General Info

Business Logo

Kent State University - Office of the University Architect

615 Loop Rd. Suite 101, Kent, OH 44242-0001
(330) 672-3880


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
KSU-22L078
Tri-Towers Steam Line Replacement 1525 Leebrick Drive, Kent Ohio 44243 Base Bid Estimate: $1,610,000.00 Alternate 1 Estimate: $375,000.00 Alternate #2 Estimate: $250,000.00 Anticipated NTP date is January 19, 2027
11/17/2026 04:00 PM UTC
KSU-27S031
Library Tower Renovations The Main University Library located on the Kent Campus was built in the 1960s and designed to house the campus system’s collection, offices, and archives. The vision of the University Libraries has changed with a major paradigm shift supporting digital scholarship and a space Masterplan was undertaken in 2010. The masterplan has been updated to guide strategic projects over the past decade that enhance the building experience for students, faculty, and visitors. The University Library is central to the institution’s strategic vision, evolving to meet the needs of 21st-century students and faculty in alignment with the changing role of academic libraries nationwide. Building on prior investments, including the recent tower elevator modernization, this project will reimagine the first-floor infrastructure and service areas, including the circulation desk, computer lab, and escalator connection between the first and second floors, to better support contemporary student and patron needs with more flexible engagement through multipurpose spaces. The building has undergone several investments in energy conservation projects, a partial building re-roof, infrastructure upgrades, as well as major restroom renovations over the last decade from local and alternative funding sources. Additional master plan initiatives, including collection consolidation and high-density storage in the basement, have created opportunities for expanded and improved use of library space. Interested parties may attend a pre-proposal meeting on November 19, 2026, at 10 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242
12/15/2026 04:00 PM UTC
KSU-27S034
Stewart Hall VRF System Replacement Stewart Hall was constructed in approximately 1967 as a small group residential housing and dining facility. It was renovated in 2010-2011 for administrative/office functions when the current HVAC systems were installed. The two (2) VRF systems installed at that time have reached the end of their beneficial service life and need to be replaced in their entirety. We expect the RTU with VAV/RH terminals, heating water system and equipment, and the 100% OA/EA HRU to remain in place and in service during this project. The existing VRF systems consist of (2) outdoor units with twinned outdoor equipment, 3 branch controllers, and 47 total indoor units. Both complete systems need to be replaced, including the outdoor units, branch controllers, indoor units, equipment supports, controllers, and all refrigerant piping. Control and power wiring and condensate drain piping may be possible to re-use. The current VRF systems serve approximately 14,700 square feet of the building’s roughly 23,000 square feet (net). When originally installed, adequate nitrogen purge was not provided and debris and moisture has fouled compressors and refrigerant control components. The system has also experienced failures of check valves and linear expansion valves. The combination of debris, compressor failures, and refrigerant valve failures, paired with equipment that relies on load diversity, have left KSU with a system that is no longer able to provide adequate heating and cooling to the interior spaces and occupants. We would like to replace the existing VRF systems with new VRF systems due to the tight floor to floor heights available and the unavailable location for chillers and piping and pumping equipment. The new systems will keep the current at-grade location of the outdoor units, and will re-use the indoor unit and refrigerant valving locations with similar equipment. The new systems should also not rely on diversity of load; the outdoor units should have the same nominal capacity as the sum of the connected indoor units’ capacities to the greatest extent possible. Re-use of the existing electrical feeders is expected. New outdoor units shall operate individually, not be twinned or paired together, and shall serve a single refrigerant valving unit and associated indoor units. New VRF system controls shall be provided. New interface controllers will be required between the VRF system and KSU’s Johnson Controls BAS. Removal and replacement of any and all wall, floor, and ceiling materials is expected to occur under this project; this is expected to occur to accommodate replacement of all refrigerant piping/insulation and control wiring. Interested parties may attend a pre-proposal meeting on December 8 2026, at 9 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242.
12/18/2026 04:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
KSU-24L029
Project Title: New Aviary Structure Project Description: New Research Structure Projection Location: 1721 Seiberling Drive Name of building (if applicable): Aviary Research Estimate: Base Bid: $615,000.00 Prebid meeting: Friday 4/19/24 11:00am 102 Harbourt Hall
05/03/2024 03:00 PM UTC
KSU-24P033
The Kent campus of Kent State University has an enrollment of 26,106 students, houses 6,182 students on the 900-acre campus. The Kent Campus includes 128 buildings or structures, of which 74 are major academic buildings. The campus, founded in 1910, witnessed a major expansion in the 1960’s with more than 50 buildings constructed and has recently completed transformational projects focused on healthy living-learning and research environments. In March of 2018, Kent State University Board of Trustees adopted a 10-year facilities masterplan that embarked on a transformational vision for the Kent Campus to better serve the needs of students and the entire Kent State community. The Kent Campus Gateway Master Plan implementation enhanced the university’s front campus in addition to concentrating on a campuswide series of spaces focused on innovation and research while maintaining the campus town gown synergy with the City of Kent most recently adding Kent, Ohio to Zillow’s 2023 list of Top 2 College Towns. Since the approval of the masterplan and its implementation of signature spaces, the university has navigated a global pandemic and continues to face changes with demographics, enrollment, workplace needs and educational delivery methodologies. Kent State University Office of the University Architect is requesting qualifications for professional planning services to develop a broad-based and forward-thinking Workplace Strategic Framework to guide its current and future workplace, educational space allocation and utilization with a focus on square footage reduction. A significant impetus for this strategic framework study is the acceleration of change in work modalities, coupled with organizational change aligning with strategic objectives and projected enrollment decline. The aim of the study is to deliver actionable recommendations to increase utilization while aligning with enrollment projections within academic spaces and to find the optimal balance for Kent State with on campus vs. remote staffing to support a vibrant living/learning experience for students. An RFQ Pre-Submittal informational session will be held on Wednesday, April 10, 2024 at 10:00 am in the Office of the University Architect, 102 Harbourt Hall, 615 Loop Road, Kent State University, Kent, Ohio, 44242. Submitting teams are strongly encouraged to attend.
04/26/2024 03:00 PM UTC
KSU-23S802
Project Title: Tuscarawas Founders Hall HVAC Upgrade Phase 3 Projection Location:330 University Drive NE New Philadelphia Name of building (if applicable): Founders Hall Estimates: Base Bid $860,000.00 ALT M1 $196,185.00 ALT M2 $82,362.00 ALT M3 $230,282.00 ALT M4 $139,050.00 ALT M5 $109,278.00 ALT M6 $10,059.00 ALT M7 $75,000.00 ALT M8 $8,500.00 Controlling Board Submission is May 2, 2024 with a Controlling Board date of June 3, 2024. A Bid Extension will be requested to process the contract. Anticipated Notice to Proceed is July 8, 2024.
04/19/2024 03:00 PM UTC
KSU-24L036
Project Title: Library Second Floor One-Stop Relocation Projection Location: 1125 Risman Drive Name of building (if applicable): Library Estimate(s): Base Bid: $200,000.00 Alternate #1: $27,600.00 The Notice to Proceed is assumed to be June 11, 2024 giving a Substantial Completion Date of August 9, 2024. If an NTP can be issued earlier, the GC can receive a zero dollar change order for additional days to leave the Substantial Completion Date as August 9, 2024. Under no circumstances can the on-site construction commence any earlier than May 13, 2024.
04/12/2024 03:00 PM UTC
KSU-24L078
Project Title: Crawford Hall Donor Recognition Projection Location: 100 Midway Drive Kent, Ohio 44242 Name of building (if applicable): Crawford Hall Estimate(s): Base Bid: $247,000.00 Alternate G-01: Reception Desk $28,000.00 Alternate G-02: Light Fixtures $25,000.00 The Notice to Proceed is assumed to be May 7, 2024 giving a Substantial Completion Date of August 12, 2024.
04/10/2024 06:30 PM UTC
KSU-24S043
Project Title: Security Equipment Grant Project Description: Provide security equipment across the entire Kent State Campus System. Note: Prevailing Wage will vary by campus. Projection Location: All Kent State campuses Name of building (if applicable): varies across campuses Estimates: Base Bid: $115,000.00 Alternate 1: $130,000.00 Alternate 2: $38,000.00 Alternate 3: $6,000.00 Alternate 4: $15,000.00 Alternate 5: $8,000.00 Alternate 6: $10,000.00 Alternate 7: $15,000.00 Alternate 8: $8,000.00 Alternate 9: $11,000.00 Alternate 10: $17,000.00 Alternate 11: $15,000.00 Alternate 12: $8,000.00 Alternate 13: $13,000.00 Alternate 14: $11,000.00 Alternate 15: $9,000.00 Alternate 16: $12,000.00 Alternate 17: $19,000.00 Alternate 18: $22,000.00 Alternate 19: $3,000.00 Refer to Solicitation for full Pre-Bid Tour information. These will be the only times to access these locations.
04/05/2024 03:00 PM UTC
KSU-23S026
Project Title: Vivarium Cunningham Hall Deferred Maintenance Improvements Projection Location:1275 Lefton Esplanade Name of building (if applicable): Cunningham Hall Estimate(s): Base Bid: $2,164,146.00 Alternate 1: $73,594.00 Alternate 2: $279,904.00 Alternate 3: $664,761.00 Alternate 4: $25,000.00 This is a state capitol funded project subject to Controlling Board release before a contract can be issued.
03/29/2024 06:00 PM UTC
KSU-21S603
Project Title: Stark Fine Arts Roof Replacement Projection Location: 6000 Frank Ave. North Canton, Ohio 44720 Name of building (if applicable): Fine Arts Building Estimate(s): Base Bid -Roof FR09 --$228,000.00 Alternate G-01 Roof RF02 --$252,000.00 Alternate G-02 Roof RF03 --$298,000.00 Alternate G-03 Roof RF04 --$114,000.00 Alternate G-04 Roof RF05 --$143,000.00 Alternate G-05 Roof RF06 --$5,000.00 Alternate G-06 Roof RF07 --$69,000.00 Alternate G-07 Roof RF08 --$226,000.00 Alternate G-08 Roof RF10 --$163,000.00 Alternate G-09 Roof RF11 --$190,000.00 Alternate G-10 Roof RF12 --$458,000.00 Total (Base + All Alternates) $2,146,000.00
03/29/2024 03:00 PM UTC
KSU-19L036 Rebid
North Campus Lawn -Phase 1 **The advertisement posted in the procurement documents differs from the printed advertisement in the Record Courier. The attached ad on bidexpress is the most current.** Note: this a rebid from the January 31, 2024 Bid Event. Refer to the "Rebid Narrative" on the cover sheet of the drawings for a more detailed description of the changes. Documents are presented without revision clouds or notations relative to the last bid event. Project includes site demolition and preparation, storm water underground, site grading, walls, stairs and railings, concrete sidewalks, site lighting, irrigation, landscaping and fountain. 150 Terrace Drive Estimates: Base Bid: $2,700,000.00 Alternate 1 Additional Site Walls $210,000.00 Alternate 2 Concrete Pavers at Water Fountain $ 35,000.00 Alternate 3 Terrace Drive Stairs: $365,000.00 Prebid Meeting: Thursday February 22, 2024 1pm Harbourt Hall Room 102
03/07/2024 03:00 PM UTC
KSU-24L054B
Project Title: Centennial Courts A&B Domestic Water Pipe Lining & Repairs Project Description: Line the domestic water pipes and perform miscellaneous repairs to the piping and valves to eliminate pin hole leaks in the copper piping distribution for two Res Halls. Timeline: the available on-site construction days are from May 15, 2024 to July 19, 2024. These 67 calendar days do not change even if the Notice to Proceed date is earlier than assumed. Contract dates use April 22, 2024 as the assumed NTP (60 days from bid opening.) Projection Location: 275 and 325 Midway Drive Name of building (if applicable): Centennial Court A & B Estimate(s): $1,615,000.00 Note: a single GC contract will be awarded for both buildings. During contracting, the GC will be asked to identify and separate the costs between CCA and CCB for accounting purposes.
02/22/2024 04:00 PM UTC
51 - 60 of 71 Solicitations
1 2 3 4 6 8