General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160240 Building Identification Sign Replacement BP2
Bid Package No.2 Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents. Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass. Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape
09/26/2017 06:30 PM UTC
OSU-160911, CFAES Lab and Office Renovations
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
09/20/2017 06:00 PM UTC
OSU-160633 Taylor Tower - Boiler Replacements Bid Package 2
This project consists of the replacement of 2 domestic Hot Water Storage Tanks on the 14th floor of Jones Tower with 6 new tanks, and the installation of a new thermostatic mixing valve to limit domestic hot water supply temperature distributed to the building.
09/19/2017 06:00 PM UTC
OSU-160914, Wooster - Pounden FAHRP Discovery Theme Space
OSU-Wooster: The work includes but is not limited to the interior buildout of approximately 925 S.F. of existing shell space located in the first floor of Pounden hall into new research space. The project will include a larger lab and a smaller cell culture lab within the 925 S.F. space. The Work will include general trades, mechanical, electrical, plumbing, fire protection and communications work. The existing adjacent areas shall remain in operation throughout the Project.
09/13/2017 05:00 PM UTC
OSU-170173 1165 Kinnear - Staff Renovation
This project will relocate staff from the Laundry Building and Service Annex to 1165 Kinnear Rd.
09/07/2017 05:00 PM UTC
OSU-170505 James Room A014 ICC
This project will renovate the space to accommodate ICC.
08/25/2017 05:00 PM UTC
OSU-140073 REBID
Rhodes/Doan - 4th Floor OR Power Distribution - This project will evaluate power distribution in various ORs to identify areas to upgrade.
08/24/2017 06:00 PM UTC
OSU-160535 Doan Nuclear Medicine Renovation
This project will redesign and renovate the waiting room, injection rooms, radiopharmaceutical storage and clean supply storage areas on the second floor.
08/22/2017 06:00 PM UTC
OSU-170391 Transportation Plan Implementation BP5
BP #5 includes construction of two new soccer fields adjacent to Carmack Road.
08/08/2017 06:30 PM UTC
OSU-160770
OSU Vet Hospital Simulation Lab - This project will renovate space to create a lab where students can practice techniques.
08/08/2017 06:00 PM UTC
521 - 530 of 643 Solicitations
1 2 … 49 50 51 53 55 56 57 … 64 65