General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-150728, Houck House - Roof Replacement
This project will replace the roofing system at Houck House on the Columbus Campus.
04/22/2016 06:00 PM UTC
OSU-110215 Street and Bridge Maintenance Phase 1 BP 6 REBID
REBID - Carmack Road Improvements
04/22/2016 05:00 PM UTC
OSU-150016 Road and Bridge Improvements
This project includes reconstruction of approximately 1,000 feet of a service road at OSU Airport and reconstruction of approximately 400 feet of College Road with associated utilities and roadside improvements.
04/18/2016 05:00 PM UTC
OSU-150419, Longaberger - Room 030 Renovation
Longaberger Alumni House - This project will convert the former print shop into office/office support space.
04/15/2016 05:00 PM UTC
5062-PF073757 East Regional Chilled Water Plant Phase 2 Distribution - BP2 Restoration
Phase 2 work includes connecting the North Residential District, Celeste Lab, Newman & Wolfrom, and Evans Lab. Additional phase 2 work will upgrade the steam line for future buildings in the Academic Core North, and replace the tunnel between College Avenue and Smith Lab.
04/07/2016 06:00 PM UTC
OSU-150024, Mansfield - Sidewalks/Lots/Curbs, Phase 2
Phase 2 construction includes work on University Drive, The Child Development Center, Reidl Hall parking lots, and Kenwood Circle on the OSU Mansfield Campus.
03/29/2016 06:00 PM UTC
OSU-150014 Building Envelope Repair
This is a bundled FOD project to repair building envelopes on campus. Exact buildings will be determined during planning/design phase.
03/29/2016 05:00 PM UTC
OSU-140680 Doan Dialysis Renovation and Relocation
This project will move Dialysis from 9W Rhodes to 10W Doan.
03/23/2016 06:30 PM UTC
OSU-150473, Bradley - Elevator Modernization
The Work consists of modernization of an existing overhead traction type, 5-stop elevator located at Bradley Hall on Ohio State University’s Columbus campus. The project will update the elevator including cab, hoistway equipment, machine room equipment and controls, and necessary HVAC and electrical upgrades to support the new elevator and to meet current code requirements.
03/23/2016 05:00 PM UTC
OSU-150513 CCCT- James Family Resource Ctr
This project will fit out shelled space on the ground floor for the James Family Resource and Welcome Center.
03/21/2016 05:30 PM UTC
611 - 620 of 643 Solicitations
1 2 … 57 58 59 60 62 64 65