General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-110215 Street and Bridge Maintenance Phase 1 BP6
This project will preform street and bridge maintenance across campus
03/02/2016 06:00 PM UTC
OSU-150018 Emergency Generator Replacement
This project will replace emergency generators on campus. Exact replacements will be determined during planning/design phase.
03/01/2016 06:00 PM UTC
OSU-150139 Kuhns Hail Damage Repair
This project will completely replace 27 squares of roof.
02/26/2016 07:00 PM UTC
OSU-081049 Selected Tunnel Replacement Projects BP 2
This project will replace tunnel sections
02/17/2016 06:00 PM UTC
OSU-150030, Marion Roof and Electrical Repairs
Roof and Electrical Repairs on the OSU Marion Campus. The buildings associated with the project are Alber Student Center, Morrill Hall and Technical Education Center.
02/05/2016 07:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement
This project will replace the windows in both buildings.
02/04/2016 07:30 PM UTC
OSU-150418 Compressed Natural Gas Station
Plans, elevations, sections, details, and schedules
02/02/2016 07:00 PM UTC
OSU-150189, Scott Lab-Instructional Lab
Ohio State University Main Campus. The Project renovates portions of the lower level, first and second floor of the west building of Scott Laboratory.
02/02/2016 06:00 PM UTC
OSU-160091, WHAC - Air Handler Replacement
This project will replace the air handler for the Woody Hayes Athletic Center.
01/13/2016 06:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements REBID
REBID - construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
01/13/2016 06:00 PM UTC
601 - 610 of 622 Solicitations
1 2 55 56 57 58 59 61 63