General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
Sealed Bid# 1864 - Annual Contract for Event Inflatables, Rides, Entertainment, & Event Accessories
Annual Contract for Event Inflatables, Rides, Entertainment, & Event Accessories May 28, 2026 10:00 A.M. CT 6201 Florida Blvd Baton Rouge, LA 70806 Room 1501 - Conference Room
05/28/2026 03:00 PM UTC
SB 1863 SB 1863 LIBERTY LAGOON AQUATIC REPAIRS
SB 1863 LIBERTY LAGOON AQUATIC REPAIRS Project Description: Demolition and reconstruction of new Phase 1 pumps, variable frequency drivers, digital flowmeters, automation, remote controls, new regenerative media filtration, autofill devices, and jib cranes. Bid Opening information: June 2, 2026 at 2:00PM CT BREC's Administration Building 6201 Florida Blvd. Room: 1501 Baton Rouge, LA 70806 Non-Mandatory Pre-Bid: May 20, 2026 at 9:00AM CT 111 Lobdell Ave Baton Rouge, LA 70806
06/02/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
1552 - N. SHERWOOD FOREST PARK – BASKETBALL COURT
Site improvements for existing N. Sherwood Forest Community Park includes a post-tension basketball court, asphalt paved parking, grading, subsurface drainage, miscellaneous concrete & unit paver site paving, sitework, site furnishings, picnic shelter, fencing, landscaping and other miscellaneous site construction as detailed in the construction drawings & specifications.
12/04/2012 09:00 PM UTC
1551- Highland Road Community Park Pavilion
Pavilion is brick veneer structure on typical concrete slab with metal standing seam roof. Pavilion will have bathrooms and storage room. Approximately 3200 SF total under roof.
12/04/2012 08:00 PM UTC
1553 - Wards Creek Multi-Use Pathway Mall Of Louisiana To Siegen Lane Segment
This project consists of the construction of approximately 6,000 linear feet of 12 feet wide concrete pathway. The walkway will parallel Wards Creek from the Mall of Louisiana to the existing Siegen Lane Right of Way. Within these 6,000 feet two bridges will be constructed. One spanning Wards Creek and the other spanning a drainage tributary to Wards Creek.
12/04/2012 04:00 PM UTC
1550-WARDS CREEK MULTI-USE PATHWAY BLUEBONNET TO MALL OF LA SEGMENT
Construction of a concrete pathway, approximately 3400 linear feet, along the south bank of Wards Creek between Bluebonnet Blvd and Mall of Louisiana Blvd. The Work includes, site clearing, storm drainage, earthwork, stone riprap, concrete pavement, striping and traffic control devices, lawns and grasses, concrete retaining walls and site furnishings.
11/13/2012 08:00 PM UTC
#1549 - Magnolia Mound Visitor Center
One story building on typical concrete slab with glass and steel structure and a built up roof system. Total structure is approximately 4,400SF.
10/16/2012 07:00 PM UTC
1545-Annual Contract for Engineered Wood Fiber for Playground Surfacing
Annual Contract for Engineered Wood Fiber Playground Surfacing to be furnished and delivered to BREC Facilities in and throughout East Baton Rouge Parish
10/16/2012 03:00 PM UTC
1548 - Cedar Ridge Neighborhood Park Improvements
This project will include a new playground, concrete paths, and paving a portion of the existing gravel parking lot with asphalt and concrete curbing. Alternates include additional connecting sidewalks, and a small concrete walking loop.
10/09/2012 07:00 PM UTC
1543 - Howell Park Swimming Pool and Facility Renovation
Retrofitting a new pool shell in the place of the existing pool shell, restroom renovations, Replacement of the filtration system, Etc...
08/14/2012 07:00 PM UTC
1542 - Brooks Park Swimming Pool and Facility Renovation
Retrofitting a new pool shell in the place of the existing pool shell, restroom renovations, Replacement of the filtration system, Etc...
08/14/2012 03:00 PM UTC
1538 - College Town Park - Site Improvements
SITE IMPROVEMENTS FOR EXISTING COLLEGE TOWN PARK INCLUDE GRADING, SUBSURFACE DRAINAGE, CONCRETE WALKS, SITEWORK, SITE FURNISHINGS, PICNIC SHELTER, PLAY EQUIPMENT, PLAY AREA INSTALLATION AND OTHER MISCELLANEOUS SITE CONSTRUCTION AS DETAILED IN THE CONSTRUCTION DRAWINGS & SPECIFICATIONS. ALTERNATES WILL INCLUDE A CONCRETE WALK, ARBOR, BENCHES, AND ORNAMENTAL FENCING.
07/10/2012 08:00 PM UTC
281 - 290 of 306 Solicitations
1 2 23 24 25 26 27 29 31