St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of
subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
| 11/18/2025 08:00 PM UTC |
|
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the
specifications.
| 11/19/2025 08:00 PM UTC |
|
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
| 11/20/2025 08:00 PM UTC |
|
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
| 11/20/2025 08:00 PM UTC |
|
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
| 11/20/2025 08:00 PM UTC |
|
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
| 11/25/2025 08:00 PM UTC |
|
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
| 12/03/2025 08:00 PM UTC |
|
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
| 12/03/2025 08:00 PM UTC |
|
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
| 12/03/2025 08:00 PM UTC |
|
25-65-1
Traffic Calming Program Military Rd PH. 1--------------------------------
The Parish requests a contractor to implement traffic calming improvements by installing asphaltic
concrete speed tables, updating related pavement markings and signage within the Cross Gates
Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and
improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars,
with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River,
LA.
| 12/04/2025 08:00 PM UTC |
|
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
| 12/09/2025 08:00 PM UTC |
|
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
| 12/11/2025 08:00 PM UTC |
|
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
| 12/11/2025 08:00 PM UTC |
|
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
| 12/11/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
| 04/12/2017 07:00 PM UTC |
|
304-00-17-19-2
2017 District 1&4 Road Improvements................This is a District Capital Road Improvement project for Districts 1 & 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and/or milling and overlaying roads as specified along Oak Park Dr. (R01I004) Section 16 Township 8S Range 10E; Perrilloux Rd (R01I001) Section 16 Township 7S Range 10E; Wager Cemetery Rd (R01I002) Section 9 Township 7S Range 10E; Black River Dr. (R01J042) Section 42 Township 7S Range 10E.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 04/11/2017 07:00 PM UTC |
|
318-00-17-23-2
Fairgrounds Phase 3
| 04/11/2017 07:00 PM UTC |
|
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
| 04/07/2017 07:00 PM UTC |
|
303-00-17-10-2
2017 District 3 Road Improvements ------
This is a District Capital Road Improvement Project for District 3. The work
specified in this project will require the Contractor to provide all labor, equipment,
tools, and materials necessary to improve road surfaces by reconstructing them as
specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E;
Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow
(R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031)
Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4
Township 7S Range 10E.
| 04/04/2017 07:00 PM UTC |
|
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E .
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
| 04/04/2017 07:00 PM UTC |
|
015-05-17-17-2
Road Signs
| 03/23/2017 07:00 PM UTC |
|
015-60-17-16-2
Windshield Repair/ Replacement
| 03/23/2017 07:00 PM UTC |
|
316-00-17-11-2
Cross Gates Pond Improvements.................................
This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
| 03/21/2017 07:00 PM UTC |
|
306-00-17-09-2
2017 District 6 Road Improvements.....................................
This is a District Capital Road Improvement Project for District 6. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Becky Lake Dr (R06C010) Section 40 Township 6S Range 14E; Chat Ct (R05B044) Section 27 Township 5S Range 12E; Dolph Gaines (R06E009) Section 27 Township 7E Range 14E; Marcus Rd (R05G026) Section 33 Township 4S Range 13E; O Wager Rd (R10B017) Section 10 Township 6S Range 12E; S Davis Rd (R10B016) Section 10 Township 6S Range 12E; Tot Polk Rd (R06I013) Section 39 Township 6S Range 14E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E; and Wilson Ln (R06I012) Section 38 Township 6S Range 14E.
| 03/15/2017 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.