General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
26-20-1
Lafitte St Drainage---------------------------------------The Parish requests a Contractor to improve drainage by removing and replacing the existing structure(s), subsurface drainage pipe, catch basin, sod, concrete driveways, and driveway aprons as specified along Lafitte St (R04D050) located in Mandeville, LA.
07/16/2026 07:00 PM UTC
26-19-1
Traffic Calming Program - Red Gap & Northern Homes------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to implement traffic calming solutions by way of asphaltic concrete speed tables, in addition to striping and respective speed table striping in on several residential streets in Red Gap & Northern Homes Subdivisions, Mandeville, La. This work, as specified in these documents and construction plans, is located along Soell Dr (R03L011), Hunt Dr (R03L012), Parker Dr (R03L014), Mire Dr (R03L016), 11th Ave (R03L013), Helenbirg Rd (R03L001), 6th Ave (R03L005), Lincoln St (R03L025), and North St (R03L026) Sections 11-14, Township 7S Range 11E.
07/16/2026 07:00 PM UTC
26-21-1
Lacombe Turning Radii Improvements___ The Parish requests a contractor to improve turning radii by installing drain pipes, catch basins, patching and shoulder materials as specified along Charlotte St (R07E044) Lacombe ; N. 25th St (R07E030) Lacombe ; Cloverland Dr (R07E040) Lacombe ; N. 8th St (R07E002) Lacombe, Louisiana.
07/16/2026 07:00 PM UTC
26-35-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings
07/28/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
015-60-17-81-2
Windshield Repair and Replacement
01/11/2018 08:00 PM UTC
015-10-17-80-2
Striping
01/11/2018 08:00 PM UTC
015-25-17-78-2
Road Materials
01/11/2018 05:00 PM UTC
015-45-17-77-2
Plastic Culvert Pipe
01/11/2018 08:00 AM UTC
622-95-17-61-2
Bedico - Timberlane Interconnection....Installation of approximately 9,500 linear feet of 12-inch PVC and HDPE water main via open cut, directional drilling and jack and bore including tie ins, valves, fire hydrants, sampling stations and other ancilliary work in accordance with the drawings and specifications prepared by Professional Engineering Consultants Corporation dated June 6, 2017 and June 2017, respectively.
12/19/2017 08:00 PM UTC
419 -02-17-66-2
FEMA Disaster 4263 - Floor Repair.......................The Contractor must provide all labor, equipment, tools, and materials necessary for embankment repair, riprap installation, cross drain replacement, and pavement patching, in accordance with the specifications.
11/07/2017 08:00 PM UTC
321-00-17-68-2
Building B Buildout - Public Works Office Partition Panels......Permanent, hard-surface, non-powered office partition panels shall be furnished and installed, per the manufacturer’s specifications, to sub-divide large rooms into work stations on the 3rd floor of Building B at the St. Tammany Parish Government Administrative Complex (Koop Campus). All partition panels, materials, equipment, labor, and supervision required to complete the work, per the specifications (Section 09), shall be included.
10/19/2017 07:00 PM UTC
330-00-17-67-2
Tammany Trace Crack Repair..... This is a 2017 Capital Improvement Project. The work specified in this project will require the contractor to provide all labor, equipment, and materials necessary to improve the Tammany Trace multi-use path surfaces by milling and overlaying of asphaltic concrete and removing and replacing pavement including saturated soils, as specified along the Tammany Trace (R11A001) Section 42 Township 6S Range 11E, Section 36 Township 6S Range 11E, and Section 31 Township 6S Range 12E.
10/10/2017 07:00 PM UTC
339-00-17-63-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
10/04/2017 07:00 PM UTC
310-00-17-59-2
Forest Ln & Forest Ln Drainage................................. This is a District Capital Road Improvement Project for District 10. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road by reconstructing road surface. Work also included will be removing/ replacing storm drain pipes, catch basin, brisk walkway, clearing and grubbing, adjust man hole, and remove/relocate mailboxes as specified along Forest Ln (R04D091) Section 40 Township 7S Range 11E.
09/27/2017 07:00 PM UTC
671 - 680 of 981 Solicitations
1 2 64 65 66 68 70 71 72 98 99