General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
1597 - ANNUAL CONTRACT FOR READY MIX CONCRETE
ANNUAL CONTRACT – READY MIX CONCRETE as specified, to be furnished, delivered and poured at BREC Facilities in and throughout East Baton Rouge Parish, Louisiana. Contract Period is: Time of Award through September 30, 2015, with two (2) renewals allowed.
10/08/2014 03:30 PM UTC
1593 - Annual Contract for Grass Seed
GRASS SEED FOR GOLF COURSES, COHN ARBORETUM & ATHLETIC FIELDS Per Bid Specifications
08/05/2014 02:00 PM UTC
1592 - ANNUAL CONTRACT FOR
ANNUAL CONTRACT FOR DIRT, SAND, GRAVEL AND CLAY
07/18/2014 03:00 PM UTC
RFP 148 - Request for Proposal for Retirement Plan Analysis, Consulting and Related Services
The Recreation and Park Commission for the Parish of East Baton Rouge (BREC) is accepting proposals for Retirement Plan Analysis, Consulting and Related Services (RFP #148).
06/23/2014 03:00 PM UTC
RFP 149 - Request for Proposal for Third Party Administrator for Unemployment Compensation Cost Management Program 2014
The Recreation and Park Commission for the Parish of East Baton Rouge (BREC) is accepting proposals for Third Party Administrator for Unemployment Compensation Cost Management Program 2014 (RFP #149).
06/20/2014 08:00 PM UTC
RFP 147 - Request for Proposal for Armored Service for BREC's Baton Rouge Zoo
The Recreation and Park Commission for the Parish of East Baton Rouge (BREC) is accepting proposals for Armored Service for BREC’s Baton Rouge Zoo (RFP #147).
06/17/2014 03:00 PM UTC
Jefferson Highway Park Improvements- Rebid
Development of a ¾ acre site including: Grading, storm drainage, concrete paving, playground, lighting and landscaping.
06/16/2014 08:00 PM UTC
1589 - Downtown Greenway: Expressway Park - PHASE II
The project will consist of new pedestrian and cyclist paths construction in Expressway Park connecting the recently bid Greenway to two parking areas and other amenities in the park. Construction in addition to the pathway will include grading, drainage, miscellaneous concrete paving, sitework, parking lot striping, revegetation, and trailhead facilities including benches, accessible ramps and other miscellaneous site construction as detailed in the construction drawings & specifications.
05/06/2014 07:00 PM UTC
1588 - Jefferson Highway Park
Concrete Plaza, storm drainage, wood arbor and landscaping.
04/22/2014 08:00 PM UTC
SB 1587 - Webb Memorial Park Fitness Center Roof Repair
Furnishing of all materials, labor, tools, and other facilities necessary for performing all work related to the removal of existing clay tile roofing, existing roofing felt, replacement of any rotted wood sheathing and fascia. The replacement of existing copper flashing, counter-flashing, gutters, and downspouts with new 16-oz copper as deemed necessary to constitute a complete job in every respect. In addition, any clay tile missing or damaged is to be replaced with tile to match existing color, style, thickness, grade, pattern, etc., to the best possible match with available tiles, the reinstallation of clay tile over new waterproof membrane, and the installation of new copper standing seam roofing over a portion of the existing roof.
04/11/2014 04:00 PM UTC
221 - 230 of 300 Solicitations
1 2 19 20 21 23 25 26 27 28 29 30