City of San Rafael- Department of Public Works
111 Morphew Street, San Rafael, CA 94901
(415) 458-5326
111 Morphew Street, San Rafael, CA 94901
(415) 458-5326
Name * | Description | |
---|---|---|
How To Bid Using Bid Express.pdf (306 KB) |
Guide for vendors/contractors using Bid Express for the first time
| |
Number | Deadline |
---|---|
Rotary Manor Culvert Replacement
The City of San Rafael is inviting bids for its Rotary Manor Culvert Replacement project. The project is located at 1821 Fifth Ave in San Rafael and consists of replacement of an arch corrugated metal pipe culvert with a cast-in-place concrete box culvert and rehabilitation of the affected property grounds.
Engineer Estimate: $600k
| 06/22/2023 06:00 PM UTC |
Number | Deadline |
---|---|
South San Rafael Hill Fuels Project
The City of San Rafael hereby requests proposals for Professional Services for the City’s South San Rafael Hill Fuels Project
The City of San Rafael, through its Fire Department (“City”), is soliciting proposals from qualified and licensed tree service and forestry contractors that are duly registered and licensed with either a C61-D49 or C27-D49 license in the State of California, to provide fuel reduction and vegetation clearance services within predefined areas of San Rafael including City of San Rafael Owned open space and land owned by the Elk’s Club.
| 06/08/2022 08:00 PM UTC |
City of San Rafael 2021/22 Slurry Seal Project
The Project is located in the City of San Rafael and is described as follows: the removal of existing striping, the placement of crack seal and slurry seal on various roads, and installation of new striping.
The estimated construction cost is $1,200,000
The Project must be fully completed within 30 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about July 2022, but the anticipated start date is provided solely for convenience and is neither certain nor binding.
CITY PROJECT NO. 11410
CITY FILE NO. 16.06.96
| 05/19/2022 06:00 PM UTC |
Stagecoach Road Defensible Space Fuel Reduction
The City of San Rafael (City) hereby requests proposals for fuel reduction services in two project areas: Stagecoach Road and Manuel T. Freitas. This work is intended to mitigate hazards in open space areas by significantly reducing vegetation that fuels wildfires and the subsequent soil erosion and run-off of burned areas.
| 04/25/2022 08:00 PM UTC |
City Hall Tenant Improvement Garden Level
The intent of this tenant improvement project is to repurpose the first floor of the San Rafael City Hall building to accommodate a variety of government service uses. The previous use for this floor was a City police department. The space is no longer occupied for that purpose. The project will also provide public interface at one of its two entries at the west end of the floor, where a secure entry foyer will be created with access to two service windows.
Note that the floors above the first floor must remain in continuous fully functioning operation during demolition and construction at the first floor. The floors above have access and egress that is separate from the first floor space. A mandatory walk-through of the building with City staff is required as part of the bidding process in order to understand and determine how this continuous operation will be provided.
The public access entry foyer will be converted to a one-hour fire rated space to reflect current code requirements. This will require treatment as shown in the documents at the ceiling, as well as the walls and doors. The new and existing walls and doors in this entry foyer will also be constructed to provide bullet-proof safety characteristics as defined in the drawings and specifications. As will the two service windows. The elevator entry will be provided with a new elevator smoke curtain, as specified in the documents.
A continuous new hallway between the entry foyer and a one-hour vestibule at the east end of the building will be provided by adding full height walls at selected locations. The one-hour vestibule will also require treatment as shown in the documents at the walls, ceilings and doors to provide the required rating. Note that this one-hour vestibule and the hallway do not require bullet-proofing treatment.
Other scope-of-work elements to be aware of:
Selective demolition needed to prepare the floor for new work.
Design/Build Mechanical, Electrical and Signal work to meet the needs of the City, and satisfy Fire and Life Safety code requirements are part of the scope of work.
An add-alternate is included in the documents for the build-out of the break room space. This add alternate also includes new water, drain and venting work.
No work is contemplated in the existing locker/toilet room spaces, except as required to coordinate mechanical, electrical and signal work in these spaces with new work elsewhere on the floor.
| 04/21/2022 09:00 PM UTC |
Third Street Safety Improvements Project - HSIPL 5032(043)
Third Street Safety Improvements Project - HSIPL 5043(043)
The Project is located on Third Street from Grand Avenue to Lootens Place, and is described as follows: demolition, installation of sidewalk, curb and gutter, curb ramps, drainage improvements, traffic signals and fiber optic conduit, pull boxes, cables and other associated materials and work. This project will also include the modification of several traffic signals, the replacement of street lights, and striping improvements.
Engineers Estimate $2,500,000
Completion of Work in 120 Working Days
DBE Goal 13%
| 03/29/2022 06:00 PM UTC |
Request for Proposal Goat Grazing Services
The City of San Rafael (City) hereby requests proposals for professional goat grazing services for our open space regions within the City for the 2022 vegetation management season. This work is intended to mitigate hazards in open space areas by significantly reducing vegetation that fuels wildfires and the subsequent soil erosion and run-off of burned areas.
Professionals shall be duly registered and licensed for their discipline within the State of California. Work will include: engineering review and support for land development, mainly private development projects, subdivisions (lot line adjustments, major and minor) and site plans (residential, commercial, industrial and mixed use). This may include review of application documents, technical reports, plans and maps, provide written staff reports, attendance at public hearings, meetings with applicants, collaboration with various City departments, the public and stakeholders, scheduling, inspection, and recordkeeping.
| 03/07/2022 03:00 PM UTC |
20 Meyer Rd. Slide Repair
The project is located along 20 Meyer Rd. and consists of the installation of a soldier pile retaining wall, guardrail, water lateral replacement, and hillside stabilization.
Engineer's Estimate: $145,000.00
Public Works is inviting you to a scheduled Zoom meeting.
Topic: 20 Meyer Rd. Slide Repair - Bid Opening
Time: Mar 2, 2022 01:30 PM Pacific Time (US and Canada)
Join Zoom Meeting
https://us06web.zoom.us/j/82743588274
Meeting ID: 827 4358 8274
One tap mobile
+16699006833,,82743588274# US (San Jose)
+12532158782,,82743588274# US (Tacoma)
Dial by your location
+1 669 900 6833 US (San Jose)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 929 205 6099 US (New York)
+1 301 715 8592 US (Washington DC)
+1 312 626 6799 US (Chicago)
Meeting ID: 827 4358 8274
Find your local number: https://us06web.zoom.us/u/kL33lZs0Y
| 03/02/2022 09:30 PM UTC |
Third Street Safety Improvements Project RFP for CM, Materials Testing, and Inspection
The City of San Rafael hereby requests proposals for Construction Management, Materials Testing, and Inspection for the City’s Third Street Safety Improvements Project.
| 02/03/2022 07:00 PM UTC |
ALBERT PARK PREFABRICATED ADA RESTROOM BUILDING INSTALLATION
The project includes the site preparation, installation of utilities, flatwork, and miscellaneous site features for the installation of a prefabricated restroom. The contractor will coordinate the installation with the prefabricated restroom manufacturer who will furnish the prefabricated restroom (already purchased by the City). The manufacturer will provide the crane for the installation, but the contractor will be responsible for all other details including traffic control, flagging, and site fixtures. Albert Park Field is located at 50 Albert Park Lane, San Rafael, CA 94901.
| 01/26/2022 07:00 PM UTC |
Vegetation Management - Roadside Clearance (San Rafael Fire Department)
The City of San Rafael, through its Fire Department (“City”), is soliciting proposals from qualified and licensed tree service contractors, that are duly registered and licensed with either a C61-D49 or C27-D49 license in the State of California, to provide large-scale roadway fuel reduction and vegetation clearance Roadside Clearance along City Maintained Roads services within City right of way in multiple neighborhoods The roadways are part of the Picnic Valley, Bayside Acres, Bret Harte, Country Club, Dominican, Mont Marin, Gerstle Park, California Park, Montecito, Rafael Meadows and Santa Venetia neighborhoods. The vegetation work will include work alongside and overhead of the roadway with a focus on limbing, thinning, and removing vegetation.
Proposals must be submitted via Bid Express. The City will not accept any hard copies of the RFP.
**For any questions or inquiries regarding this RFP, please use the Q&A field below or contact Vegetation Management Specialist, Calvin Schrader at (415) 485-3457.
| 01/20/2022 12:00 AM UTC |