General Info

Business Logo

City of Hilliard, Ohio

3800 Municipal Way, Hilliard, OH 43026
(614) 876-7361

As an important part of the growing Columbus Region, the City of Hilliard balances friendly, small-town living and big-city opportunities. With a population of nearly 38,000, Hilliard’s median household income is $97,485. There are approximately 1,100 companies in Hilliard that employ an estimated 17,000 people and contribute to more than one billion dollars in estimated annual sales.

Rated number one for job, population, wage and GDP growth in the Midwest, the Columbus Region offers access to a growing potential workforce of one million people and unique opportunities for any developing company. Hilliard is conveniently located along I-270 with easy access to I-70 and I-71, and is only 20 miles to the John Glenn International Airport.

No matter the industry, developing in Hilliard promises strong economic value, a rich work life balance and — most of all — an excellent place to call home.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Old Hilliard Water Main Improvements (CIP W-49)
***NOTICE: Addendum No. 2 was issued on 10/3/2025*** ***NOTICE: Addendum No. 1 was issued on 9/26/2025*** This project consists of installation of 1191 LF of 8-inch and 83 LF of 6-inch ductile iron waterline, valves, hydrants and appurtenances. There are 7 commercial water services that will require reconnection. The project also includes pavement planing and resurfacing of Center, Grant, and Franklin Streets within the project limits. Bidders should note that the Bid Schedule contains numerous contingency quantities to replace any lead or galvanized services per City of Columbus Ordinance 1627-2024, which established their Lead Service Line Replacement Program. See plan notes on sheet 3 for additional information. The Engineer's Estimate for this project is $757,500. No bid will be accepted if it exceeds the Engineer's Estimate by more than ten percent (10%). The Substantial Completion date for the waterline portion of the Project is May 25, 2026. The Final Completion date, which includes all street resurfacing and restoration, is June 26, 2026. This project is being funded through local funds. State prevailing wage applies to this project. There is no DBE goal. Please review the "Information for Bidders" in the Attachment List for additional information.
10/09/2025 06:00 PM UTC
Orangeberry Road Water Tower Painting Improvements (CIP W-20)
This project involves rehabilitation and painting of the 1 MG water tower located at 6445 Orangeberry Road in Hilliard, Ohio. Work includes abrasive blast cleaning and recoating of the entire exterior with full containment, the interior dry area, the interior wet area, various interior and exterior tank modifications, and other such work as may be necessary to complete the contract, as set forth in this Invitation for Bid. The Engineer's Estimate for the Project is $2,280,000. No bid will be accepted if it exceeds the Engineer's Estimate by more than ten percent (10%). The Final Completion date for the Project is November 15, 2026. This project is being funded through local funds. State prevailing wage applies to this project. There is no DBE goal. Please review the "Information for Bidders" in the Attachment List for additional information.
10/23/2025 06:00 PM UTC
Financial Application System RFQ#3700
The City of Hilliard invites your company to provide a proposal for the implementation of a comprehensive, turnkey, integrated Financial Application System (FAS). Vendors may propose all or part of full system solution either by offering all parts themselves or by subcontracting the modules or aspects they do not offer. The city will balance the functional fit of solutions offered with that of more complete solutions that reduce the ongoing burden of integration support. The city is open to considering solutions that are either fully On-Premises or fully SaaS Cloud-based but must integrate with our onsite systems and comply with our financial regulations.
11/05/2025 09:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
RFP - Recreation and Wellness Center Cafe/Juice Bar Operator
The City of Hilliard (the “City”) is in the process of building a new 110,558 square foot recreation and wellness center (“The Well”) anticipated to open in Summer 2025 located at 3993 Cosgray Road. This Request for Proposal is for the provision of café-type service at The Well. The City requests qualified companies to submit proposals and qualifications for consideration in the selection for a private entity to operate a 234 sq foot (13’ x 18’) café-style space that includes a grab and go refrigerated area, in the main entrance lobby of The Well, located adjacent to The Well front desk operations and the OSU Wexner Medical Center. Please see attached RFP and other documents below for additional information. Responses are due no later than 5 pm EST on September 11, 2023 and may be submitted via bid express or via email to Ed C. Merritt, III at emerritt@hilliardohio.gov and Erin Duffee at eduffee@hilliardohio.gov.
09/11/2023 09:00 PM UTC
2023 Hilliard Trail Maintenance Program (CIP T-161)
2023 Hilliard Trail Maintenance Program (CIP-T-161) consists of reconstructing existing trails along with performing preventative maintenance consisting of crack sealing, sealcoating, and spot pavement repairs. The Engineer's Estimate for this Bid is $190,000.00. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). The Final Completion Date is May 15, 2024. Please review the "Information for Bidders" in the Attachment List for additional information.
08/11/2023 07:00 PM UTC
Downtown Hilliard Infrastructure Improvements (T-157/T-133/T-121) - REBID
The Downtown Hilliard Infrastructure Improvements consists of the following projects: 1. Center Street Modifications (T-157) and Main Street Resurfacing (T-121) - See Plan #P01006 This project includes pavement correction of Center St and Main St intersection to fix existing drainage issues. Project also includes the installation of a median island on Center St in order to fully close Center St between Main St and Wayne St along with curb ramps and crosswalk improvements. Project includes resurfacing of Main St for approximately 0.45 Miles. Items 1-71 in the Bid Schedule relate to the Center/Main St Improvements. 2. Wayne Street Sidewalk (T-133) - See Plan #P01009 This project consists of adding a 5' sidewalk along the Northwest side of Wayne St between Madison Street and Franklin Street. Items 72-93 in the Bid Schedule relate to the Wayne Street Sidewalk Project. The Engineer's Estimate for this Bid is $750,000. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). On Page 12 of the Center Street Modifications and Main Street Resurfacing Plan #P01006, the allowable closure will be changed to a maximum of 14 calendar days. All work at the intersection of Center Street and Main Street must be complete and back to intermediate course by May 24, 2024. For the balance of work related to this project, no work can be conducted on Thursdays after Memorial Day, July 3-5, 2024, or the week of the Franklin County Fair. The Final Completion Date is August 2, 2024. CAD basemap files are provided in the attachment list to assist in preparation of bids. This project is being funded through local funds. State prevailing wage applies to this project. There is no DBE goal. Please review the "Information for Bidders" in the Attachment List for additional information.
07/27/2023 07:00 PM UTC
Downtown Hilliard Infrastructure Improvements (T-157/T-133/T-121)
**NOTICE: Addendum No. 01 was issued on 6/16/2023** The Downtown Hilliard Infrastructure Improvements consists of the following projects: 1. Center Street Modifications (T-157) and Main Street Resurfacing (T-121) - See Plan #P01006 This project includes pavement correction of Center St and Main St intersection to fix existing drainage issues. Project also includes the installation of a median island on Center St in order to fully close Center St between Main St and Wayne St along with curb ramps and crosswalk improvements. Project includes resurfacing of Main St for approximately 0.45 Miles. Items 1-71 in the Bid Schedule relate to the Center/Main St Improvements. 2. Wayne Street Sidewalk (T-133) - See Plan #P01009 This project consists of adding a 5' sidewalk along the Northwest side of Wayne St between Madison Street and Franklin Street. Items 72-93 in the Bid Schedule relate to the Wayne Street Sidewalk Project. The Engineer's Estimate for this Bid is $740,000. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). The Final Completion Date is May 10, 2024. CAD basemap files are provided in the attachment list to assist in preparation of bids. This project is being funded through local funds. State prevailing wage applies to this project. There is no DBE goal. Please review the "Information for Bidders" in the Attachment List for additional information.
06/22/2023 07:00 PM UTC
2023 Sanitary Sewer Cleaning and CCTV Program, Part 1 (CIP S-33)
**Notice: Addendum No. 1 was issued on 6/8/2023. ** The 2023 Sanitary Sewer Cleaning and CCTV Program, Part 1 (CIP S-33) (the “Project”) consists of a Base Bid for cleaning and televising 39,659 LF of sanitary sewer in the City of Hilliard, Ohio ranging from 8-inch to 15-inch diameter. Sanitary sewers are located within public right of way and backyard easements. Heavy cleaning may be required in approximately 20-percent of the sewers. Traffic control may be required to perform work in some areas. In addition, heavy cleaning and televising of 512 LF of 24-inch diameter storm sewer is included in the Base Bid. The storm sewer is located in a wooded area that can be accessed through an abutting apartment complex parking lot. Alternative Bid items for the cleaning and televising of 9,965 LF of 8-inch diameter sanitary sewer will be included in bid. The project will be awarded on the Base Bid amount. The Engineer's Estimate for the Base Bid is $164,413.00. No bid will be accepted if it exceeds the City Engineer’s estimate on the Base Bid by more than ten percent (10%). THIS PROJECT IS EXEMPT FROM PREVAILING WAGE REQUIREMENTS. The Substantial Completion Date is October 20, 2023. The Final Completion Date is December 1, 2023. Please review the "Information for Bidders" in the Attachment List for additional information.
06/13/2023 06:00 PM UTC
Cosgray Road Extension (CIP RP-7/T-86)
**NOTICE: Addendum No. 02 was issued on 6/2/2023** **NOTICE: Addendum No. 01 was issued on 5/23/2023** This project consists of 0.75 miles of new roadway from Alton & Darby Creek Road (CR-272) to the intersection of Cosgray Road (CR-39) and Scioto Darby Creek Road (CR-29) in Hilliard, Ohio. Improvements include two single lane roundabouts, one multi-lane roundabout, multi-use paths, street lighting, fiber conduit, signing, pavement marking, drainage improvements, waterline, and landscaping. The Engineer's Estimate for the Bid is $12,455,000. No bid will be accepted if it exceeds the Engineer’s Estimate by more than ten percent (10%). Contract Award is anticipated by the end of July 2023. Final Completion Date for the Project is October 31, 2024. Bidders shall carefully review the MOT requirements, including phasing and timing of allowable street closures and disincentive assessments for exceeding allowable closure limits. Plan are currently being routed for all signatures. Fully signed plans will be issued upon award of the project. CAD basemap files are provided in the attachment list to assist in preparation of bids. This project is being funded through a combination of local funds and OPWC funds. State prevailing wage applies to this project. There is no DBE goal. Bidders are required to review and certify the OPWC Proposal Notes in the attachment list. This project is located within the Big Darby Watershed and all erosion & sediment control during construction shall be strictly enforced. The successful bidder shall comply with the Storm Water Pollution Prevention Plan (SWPPP), which is provided in the attachment list below. The City of Hilliard is in the process of obtaining several permits. The special specifications provide details on these permits and contractor requirements. Please review the "Information for Bidders" and "Special Specifications" in the Attachment List for additional information.
06/08/2023 07:00 PM UTC
2023 Hilliard Sidewalk Maintenance Program (CIP T-160)
The 2023 Hilliard Sidewalk Maintenance Program consists of the removal and replacement of various sidewalk panels to meet ADA requirements and City Code. The Engineer's Estimate for this Bid is $475,450.00. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). The Final Completion Date is September 30, 2023. Please review the "Information for Bidders" in the Attachment List for additional information.
04/13/2023 07:00 PM UTC
2023 Hilliard Street Maintenance & Rehabilitation Program (CIP T-121)
**NOTICE: Addendum No. 2 was issued on 3/31/2023** **NOTICE: Addendum No. 1 was issued on 3/27/2023** The 2023 City of Hilliard Street Maintenance & Rehabilitation Program (SMRP) consists of mill and asphalt concrete overlay, microsurfacing, cape seal, crack sealing, pavement repairs (partial and full depth), pavement marking, curb and gutter repair, sidewalk repair, and ADA-compliant curb ramps. A Location Map is provided showing the location and scope of work. Items 1 - 59 in the Bid Schedule relate to the pavement maintenance work. Also included as part of this bid are modifications and maintenance/replacement work to two traffic signals on Avery Road. Work includes installation of ADA-compliant curb ramps, pedestals, and pushbuttons; replacement of school zone flashers; pavement marking; and other traffic signal maintenance items as provided in the plans entitled "Avery Road Traffic Signal ADA Modifications 2023". Items 60 - 114 in the Bid Schedule relate to the traffic signal work. The Engineer's Estimate for this combined bid is $2,278,000.00. No bid will be accepted if it exceeds the City Engineer’s estimate by more than ten percent (10%). The Substantial Completion Date for work located with a school zone is August 15, 2023. The Final Completion Date is October 15, 2023. Please review the "Information for Bidders" in the Attachment List for additional information.
04/06/2023 07:00 PM UTC
Clover Groff Run Stream Restoration, Phase 2 (CIP ST-38)
** NOTICE: Addendum No. 2 was issued on 3/27/2023. ** **NOTICE: The deadline date for issuing a final addendum was changed to 3/28/2023** **NOTICE: The deadline date was changed to 3/31/2023** ** NOTICE: Addendum No. 1 was issued on 3/22/2023. ** The project is located in and adjacent to Roger A. Reynolds Municipal Park, 3800 Veterans Memorial Drive, situated southwest of Scioto Darby Road and east of Alton Darby Road. The project is located within a Priority Stream Restoration Zone identified by the Big Darby Accord Watershed Master Plan. The project will employ a Natural Channel Design (NCD) approach to restore approximately 2,840 linear feet of channel. Of this total restoration reach, 2,440 linear feet will be completed using a Clean Ohio grant administered by the Ohio Public Works Commission (OPWC) and a City of Hilliard match. An additional 400 linear feet will be completed as part of the City's Small MS4 NPDES permit requirements using only City funds. The existing linear, overwide channel will be abandoned and a new channel will be constructed within a 150-feet wide excavated floodplain corridor. A cobble/gravel substrate and riffle/run/pool/glide sequence will be implemented to substantially improve instream habitat. The restored channel and a 150-feet wide floodplain will be constructed within an average 335-feet wide riparian corridor planted with robust native riparian species. Floodplain wetlands will be created within the riparian buffer to further improve water quality and provide habitat for native biota. The wetland areas will be planted with a diverse mix of native hydrophytes. The Engineer's Estimate for this Bid is $1,610,249.00. No bid will be accepted if it exceeds the City Engineer’s estimate by more than ten percent (10%). The Substantial Completion Date is January 19, 2024. The Final Completion Date is May 31, 2024. Please review the "Information for Bidders" and the "OPWC Bid Requirements" in the Attachment List for additional information.
03/31/2023 06:00 PM UTC
RFP Concession Services for the Hilliard Family Aquatic Center and Clyde "Butch" Seidle Community Pool
The City of Hilliard’s Recreation and Parks Department is requesting proposals from qualified companies or individuals to provide concession services for the City’s Hilliard Family Aquatic Center and Clyde “Butch” Seidle Community Pool. Please see attached RFP document for additional information regarding submittal requirements, objectives, and deliverables. Completed proposals are due by 5:00 Friday, March 24, 2023. Proposals may be submitted via the BidExpress website or by hard copy or email to: Anastasia Bradley Aquatics Recreation Supervisor Hilliard Recreation & Parks Department 3800 Veterans Memorial Dr. Hilliard, OH 43026 abradley@hilliardohio.gov
03/24/2023 09:00 PM UTC