General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-20-2
Goldenwood Drive Drainage--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools,testing, and materials necessary to improve drainage by cleaning and installing CIPP liner in the drain pipe as specified along Goldenwood Dr (R08M061), located in Slidell, LA.
05/05/2026 07:00 PM UTC
26-24-2
2026 Official Journal---------------------The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
05/12/2026 07:00 PM UTC
26-26-2
700 Gallon Trailer Mounted Jet Rodder-------------------The Parish is seeking bids to procure a 700-Gallon Trailer-Mounted Jet Rodder. Vendor shall provide all labor, materials, and equipment necessary to provide and deliver a 700-gallon trailer-mounted jet rodder. This equipment shall be new. Prior approved Make: Pipe Hunter and Model: 7724 or equivalent.
05/12/2026 07:00 PM UTC
26-23-2
Casril Drive Drainage Improvements--------------------------------------This project includes the construction of subsurface drainage, open ditches, cleaning of box culverts, concrete and asphalt drives, asphalt mill and overlay, signage and striping, and traffic calming speed tables, as specified along Casril Dr. between Hwy 59 and Soell Dr., located in Mandeville, LA.
05/14/2026 07:00 PM UTC
26-10-1
Camp Salmen Nature Park Playground----------------St. Tammany Parish Government is requesting a Contractor to provide all labor, materials, and equipment to install approximately 5,651 square feet of turf over existing poured-in-place surfacing, as well as install 1,536 square feet of new turf and padding over a stone base. The Contractor shall also provide and install a 60’LX50’WX12’H Eave Hip Shade structure to cover the playground area, and install a 3 bay 8’ swing frame with shade and swing set belt seats or comparable in the area with the new turf at the Camp Salmen Nature Park Playground, 35122 Parish Pkwy, Slidell, LA 70460.
05/14/2026 07:00 PM UTC
26-25-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings.
05/19/2026 07:00 PM UTC
26-27-2
St. Tammany Parish Library-Mandeville Branch Reno------------------------------------------St. Tammany Parish Government requires a contractor to perform renovations to the existing Mandeville Branch Library. The project includes improvements to both the exterior and interior of the facility as indicated in the bid documents. The work shall be broken out into a Base Bid and Alternates, as indicated in the drawings.
06/03/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
522-00-17-60-2
HVAC Controllers Upgrade
09/26/2017 07:00 PM UTC
314-00-17-58-2
2017 District 14 Road Improvements........This is a District Capital Road Improvement Project for Districts 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Browns Village Rd (R09I001) Section 27 Township 8S Range 14E; Fifth St (R09I018) Section 27 Township 8S Range 14E; Fifteenth St (R09I056) Section 27 Township 8S Range 14E; First St (R09I010) Section 27 Township 8S Range 14E; and Javery St (R09D038) Section 34 Township 8S Range 14E.
09/21/2017 07:00 PM UTC
311-00-17-54-2
Ranch Rd & Ranch Rd Drainage ----- This is a District Capital Road Improvement Project for Districts 11. The Contractor must provide all labor, equipment, tools, testing, and materials necessary to improve the road by reconstructing the road surface. The work will also include the removal/replacement of drain pipes, cleaning/shaping/grading ditches, installing pipe headwalls, maintenance aggregate, topsoil, and hydro-seeding, as specified, along Ranch Rd (R09E050) Section 39 Township 9S Range 13E, Slidell, LA.
09/19/2017 07:00 PM UTC
321-00-17-55-2
Building B Buildout - Public Works...Portions of the third floor of Koop Drive, Building B shall have carpet tiles and linear base installed per the manufacturer’s specifications. All materials and demolition, surface preparation and installation work shall be included.
09/14/2017 07:00 PM UTC
015-05-17-65-2
Road Signs
09/14/2017 07:00 PM UTC
300-00-17-57-2
Dove Park Rd. Mill and Overlay -------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
09/12/2017 07:00 PM UTC
316-00-17-47-2
Lake Village Drainage Improvements/N. Pearl Dr Mill and Overlay..... A. Lake Village Drainage Improvements o Selective tree removal o Demolition and removal of existing catch basins and storm drains. o Installation of new junction boxes and catch basins. o Installation of approximately 2,000 linear feet of 60” RCP storm drain and miscellaneous storm drains ranging from 15” to 24” diameter. o Roadway repair, sidewalk construction, and driveway construction. o Grading, erosion and sediment control, traffic control, and vegetation establishment. B. North Pearl Mill and Overlay o 2” mill and overlay from Station 01+38 (Gause Boulevard) to Station 44+50 (Lake Erie Drive) as shown in the Plans. o Guardrail system at W-15 Canal crossing o Striping
09/07/2017 07:00 PM UTC
315-05-17-50-2
2017 Districts 6 & 5 Road Improvements.....This is a district capital road improvement project for Districts 6 & 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Firetower Rd (R06H001) Section 5 Township 7S Range 14E; St Amand St (R10C002) Section 19 Township 6S Range 12E; Sandy Ln (R04D057) Section 27 Township 7S Range 11E; and Harper Rd #2 (R06F005) Section 15 Township 7S Range 14E.
09/05/2017 07:00 PM UTC
311-00-17-52-2
2017 District 11 Road Improvements....This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Azalea Ln (R06L005) Section 33 Township 7S Range 13E ; Red Mill Rd (R07C042) Section 28 Township 8S Range 13E (Lacombe, La.).
09/05/2017 07:00 PM UTC
416-15-17-53-2
Lower W-15 Area Drainage Improvements...............................The completed Work will provide Owner with a regional stormwater detention pond known as the Tenet Pond. Additional details describing the work are provided in Section 01 11 00 of Division 01, Technical Specifications.
08/31/2017 07:00 PM UTC
661 - 670 of 960 Solicitations
1 2 63 64 65 67 69 70 71 95 96