OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-150626 Ag Admin - Renovate 1st & 2nd Floor Offices
Ag Admin - Renovate 1st & 2nd Floor Offices: Demolition and renovation of the Ag Admin second floor to create a new Administrative Suite for the Business Office and Student Services.
| 06/08/2016 07:00 PM UTC |
|
OSU-108006 Hot Water Pipe Upgrades (REBID)
Installation of 12 domestic water systems (3 heating water, 5 electric, 4 natural as) to facilitate the decentralization of 17 buildings from the campus domestic hot water system loop from McCracken.
Alternate 1, adds 1 heating water system and includes extensive tunnel work
Alternate 2 add 4 electric system
| 06/06/2016 06:00 PM UTC |
|
OSU-160070 FAWCETT CENTER - BALLROOM CEILING AND LIGHTING
Renovation of the Fawcett Center Ballroom ceiling and lighting.
| 06/01/2016 06:00 PM UTC |
|
OSU-150017 Electrical Infrastructure Improvements
This project will install 3 transformers and 3 primary switches at various locations on main campus and paint and repair the concrete at the OSU substation
| 05/24/2016 05:00 PM UTC |
|
OSU-150009 Roof Repair and Replacement
Roof Repair and Replacement
Agricultural Engineering Building
Maintenance Building
| 05/20/2016 05:30 PM UTC |
|
OSU-138009 Steam and Condensate Systems Upgrades Phase 3 BP2 (South Neil Tunnel)
This project performs structural repairs, replaces condensate piping, and completes other utility improvements to the South Neil Avenue tunnel from south of 17th Avenue to just south of 12th Avenue westbound in the base bid.
| 05/19/2016 05:00 PM UTC |
|
OSU-150345 Harding Hospital - Elevator Controls
This project will upgrade the elevator controls.
| 05/16/2016 05:30 PM UTC |
|
OSU-081058 Water and Natural Gas Distribution System Upgrades (Natural Gas Distribution BP-2)
Relocate 3” gas main out of McCracken tunnel south of Scott Lab west along 18th Ave to Neil Ave
Relocate 3” gas main out of tunnel east of Math Tower and Dulles Hall from 18th Ave to 17th Ave.
Relocate 3” gas main outside of tunnel south of Derby Hall and tie-in inside Hopkins Hall
Encase existing gas line through tunnel at southeast corner of Physics Research Building
| 05/10/2016 07:00 PM UTC |
|
OSU-140014 Cancer Tower Retail Pharmacy
This project will construct a retail pharmacy in the new Cancer and Critical Care Tower.
| 05/05/2016 05:00 PM UTC |
|
OSU-108006 Hot Water Pipe Upgrades BP2
Installation of 16 domestic water systems (3 heating water, 9 electric, 4 natural gas) to facilitate the decentralization of 21 buildings from the campus domestic hot water system loop from McCracken.
Alternate 1 deletes 4 electric systems, adds 1 heating water system and includes extensive tunnel work.
Alternate 2 deletes 1 electric system, adds 1 heating water system.
Alternate 3 deletes 1 electric system, adds 1 heating water system
| 05/03/2016 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.