The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
| 04/16/2026 06:02 PM UTC |
|
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
| 04/23/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-160664, NRDT - Clock Tower (Rebid)
This project will construct a clock tower in the North Residential district of main campus. The clock tower façade will mainly be brick and stone work. The work within the contract will include masonry, steel support, glazing, roofing, mechanical and electrical.
| 04/03/2017 06:00 PM UTC |
|
OSU-150679 300 W. 10th Ave - Rooms 440 and 422
This project will move medical gas booms and fully integrate with equipment and medical gas booms including new surgical lights and technology.
| 03/21/2017 06:00 PM UTC |
|
OSU-160299 Fawcett - East Wing Renovation
Fawcett - East Wing Renovation includes conference rooms and new SASSO office improvements on ground floor.
| 03/20/2017 06:00 PM UTC |
|
OSU-160664, NRDT - Clock Tower
This project will construct a clock tower in the North Residential district of main campus. The clock tower façade will mainly be brick and stone work. The work within the contract will include masonry, steel support, glazing, roofing, mechanical and electrical.
| 03/10/2017 07:00 PM UTC |
|
OSU-160890, Marion - Electrical, Lighting and HVAC Upgrades (Bid Package #1)
OSU Marion Campus: Phase 1 construction to replace the HVAC system in Rooms 190, 191, 193, 194, 196, 197, 199, 199A and the adjacent corridor in Bryson Hall.
| 03/03/2017 07:00 PM UTC |
|
OSU-160734 Goss - HVAC System
This project will repair/replace the HVAC system.
| 03/03/2017 06:00 PM UTC |
|
OSU-160927, Lima - Parking Lot Repairs
Renovations to Parking Lot D at the Ohio Lima Campus. Renovations will include removal and replacement of the asphalt pavement and parking lot lighting. Additional paving improvements will also be constructed around the proposed Student Life Building.
| 03/02/2017 07:00 PM UTC |
|
OSU-150026, Lima - HVAC Repair and Replacements
OSU Lima Campus: This project will include the removal of pneumatic control systems; installation of new DDC controls; updating of current constant volume air handling system; updating air boxes; and replacement of exhaust fans on Galvin Hall.
| 02/28/2017 08:00 PM UTC |
|
OSU-160296 ATI - Residence Hall Demolition
The project consists of asbestos abatement at The Ohio State University-ATI Residence Hall, 1328 Dover Rd., Wooster, Ohio 44691; and demolition and disposal of the building and site improvements at the same location.
| 02/28/2017 07:00 PM UTC |
|
OSU-160343 REBID Carepoint Lewis Center - 1st & 2nd Floor Office
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine.
| 02/24/2017 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.