The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-150729, Coffey Road Lighting
This project installs new athletic field lighting for the Coffey Road athletics fields.
| 03/15/2016 05:00 PM UTC |
|
OSU-110215 Street and Bridge Maintenance Phase 1 BP6
This project will preform street and bridge maintenance across campus
| 03/02/2016 06:00 PM UTC |
|
OSU-150018 Emergency Generator Replacement
This project will replace emergency generators on campus. Exact replacements will be determined during planning/design phase.
| 03/01/2016 06:00 PM UTC |
|
OSU-150139 Kuhns Hail Damage Repair
This project will completely replace 27 squares of roof.
| 02/26/2016 07:00 PM UTC |
|
OSU-081049 Selected Tunnel Replacement Projects BP 2
This project will replace tunnel sections
| 02/17/2016 06:00 PM UTC |
|
OSU-150030, Marion Roof and Electrical Repairs
Roof and Electrical Repairs on the OSU Marion Campus. The buildings associated with the project are Alber Student Center, Morrill Hall and Technical Education Center.
| 02/05/2016 07:00 PM UTC |
|
OSU-150661 Bolz-Central Svc-Window Replacement
This project will replace the windows in both buildings.
| 02/04/2016 07:30 PM UTC |
|
OSU-150418 Compressed Natural Gas Station
Plans, elevations, sections, details, and schedules
| 02/02/2016 07:00 PM UTC |
|
OSU-150189, Scott Lab-Instructional Lab
Ohio State University Main Campus. The Project renovates portions of the lower level, first and second floor of the west building of Scott Laboratory.
| 02/02/2016 06:00 PM UTC |
|
OSU-160091, WHAC - Air Handler Replacement
This project will replace the air handler for the Woody Hayes Athletic Center.
| 01/13/2016 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.