General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-150403 University Hospitals Relocate Surgical Pathology
This project will relocate Surgical Pathology from 4 East to 5 East.
01/19/2017 07:00 PM UTC
OSU-138009 Steam and Condinsate Distribution System Upgrades Phase 3 - BP3 Pomerene Tunnel
This project installs new waterline, replaces concrete trench, performs structural repairs, installs a concrete tunnel vault, replaces condensate piping and steam piping, installs chilled water supply and return piping, and completes other utility improvements to the Pomerene tunnel in the area from South Oval Drive to just north of 12th Avenue eastbound.
01/10/2017 06:00 PM UTC
OSU-150011 Bricker Hall HVAC Repiar and Renovation BP1 Demolition
Bricker Hall 3rd Floor HVAC and ceiling removal. Install new ceiling and lights as well as demolition
12/22/2016 06:00 PM UTC
OSU-150011 Bricker Hall HVAC Repair and Renovation - BP2 - HVAC
Bricker Hall HVAC Upgrades at 2nd and 3rd Floors. New associated electrical and finish upgrades
12/22/2016 06:00 PM UTC
OSU-160397 Browning Amphitheater Restoration
Browning Amphitheater Restoration
12/21/2016 06:00 PM UTC
OSU-150258 Utility Distribtuion System Renewal
Utility Distribution System Renewal
12/16/2016 06:00 PM UTC
OSU-150194 Lincoln - Suite 220 Renovation
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
12/15/2016 07:00 PM UTC
OSU-160527 Parks Room 437 Renovation
Parks Hall - This project will renovate the lab including benches, faucets, fume hoods, flooring.
12/13/2016 07:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement, BP2
Aluminum window replacement of approximately 50 existing masonry openings. Entrance door replacement of 3 exterior doors.
12/13/2016 06:00 PM UTC
OSU-160302 Rhodes Public Restroom
This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
11/28/2016 04:00 PM UTC
521 - 530 of 593 Solicitations
1 2 49 50 51 53 55 56 57 58 59 60