General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
SB 1859 SB# 1859 Tract 4-B-1-A-2 of Kleinpeter, A., J.
The Recreation and Park Commission for the Parish of East Baton Rouge (BREC) will accept sealed bids for the sale of 8.86± acres of vacant land fronting Industriplex Blvd in Baton Rouge, not needed for public recreation purposes, described as Tract 4-B-1-A-2 of Kleinpeter, A., J., for the minimum price of $2,175,000 appraised value. Bid Opening Information: April 07, 2026 at 2:00PM CST BREC's Administrative Office 6201 Florida Blvd. Room 1515 Baton Rouge, LA 70806
04/07/2026 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
1626 - Capital Area Pathways Project – Pennington Trail Segment
Construction of a concrete pathway generally twelve feet wide following along the northern boundary of Dawson Creek and connecting to Quail Drive and Kenilworth Parkway at BREC’s Perkins Road Community Park including miscellaneous drainage items and appurtenances as required to complete the project as shown on the plans.
08/11/2015 07:00 PM UTC
1625 - OLYMPIA STADIUM RESTORATION PHASE 1
Repair of stadium concrete seating structure including removal of loose, broken, or weakened concrete, patching voids, repair and/or replacement of exposed rebar, addition of support structures in areas, repair of cracks and replacement of joint sealers.
08/10/2015 07:00 PM UTC
1622 - Anna T. Jordan Community Park Recreation Center Renovation
Architectural renovations and additions to a recreation center and gym building.
07/17/2015 07:00 PM UTC
1621 - Perkins Road Community Park Multi-Use Trail
Construct an approximately 2,200 linear foot concrete multi-use path, sub-surface drainage, and site furnishings. The 6” thick multi-use path varies from 7’ to 12’ in width.
06/22/2015 03:00 PM UTC
1620 - Anna T. Jordan Community Park Recreation Center Renovation
Architectural renovations and additions to a recreation center and gym building.
06/12/2015 07:00 PM UTC
1611 - ZACHARY COMMUNITY PARK – PLAY AREA
The play area for BREC’s existing Zachary Community Park will include: playground equipment, playground safety surfacing, concrete path paving, decorative paving, picnic shelter(s), grading, subsurface drainage, sitework, site furnishings, landscaping, irrigation, lighting, electrical work, and other miscellaneous site construction as detailed in the construction drawings & specifications.
05/12/2015 07:00 PM UTC
1618 - Burbank Soccer Complex Road Improvents
This project will consist of a 2” asphalt overlay over an existing limestone base. The asphalt overlay will be approximately 3,350’ long and 20’ wide. The project also includes 4 integral speed bumps and miscellaneous patch work to existing asphalt paving as shown on the plans. There is an add alternate that consists of adding 20’ long asphalt aprons to each parking lot ingress/egress.
05/12/2015 07:00 PM UTC
SB1619
Contract to furnish all equipment and supplies necessary to provide Annual Janitorial Services for BREC-Tennis Centers, Baton Rouge, LA, beginning June 1, 2015 through December 31, 2015.
05/12/2015 04:00 PM UTC
1616 - Knock Knock Children's Museum
Work of the Project includes construction of a 26,218 square foot, three story children’s museum building and associated site improvements.
03/24/2015 07:00 PM UTC
1615
Contract to furnish all equipment and supplies necessary to provide Annual Contract for Janitorial Services for the BREC Tennis Centers to Begin April 1, 2015 through December 31, 2015, for the following locations:
03/20/2015 04:00 PM UTC
201 - 210 of 303 Solicitations
1 2 17 18 19 21 23 24 25 30 31