General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
1548 - Cedar Ridge Neighborhood Park Improvements
This project will include a new playground, concrete paths, and paving a portion of the existing gravel parking lot with asphalt and concrete curbing. Alternates include additional connecting sidewalks, and a small concrete walking loop.
10/09/2012 07:00 PM UTC
1543 - Howell Park Swimming Pool and Facility Renovation
Retrofitting a new pool shell in the place of the existing pool shell, restroom renovations, Replacement of the filtration system, Etc...
08/14/2012 07:00 PM UTC
1542 - Brooks Park Swimming Pool and Facility Renovation
Retrofitting a new pool shell in the place of the existing pool shell, restroom renovations, Replacement of the filtration system, Etc...
08/14/2012 03:00 PM UTC
1538 - College Town Park - Site Improvements
SITE IMPROVEMENTS FOR EXISTING COLLEGE TOWN PARK INCLUDE GRADING, SUBSURFACE DRAINAGE, CONCRETE WALKS, SITEWORK, SITE FURNISHINGS, PICNIC SHELTER, PLAY EQUIPMENT, PLAY AREA INSTALLATION AND OTHER MISCELLANEOUS SITE CONSTRUCTION AS DETAILED IN THE CONSTRUCTION DRAWINGS & SPECIFICATIONS. ALTERNATES WILL INCLUDE A CONCRETE WALK, ARBOR, BENCHES, AND ORNAMENTAL FENCING.
07/10/2012 08:00 PM UTC
1539 - Demolition/Hazardous Materials Abatement of PAWNEE RECREATION CENTER
This Contract shall consist of the removal of previously determined asbestos containing building materials, removal of building contents, demolition of the building and other miscellaneous site construction as detailed in the construction drawings & specifications. The concrete slab under the gym floor is to remain. The concrete slab under the recreational building is to be removed as part of Alternates 1 and 2, if accepted by Owner; otherwise the concrete slab will remain. Areas adjacent to the concrete slab remaining will require and surrounding backfilling the lot, and seeding.
07/10/2012 07:00 PM UTC
1540 - Swimming Pool Construction BREC Howell and Brooks Parks
Reconstruction of two (2) swimming pools one at Brooks park and one at Howell Park, consisting of new gunite pool shell construction with new equipment and decking, partial backfill of existing pool, and renovations (plumbing and electrical) to bathhouses.
07/10/2012 03:00 PM UTC
1536 - Perkins Road Community Park - Parking Improvements
New parking lot including lighting and drainage improvements, and other miscellaneous site construction as detailed in the construction drawings & specifications.
06/19/2012 08:00 PM UTC
1534- Highland Road Community Park Pavilion
Open air Pavilion, Restrooms, Site work, Electrical, Masonry, etc...
06/19/2012 07:00 PM UTC
1535- Central Community Sports Park - Concession Building
CMU Concession Building, Restrooms, Masonry, Minor Site work, utility Tie-in, Concrete slab, etc...
06/19/2012 03:00 PM UTC
1533-Annual Contract for Limestone and Recycled Concrete
For Limestone and Recycled Concrete as Described in Specifications.
06/15/2012 03:00 PM UTC
281 - 290 of 300 Solicitations
1 2 22 23 24 25 26 27 29