St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
| 10/07/2025 07:00 PM UTC |
25-51-1
Madewood Dr Drainage----The Parish requests a contractor to improve drainage by removing and replacing failed subsurface drainage, removing and replacing driveways, and installing new catch basins located on
Madewood Dr (R04D089); as specified, in Mandeville, Louisiana 70471.
| 10/07/2025 07:00 PM UTC |
Number | Deadline |
---|---|
015-80-16-60-2
Trace Bridge Repairs - The Contractor must provide all labor, materials, equipment and supervision necessary to remove and replace decayed timber piles, stringers, and bent caps. The work is to include all necessary cribbing, jacking and supports required to hold up deck and all galvanized connectors, as well as all hardware required to install materials. Timber is to be replaced.
| 12/09/2016 08:00 PM UTC |
314-00-16-55-2
Voters Rd. - Curve to Allen Rd. Mill and Overlay ----- This is a 2016 Capital Road Improvement Project for District 13 and District 14. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by milling and overlaying and improve drainage by installing subsurface drainage as specified along Voters Rd (R08V002) Section 24 Township 9S Range 14E.
| 10/18/2016 07:00 PM UTC |
015-45-16-58-2
2016 DPW Maintenance Overlays Phase 2
The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2 inch asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12 inch patching and 1.5 inches cold planing as specified. See specifications attached for: 9th Street (R04A038); 11th Street (R04A003); Brookside (R04D035); Cody Lane (R02O028); Fincher Road (R05E016); Green Court (R04E162); La Salle Street (R04D059); Le Cirque (R01J073); Meadow Court (R04E160); Nelson Road (R05F018); Passman Road (R03F031); Prairie Court (R04E164); Raehyo Lane (R03E013); Ridge Court (R04E163); Rue Mon Jardin (R01J070); St. Ann Street (R03J035); Trail Court (R04E159); Walker Street (R03J034); and Ward Road (R05E015).
| 10/18/2016 07:00 PM UTC |
312-00-16-56-2
2016 District 12 Road Improvements ----- This is a 2016 Capital Road Improvement Project for District 12. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with a 2” mill and overlaying, and removing and replacing concrete panels as specified along Behrman Street (R08U015) Section 23 Township 9S Range 14E ; and Bosworth Street (R08U020) Section 23 Township 9S Range 14E.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 09/28/2016 07:00 PM UTC |
015-35-16-54-2
2016 DPW Maintenance Overlays Phase 1
------
The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2” Asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12” patching and manhole adjustment, as specified. See specifications attached for Coci Road (R06E015); Dixie Road (R09I002); Donnis Drive (R09B007); Golden Lane (R08A006); Jefferson Street (R09D035); John Anthon Road (R06G022); Lynn Road (R09F007); Marina Lane (R09H042); Miller Creek Lane (R08I004); Neal Lane (R08K010); Pebblebrook Lane (R08I003); Shirmac Drive (R08N069); Sleepy Hollow Lane (R08I011); Sue Street (R09F006); Susan Lane (R08K009); and Third Street (R09I016).
The time period for completion of the project is 90 calendar days + calculated rain days.
The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 09/27/2016 07:00 PM UTC |
301-00-16-51-2
2016 District 10 Road Improvements.......This is a 2016 Capital Road Improvement Project for District 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with milling and overlaying, overlaying, and adding pavement striping along Coffee Street (R04D047) Section 39 Township 8 South Range 11 East; Dupard Street (R04D168) Section 39 Township 8 South Range 11 East; and Lafitte Street (R04D050) Section 39 Township 8 South Range 11 East.
| 09/23/2016 07:00 PM UTC |
324-00-16-52-2
Waste Water Treatment and Control - Public Works Wash Racks
| 09/20/2016 07:00 PM UTC |
313-00-16-50-2
2016 District 13 Road Improvements.........This is a 2016 Capital Road Improvement Project for District 13. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with asphalt overlays on Faciane Lane (R09H022) Section 38 Township 9S Range 14E ; Coin Du Lestin Dr. (R09H025) Section 38 Township 9S Range 14E.
| 09/13/2016 07:00 PM UTC |
403-15-16-45-2
STAC Phase 3 Drainage Detention Pond/ STEM Bldg.
The Parish requires a contractor to clear, excavate, and grade to construct a dry dentention pond. Work will also include construction of a maintainance road around the perimeter of the pond and construction of a temporary crossing at the linear detention pond. Hauling, placing, grading and compacting fill material for the future STEM building.
| 09/07/2016 07:00 PM UTC |
337-00-16-53-2
Justice Center Lighting Upgrade to LED-------------------------- The Parish extends this MATERIAL ONLY bid request to procure energy efficient LED lightbulbs and/or upgrade kits (products) for the Justice Center Lighting Upgrade to LED project.
Pricing shall include all shipping and delivery costs and must be valid through the term of the contract, which is valid until December 31, 2016. Defective products and products damaged during shipping and/or delivery shall be replaced at no additional cost to the Parish.
Products shall be delivered within forty-five (45) calendar days from the date a Purchase Order is issued by the Parish. A liquidated damages fee of five hundred ($500) dollars per day shall be in effect for products not delivered within the specified time frame. All product deliveries shall be made to the Facilities Management Office at the Justice Center located at 701 N. Columbia Street, Covington, La 70433.
The specifications in Attachment “A” are intended to be the minimum requirements of the products to be provided in the bid request. The specifications shall provide an equal to or greater than value.
Request for approval of an equivalent product must be submitted, with the alternative product specifications, catalog cuts, and descriptive literature, per the deadline date and time set forth in Section 1.3 Schedule of Events of this Bid Request. The Parish shall review the request, determine if the product qualifies as an “approved equivalent” and issue an addendum with the determination. It is the sole discretion of the Parish to make the determination if a product will be acceptable as an equivalent. Please send “approved equivalent” requests via email to purchasing@stpgov.org no later than 2:00 PM on August 23, 2016.
The name of any manufacturer mentioned in the specifications is for the purpose of establishing a minimum acceptable standard of quality desired by the Parish. On all items bid, the Respondent shall indicate clearly the product being bid and, where applicable, shall supply catalog cuts and descriptive literature with the original copy of the bid. All products bid must have prior approval as “approved equivalents”.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
A bid guarantee is not required for this project.
The Base Bid shall be the sum total of the unit prices for one (1) each of the specified products in Attachment “A,” which shall include all applicable costs.
| 09/01/2016 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.