General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
SB1556 - Webb Park Playground Improvements
The project consists of demolition and back fill of existing concrete public swimming pool, removal of existing playground equipment, and the demolition of other miscellaneous site features including concrete walks. Proposed features include the construction of a new playground with rubber and engineered wood fiber safety surfacing, park shelters, site furniture, ornamental and chain link fencing, seat walls, concrete and unit paving, earthen berms, other custom site features and landscaping.
01/15/2013 08:00 PM UTC
1552 - N. SHERWOOD FOREST PARK – BASKETBALL COURT
Site improvements for existing N. Sherwood Forest Community Park includes a post-tension basketball court, asphalt paved parking, grading, subsurface drainage, miscellaneous concrete & unit paver site paving, sitework, site furnishings, picnic shelter, fencing, landscaping and other miscellaneous site construction as detailed in the construction drawings & specifications.
12/04/2012 09:00 PM UTC
1551- Highland Road Community Park Pavilion
Pavilion is brick veneer structure on typical concrete slab with metal standing seam roof. Pavilion will have bathrooms and storage room. Approximately 3200 SF total under roof.
12/04/2012 08:00 PM UTC
1553 - Wards Creek Multi-Use Pathway Mall Of Louisiana To Siegen Lane Segment
This project consists of the construction of approximately 6,000 linear feet of 12 feet wide concrete pathway. The walkway will parallel Wards Creek from the Mall of Louisiana to the existing Siegen Lane Right of Way. Within these 6,000 feet two bridges will be constructed. One spanning Wards Creek and the other spanning a drainage tributary to Wards Creek.
12/04/2012 04:00 PM UTC
1550-WARDS CREEK MULTI-USE PATHWAY BLUEBONNET TO MALL OF LA SEGMENT
Construction of a concrete pathway, approximately 3400 linear feet, along the south bank of Wards Creek between Bluebonnet Blvd and Mall of Louisiana Blvd. The Work includes, site clearing, storm drainage, earthwork, stone riprap, concrete pavement, striping and traffic control devices, lawns and grasses, concrete retaining walls and site furnishings.
11/13/2012 08:00 PM UTC
#1549 - Magnolia Mound Visitor Center
One story building on typical concrete slab with glass and steel structure and a built up roof system. Total structure is approximately 4,400SF.
10/16/2012 07:00 PM UTC
1545-Annual Contract for Engineered Wood Fiber for Playground Surfacing
Annual Contract for Engineered Wood Fiber Playground Surfacing to be furnished and delivered to BREC Facilities in and throughout East Baton Rouge Parish
10/16/2012 03:00 PM UTC
1548 - Cedar Ridge Neighborhood Park Improvements
This project will include a new playground, concrete paths, and paving a portion of the existing gravel parking lot with asphalt and concrete curbing. Alternates include additional connecting sidewalks, and a small concrete walking loop.
10/09/2012 07:00 PM UTC
1543 - Howell Park Swimming Pool and Facility Renovation
Retrofitting a new pool shell in the place of the existing pool shell, restroom renovations, Replacement of the filtration system, Etc...
08/14/2012 07:00 PM UTC
1542 - Brooks Park Swimming Pool and Facility Renovation
Retrofitting a new pool shell in the place of the existing pool shell, restroom renovations, Replacement of the filtration system, Etc...
08/14/2012 03:00 PM UTC
271 - 280 of 297 Solicitations
1 2 22 23 24 25 26 28 30