General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-138009 Steam and Condensate Systems Upgrades Phase 3 BP2 (South Neil Tunnel)
This project performs structural repairs, replaces condensate piping, and completes other utility improvements to the South Neil Avenue tunnel from south of 17th Avenue to just south of 12th Avenue westbound in the base bid.
05/19/2016 05:00 PM UTC
OSU-150345 Harding Hospital - Elevator Controls
This project will upgrade the elevator controls.
05/16/2016 05:30 PM UTC
OSU-081058 Water and Natural Gas Distribution System Upgrades (Natural Gas Distribution BP-2)
Relocate 3” gas main out of McCracken tunnel south of Scott Lab west along 18th Ave to Neil Ave Relocate 3” gas main out of tunnel east of Math Tower and Dulles Hall from 18th Ave to 17th Ave. Relocate 3” gas main outside of tunnel south of Derby Hall and tie-in inside Hopkins Hall Encase existing gas line through tunnel at southeast corner of Physics Research Building
05/10/2016 07:00 PM UTC
OSU-140014 Cancer Tower Retail Pharmacy
This project will construct a retail pharmacy in the new Cancer and Critical Care Tower.
05/05/2016 05:00 PM UTC
OSU-108006 Hot Water Pipe Upgrades BP2
Installation of 16 domestic water systems (3 heating water, 9 electric, 4 natural gas) to facilitate the decentralization of 21 buildings from the campus domestic hot water system loop from McCracken. Alternate 1 deletes 4 electric systems, adds 1 heating water system and includes extensive tunnel work. Alternate 2 deletes 1 electric system, adds 1 heating water system. Alternate 3 deletes 1 electric system, adds 1 heating water system
05/03/2016 07:00 PM UTC
OSU-150728, Houck House - Roof Replacement
This project will replace the roofing system at Houck House on the Columbus Campus.
04/22/2016 06:00 PM UTC
OSU-110215 Street and Bridge Maintenance Phase 1 BP 6 REBID
REBID - Carmack Road Improvements
04/22/2016 05:00 PM UTC
OSU-150016 Road and Bridge Improvements
This project includes reconstruction of approximately 1,000 feet of a service road at OSU Airport and reconstruction of approximately 400 feet of College Road with associated utilities and roadside improvements.
04/18/2016 05:00 PM UTC
OSU-150419, Longaberger - Room 030 Renovation
Longaberger Alumni House - This project will convert the former print shop into office/office support space.
04/15/2016 05:00 PM UTC
5062-PF073757 East Regional Chilled Water Plant Phase 2 Distribution - BP2 Restoration
Phase 2 work includes connecting the North Residential District, Celeste Lab, Newman & Wolfrom, and Evans Lab. Additional phase 2 work will upgrade the steam line for future buildings in the Academic Core North, and replace the tunnel between College Avenue and Smith Lab.
04/07/2016 06:00 PM UTC
571 - 580 of 608 Solicitations
1 2 53 54 55 56 58 60 61