General Info

Business Logo

Kent State University - Office of the University Architect

615 Loop Rd. Suite 101, Kent, OH 44242-0001
(330) 672-3880


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
KSU-22L078
Tri-Towers Steam Line Replacement 1525 Leebrick Drive, Kent Ohio 44243 Base Bid Estimate: $1,610,000.00 Alternate 1 Estimate: $375,000.00 Alternate #2 Estimate: $250,000.00 Anticipated NTP date is January 19, 2027
11/17/2026 04:00 PM UTC
KSU-27S031
Library Tower Renovations The Main University Library located on the Kent Campus was built in the 1960s and designed to house the campus system’s collection, offices, and archives. The vision of the University Libraries has changed with a major paradigm shift supporting digital scholarship and a space Masterplan was undertaken in 2010. The masterplan has been updated to guide strategic projects over the past decade that enhance the building experience for students, faculty, and visitors. The University Library is central to the institution’s strategic vision, evolving to meet the needs of 21st-century students and faculty in alignment with the changing role of academic libraries nationwide. Building on prior investments, including the recent tower elevator modernization, this project will reimagine the first-floor infrastructure and service areas, including the circulation desk, computer lab, and escalator connection between the first and second floors, to better support contemporary student and patron needs with more flexible engagement through multipurpose spaces. The building has undergone several investments in energy conservation projects, a partial building re-roof, infrastructure upgrades, as well as major restroom renovations over the last decade from local and alternative funding sources. Additional master plan initiatives, including collection consolidation and high-density storage in the basement, have created opportunities for expanded and improved use of library space. Interested parties may attend a pre-proposal meeting on November 19, 2026, at 10 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242
12/15/2026 04:00 PM UTC
KSU-27S034
Stewart Hall VRF System Replacement Stewart Hall was constructed in approximately 1967 as a small group residential housing and dining facility. It was renovated in 2010-2011 for administrative/office functions when the current HVAC systems were installed. The two (2) VRF systems installed at that time have reached the end of their beneficial service life and need to be replaced in their entirety. We expect the RTU with VAV/RH terminals, heating water system and equipment, and the 100% OA/EA HRU to remain in place and in service during this project. The existing VRF systems consist of (2) outdoor units with twinned outdoor equipment, 3 branch controllers, and 47 total indoor units. Both complete systems need to be replaced, including the outdoor units, branch controllers, indoor units, equipment supports, controllers, and all refrigerant piping. Control and power wiring and condensate drain piping may be possible to re-use. The current VRF systems serve approximately 14,700 square feet of the building’s roughly 23,000 square feet (net). When originally installed, adequate nitrogen purge was not provided and debris and moisture has fouled compressors and refrigerant control components. The system has also experienced failures of check valves and linear expansion valves. The combination of debris, compressor failures, and refrigerant valve failures, paired with equipment that relies on load diversity, have left KSU with a system that is no longer able to provide adequate heating and cooling to the interior spaces and occupants. We would like to replace the existing VRF systems with new VRF systems due to the tight floor to floor heights available and the unavailable location for chillers and piping and pumping equipment. The new systems will keep the current at-grade location of the outdoor units, and will re-use the indoor unit and refrigerant valving locations with similar equipment. The new systems should also not rely on diversity of load; the outdoor units should have the same nominal capacity as the sum of the connected indoor units’ capacities to the greatest extent possible. Re-use of the existing electrical feeders is expected. New outdoor units shall operate individually, not be twinned or paired together, and shall serve a single refrigerant valving unit and associated indoor units. New VRF system controls shall be provided. New interface controllers will be required between the VRF system and KSU’s Johnson Controls BAS. Removal and replacement of any and all wall, floor, and ceiling materials is expected to occur under this project; this is expected to occur to accommodate replacement of all refrigerant piping/insulation and control wiring. Interested parties may attend a pre-proposal meeting on December 8 2026, at 9 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242.
12/18/2026 04:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
KSU-21L104
Project Description: Renovation and Addition to Ice Arena Building Project Title: Ice Arena / Band Educational Facility Renovations Projection Location: Kent Campus Name of building (if applicable): Ice Arena Estimate(s): Base Bid: $8,200,000.00 Alternates: $700,000.00
05/12/2023 03:00 PM UTC
71 - 71 of 71 Solicitations
1 2 3 4 5 6 8 Next →