on main campus
08/04/2016 05:00 PM UTC
OSU-160193, Celeste - Basement Lab Renovation
The Project renovates portions of the lower level and second floor of Celeste Laboratory. The work includes selective demolition of existing partitions; providing partitions to demark and subdivide new rooms; and develops new labs and offices.
07/20/2016 06:00 PM UTC
511 - 520 of 566 Solicitations
1 2 48 49 50 52 54 55 56 57