OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160245, Ross - ACC Exam Room Oxygen
OSU Ross Heart Hospital ACC Exam Room Oxygen Unit Interior Upgrades to plumbing med gas oxygen extensions as well as supportive work including: selective demolition, interior partition selective demolition, patch and repair, painting finishes, and electrical system limited outlets.
11/15/2017 06:00 PM UTC
OSU-160915, Wooster - Secrest Welcome Center
OSU Wooster Campus: The Project consists of an interior renovation and re-programming of the existing OARDC Operations and Maintenance Building into the Ohio State University Secrest Arboretum Welcome Center.
11/14/2017 07:00 PM UTC
OSU-160375, Doan - Room W293 Endoscopy Renovation
Renovation of existing Endoscopy Reprocessing Room to include replacement of existing pass throughs and scope cabinets, new equipment and sinks, new casework and finish upgrades. Wall modifications to the existing reprocessing Room and adjacent procedure rooms will be required. Modifications to multiple adjacent rooms adjacent to the Lab will be required to enable the renovation of the main endoscopy lab. The project will be constructed in multiple phases with an emphasis on sequence of events closely coordinated with hospital operation.
11/09/2017 07:00 PM UTC
OSU-150015 Plumbing Repair - RPAC Steam and Hot Water
Plumbing Repairs - RPAC Steam and Hot Water
11/01/2017 07:00 PM UTC
OSU-160911, CFAES Lab and Office Renovations (Rebid)
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
11/01/2017 06:00 PM UTC
OSU-160980 Plumbing System Replacement
The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. The project includes abatement of hazardous material
10/20/2017 05:00 PM UTC
OSU-160976 Elevator Safety Repairs and Replacements Phase 2
Elevator Modernization and related architectural and MEP scopes of work for a total of 8 elevators in 6 buildings on OSU’s Main Campus: Newton Hall Journalism Building 33 W. 11th Ave. Enarson Hall Arps Hall Drinko Hall
10/17/2017 06:00 PM UTC
OSU-160774 Drackett - Corridor Ceilings (RE-BID)
Installation of lay-in ceiling system and lights.
10/13/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation
OSU Mansfield Campus: The work consists of the renovation of approximately 7000 square feet of teaching lab, lab prep, lab storage, research lab and lounge areas in the second floor of Conard Hall.
10/02/2017 05:00 PM UTC
OSU-160929, Lima - Standby Generators
OSU Lima Campus: This project consists of providing new generators, associated automatic transfer switches, and life safety system upgrades for Galvin Hall and the Student Services building. The project will include all plumbing work required for the electrical scope to be completed.
09/28/2017 06:00 PM UTC