General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
Sealed Bid# 1864 - Annual Contract for Event Inflatables, Rides, Entertainment, & Event Accessories
Annual Contract for Event Inflatables, Rides, Entertainment, & Event Accessories May 28, 2026 10:00 A.M. CT 6201 Florida Blvd Baton Rouge, LA 70806 Room 1501 - Conference Room
05/28/2026 03:00 PM UTC
SB 1863 SB 1863 LIBERTY LAGOON AQUATIC REPAIRS
SB 1863 LIBERTY LAGOON AQUATIC REPAIRS Project Description: Demolition and reconstruction of new Phase 1 pumps, variable frequency drivers, digital flowmeters, automation, remote controls, new regenerative media filtration, autofill devices, and jib cranes. Bid Opening information: June 2, 2026 at 2:00PM CT BREC's Administration Building 6201 Florida Blvd. Room: 1501 Baton Rouge, LA 70806 Non-Mandatory Pre-Bid: May 20, 2026 at 9:00AM CT 111 Lobdell Ave Baton Rouge, LA 70806
06/02/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
1539 - Demolition/Hazardous Materials Abatement of PAWNEE RECREATION CENTER
This Contract shall consist of the removal of previously determined asbestos containing building materials, removal of building contents, demolition of the building and other miscellaneous site construction as detailed in the construction drawings & specifications. The concrete slab under the gym floor is to remain. The concrete slab under the recreational building is to be removed as part of Alternates 1 and 2, if accepted by Owner; otherwise the concrete slab will remain. Areas adjacent to the concrete slab remaining will require and surrounding backfilling the lot, and seeding.
07/10/2012 07:00 PM UTC
1540 - Swimming Pool Construction BREC Howell and Brooks Parks
Reconstruction of two (2) swimming pools one at Brooks park and one at Howell Park, consisting of new gunite pool shell construction with new equipment and decking, partial backfill of existing pool, and renovations (plumbing and electrical) to bathhouses.
07/10/2012 03:00 PM UTC
1536 - Perkins Road Community Park - Parking Improvements
New parking lot including lighting and drainage improvements, and other miscellaneous site construction as detailed in the construction drawings & specifications.
06/19/2012 08:00 PM UTC
1534- Highland Road Community Park Pavilion
Open air Pavilion, Restrooms, Site work, Electrical, Masonry, etc...
06/19/2012 07:00 PM UTC
1535- Central Community Sports Park - Concession Building
CMU Concession Building, Restrooms, Masonry, Minor Site work, utility Tie-in, Concrete slab, etc...
06/19/2012 03:00 PM UTC
1533-Annual Contract for Limestone and Recycled Concrete
For Limestone and Recycled Concrete as Described in Specifications.
06/15/2012 03:00 PM UTC
1532 - Jefferson Terrace Neighborhood Park Improvements
This project includes the first phase of a 6’ wide concrete walking path, and a concrete perimeter and drainage for a playground. Playground equipment and safety surfacing installation will be performed by others. Site amenities include installation of benches and trash can holders. Add Alternates include additional walks and rehabilitating the existing asphalt parking lot.
05/14/2012 07:00 PM UTC
1530 - Perkins Road Community Park-Parking Improvements
1530 - Perkins Road Community Park-Parking Improvements: New parking lot including lighting and drainage improvements.
04/17/2012 07:00 PM UTC
1528 - Furnish And Install – Playground Equipment & Surfacing
Furnish and install playground equipment and engineered wood fiber as detailed in the construction drawings & specifications at three BREC parks in East Baton Rouge Parish Monte sano park 2727 greenwell street South magnolia park 2409 south magnolia Thirty-ninth street park 3451 thirty-ninth street
04/16/2012 07:00 PM UTC
1080-Convention Street Park
The new Convention Street Park will be a three-quarter acre urban park located in downtown Baton Rouge. The scope of work for this project will include concrete walkways, site furnishings, a custom steel and wood pergola, entry plazas with concrete unit pavers, custom signage, fencing, grading and drainage, an open lawn area, landscaping, tree planting, irrigation, concrete seating walls and retaining walls, decorative concrete treatments and an urban rain garden.
03/16/2012 07:00 PM UTC
291 - 300 of 306 Solicitations
1 2 23 24 25 26 27 28 30