OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-120652, Lima - Booster Pump Station
OSU Lima Campus-This project will install a new master booster pump station to increase campus water pressure to all buildings.
| 08/11/2016 06:00 PM UTC |
|
OSU-160198, 1900 Kenny Rd - Flooring and Window Replacement
This project involves the removal and replacement of all existing windows; removal and replacement of a portion of the existing entrance doors; the removal and replacement of existing floor finishes in corridors and stairs; painting of corridor walls; and the installation of new room identification signs.
| 08/10/2016 06:00 PM UTC |
|
OSU-160203, Newark - Founders Administrative Office-REBID
OSU Newark Campus - The project scope covers the renovation of existing interior spaces for a new Executive Office Suite for the Dean of The Ohio State University, Newark Campus. The areas to be remodeled comprise approximately 1,550 square feet. Existing walls, doors, finishes, electric and HVAC systems will be removed.
| 08/10/2016 05:00 PM UTC |
|
OSU-150012 Elevator Safety Repair and Replacements BP2
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
| 08/09/2016 05:00 PM UTC |
|
OSU-150017 Electrical Infrastructure Improvements - REBID
Electrical Campus Infrastructure on main campus
| 08/04/2016 05:00 PM UTC |
|
OSU-160193, Celeste - Basement Lab Renovation
The Project renovates portions of the lower level and second floor of Celeste Laboratory. The work includes selective demolition of existing partitions; providing partitions to demark and subdivide new rooms; and develops new labs and offices.
| 07/20/2016 06:00 PM UTC |
|
OSU-150012 Elevator Safety Repair and Replacements BP1
The work consists of the modernization of four (4) traction elevators and one (1) hydraulic elevator in Dreese Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
| 07/13/2016 05:00 PM UTC |
|
OSU-160203, Newark - Founders Administrative Office
The project scope covers the renovation of existing interior spaces for a new Executive Office Suite for the Dean of The Ohio State University, Newark Campus. The areas to be remodeled comprise approximately 1,550 square feet. Existing walls, doors, finishes, electric and HVAC systems will be removed.
| 07/11/2016 06:00 PM UTC |
|
OSU-150015 Plumbing Repair - RPAC Steam and Hot Water
RPAC Plumbing Repairs
| 06/13/2016 06:30 PM UTC |
|
OSU-150626 Ag Admin - Renovate 1st & 2nd Floor Offices
Ag Admin - Renovate 1st & 2nd Floor Offices: Demolition and renovation of the Ag Admin second floor to create a new Administrative Suite for the Business Office and Student Services.
| 06/08/2016 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.