The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-108006 Hot Water Pipe Upgrades (REBID)
Installation of 12 domestic water systems (3 heating water, 5 electric, 4 natural as) to facilitate the decentralization of 17 buildings from the campus domestic hot water system loop from McCracken.
Alternate 1, adds 1 heating water system and includes extensive tunnel work
Alternate 2 add 4 electric system
| 06/06/2016 06:00 PM UTC |
|
OSU-160070 FAWCETT CENTER - BALLROOM CEILING AND LIGHTING
Renovation of the Fawcett Center Ballroom ceiling and lighting.
| 06/01/2016 06:00 PM UTC |
|
OSU-150017 Electrical Infrastructure Improvements
This project will install 3 transformers and 3 primary switches at various locations on main campus and paint and repair the concrete at the OSU substation
| 05/24/2016 05:00 PM UTC |
|
OSU-150009 Roof Repair and Replacement
Roof Repair and Replacement
Agricultural Engineering Building
Maintenance Building
| 05/20/2016 05:30 PM UTC |
|
OSU-138009 Steam and Condensate Systems Upgrades Phase 3 BP2 (South Neil Tunnel)
This project performs structural repairs, replaces condensate piping, and completes other utility improvements to the South Neil Avenue tunnel from south of 17th Avenue to just south of 12th Avenue westbound in the base bid.
| 05/19/2016 05:00 PM UTC |
|
OSU-150345 Harding Hospital - Elevator Controls
This project will upgrade the elevator controls.
| 05/16/2016 05:30 PM UTC |
|
OSU-081058 Water and Natural Gas Distribution System Upgrades (Natural Gas Distribution BP-2)
Relocate 3” gas main out of McCracken tunnel south of Scott Lab west along 18th Ave to Neil Ave
Relocate 3” gas main out of tunnel east of Math Tower and Dulles Hall from 18th Ave to 17th Ave.
Relocate 3” gas main outside of tunnel south of Derby Hall and tie-in inside Hopkins Hall
Encase existing gas line through tunnel at southeast corner of Physics Research Building
| 05/10/2016 07:00 PM UTC |
|
OSU-140014 Cancer Tower Retail Pharmacy
This project will construct a retail pharmacy in the new Cancer and Critical Care Tower.
| 05/05/2016 05:00 PM UTC |
|
OSU-108006 Hot Water Pipe Upgrades BP2
Installation of 16 domestic water systems (3 heating water, 9 electric, 4 natural gas) to facilitate the decentralization of 21 buildings from the campus domestic hot water system loop from McCracken.
Alternate 1 deletes 4 electric systems, adds 1 heating water system and includes extensive tunnel work.
Alternate 2 deletes 1 electric system, adds 1 heating water system.
Alternate 3 deletes 1 electric system, adds 1 heating water system
| 05/03/2016 07:00 PM UTC |
|
OSU-150728, Houck House - Roof Replacement
This project will replace the roofing system at Houck House on the Columbus Campus.
| 04/22/2016 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.