General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-081056 South Campus Sewer Separation and Site Improvements REBID
REBID - construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
01/13/2016 06:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
12/10/2015 07:00 PM UTC
OSU-081049 Selected Tunnel Replacement Projects - BP2
This project will replace tunnel sections in order of priority as shown below. Phasing of each construction segment will be determined during the design stage. T-1 Beneath College Road between Page Hall and Hagerty Hall
12/04/2015 07:00 PM UTC
OSU-130331 University Hospitals East - Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions.
12/04/2015 06:30 PM UTC
TEST
This is a test.
12/02/2015 07:45 PM UTC
OSU-100652 Various Building Demolitions Phase 2
Demolition of up to five (05) buildings noted as KRC A, B, C, D, and E located at The Ohio State University Campus in Columbus, Ohio. Work includes abatement; complete removal of all foundations, footings, etc.; proper back-fill and compaction; adjustments to site lighting and site utilities; site grading and repair.
11/19/2015 03:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
11/12/2015 07:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements
This is a continuation of the project approved in the 2007-2008 Capital Plan Process. The first phase is complete. The second phase will perform design and construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
11/03/2015 07:00 PM UTC
OSU-150330 Hitchcock HVAC Repair and Replacements
This project will repair the HVAC in Hitchcock Hall
10/28/2015 02:30 PM UTC
OSU-150179 Pomerene - Relocate District 2 Shop
This project will relocate the district shop from the building to enable the Pomerene/Oxley renovation project. The shop will be relocated to the basement of Aronoff and the first floor of the Biological Sciences Building.
10/23/2015 02:00 PM UTC
581 - 590 of 593 Solicitations
1 2 52 53 54 55 56 57 59