General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160422 UH East – Elevator 10-11 Modernization
This project will modify the two elevators.
11/22/2016 07:00 PM UTC
OSU-160298 Fawcett Center - Lobby Cafe
Renovation of the Fawcett Center lobby for the construction of a new café and seating area.
10/31/2016 06:00 PM UTC
OSU-160240 Building Identification Sign Replacement
Building Identification Sign Replacement Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents. Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass. Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape. An alternate for (2) Sign Type 41 monument signs. Installation of temporary signs (purchased by allowance through the Owner) while signs are being refurbished. Removal of temporary signs after refurbished signs are installed.
10/19/2016 06:30 PM UTC
OSU-150012 Elevator Safety Repair and Replacements
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
10/06/2016 05:00 PM UTC
OSU-130636 Dodd Hall Secure Care System
This project will remove the existing and install a new secure care system on all floors. Dodd Hall Columbus, OH
09/21/2016 05:30 PM UTC
OSU-160633, Taylor Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water heaters and 2 heating water boilers on the 13th and 14th Floors of Taylor Tower. The work also includes replacement of 2 domestic water storage tanks and 6 heating water expansion tanks. The work will be done in 4 phases for minimum impact to building operation. The University will pre-purchase 3 heating water boilers and 2 domestic water boilers to be installed by the Contractor.
09/20/2016 06:00 PM UTC
OSU-130331 University Hospitals Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions. University East 181 Taylor Ave Columbus, OH 43203
09/08/2016 06:00 PM UTC
OSU-130635 North High Street Landscape BP 2 (Ohio Field Signage)
To provide historical interpretive signage for the portion of campus west of High Street between Woodruff Street and 17th Ave.
09/08/2016 04:00 PM UTC
OSU-150194 Lincoln - Suite 220 Renovation
** This project has been cancelled until further notice. This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
08/15/2016 06:00 PM UTC
OSU-150010 Fire System Replacements
The project consists of new manual fire alarm systems, hazardous material abatement of duct and pipe insulation, mudded fittings, ceiling and floor tiles, and the associated material replacement, and architectural patching and finishes in 9 buildings on OSU’s main campus: Agricultural Administration Building, Atwell Hall, Campbell Hall, Denney Hall, (Alternate 1) Enarson Classroom Building, Electroscience Lab, Sisson Hall, University Hall, Scott Hall. The existing fire alarm system in each building will be removed completely after the approval of the new system.
08/12/2016 02:00 PM UTC
561 - 570 of 622 Solicitations
1 2 53 54 55 57 59 60 61 62 63