The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-160938 Vet Med Surgical Suite Renovation
This project will renovate surgery and IT facilities to accommodate expansion.
| 11/28/2016 04:00 PM UTC |
|
OSU-160422 UH East – Elevator 10-11 Modernization
This project will modify the two elevators.
| 11/22/2016 07:00 PM UTC |
|
OSU-160298 Fawcett Center - Lobby Cafe
Renovation of the Fawcett Center lobby for the construction of a new café and seating area.
| 10/31/2016 06:00 PM UTC |
|
OSU-160240 Building Identification Sign Replacement
Building Identification Sign Replacement
Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents.
Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass.
Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape.
An alternate for (2) Sign Type 41 monument signs.
Installation of temporary signs (purchased by allowance through the Owner) while signs are being refurbished. Removal of temporary signs after refurbished signs are installed.
| 10/19/2016 06:30 PM UTC |
|
OSU-150012 Elevator Safety Repair and Replacements
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
| 10/06/2016 05:00 PM UTC |
|
OSU-130636 Dodd Hall Secure Care System
This project will remove the existing and install a new secure care system on all floors. Dodd Hall Columbus, OH
| 09/21/2016 05:30 PM UTC |
|
OSU-160633, Taylor Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water heaters and 2 heating water boilers on the 13th and 14th Floors of Taylor Tower. The work also includes replacement of 2 domestic water storage tanks and 6 heating water expansion tanks. The work will be done in 4 phases for minimum impact to building operation. The University will pre-purchase 3 heating water boilers and 2 domestic water boilers to be installed by the Contractor.
| 09/20/2016 06:00 PM UTC |
|
OSU-130331 University Hospitals Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions. University East 181 Taylor Ave Columbus, OH 43203
| 09/08/2016 06:00 PM UTC |
|
OSU-130635 North High Street Landscape BP 2 (Ohio Field Signage)
To provide historical interpretive signage for the portion of campus west of High Street between Woodruff Street and 17th Ave.
| 09/08/2016 04:00 PM UTC |
|
OSU-150194 Lincoln - Suite 220 Renovation
** This project has been cancelled until further notice.
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
| 08/15/2016 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.