Kent State University - Office of the University Architect
615 Loop Rd. Suite 101, Kent, OH 44242-0001
(330) 672-3880
615 Loop Rd. Suite 101, Kent, OH 44242-0001
(330) 672-3880
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
KSU-22L078
Tri-Towers Steam Line Replacement
1525 Leebrick Drive, Kent Ohio 44243
Base Bid Estimate: $1,610,000.00
Alternate 1 Estimate: $375,000.00
Alternate #2 Estimate: $250,000.00
Anticipated NTP date is January 19, 2027
| 11/17/2026 04:00 PM UTC |
|
KSU-27S031
Library Tower Renovations
The Main University Library located on the Kent Campus was built in the 1960s and designed to house the campus system’s collection, offices, and archives. The vision of the University Libraries has changed with a major paradigm shift supporting digital scholarship and a space Masterplan was undertaken in 2010. The masterplan has been updated to guide strategic projects over the past decade that enhance the building experience for students, faculty, and visitors.
The University Library is central to the institution’s strategic vision, evolving to meet the needs of 21st-century students and faculty in alignment with the changing role of academic libraries nationwide. Building on prior investments, including the recent tower elevator modernization, this project will reimagine the first-floor infrastructure and service areas, including the circulation desk, computer lab, and escalator connection between the first and second floors, to better support contemporary student and patron needs with more flexible engagement through multipurpose spaces.
The building has undergone several investments in energy conservation projects, a partial building re-roof, infrastructure upgrades, as well as major restroom renovations over the last decade from local and alternative funding sources. Additional master plan initiatives, including collection consolidation and high-density storage in the basement, have created opportunities for expanded and improved use of library space.
Interested parties may attend a pre-proposal meeting on November 19, 2026, at 10 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242
| 12/15/2026 04:00 PM UTC |
|
KSU-27S034
Stewart Hall VRF System Replacement
Stewart Hall was constructed in approximately 1967 as a small group residential housing and dining facility. It was renovated in 2010-2011 for administrative/office functions when the current HVAC systems were installed. The two (2) VRF systems installed at that time have reached the end of their beneficial service life and need to be replaced in their entirety. We expect the RTU with VAV/RH terminals, heating water system and equipment, and the 100% OA/EA HRU to remain in place and in service during this project. The existing VRF systems consist of (2) outdoor units with twinned outdoor equipment, 3 branch controllers, and 47 total indoor units. Both complete systems need to be replaced, including the outdoor units, branch controllers, indoor units, equipment supports, controllers, and all refrigerant piping. Control and power wiring and condensate drain piping may be possible to re-use.
The current VRF systems serve approximately 14,700 square feet of the building’s roughly 23,000 square feet (net).
When originally installed, adequate nitrogen purge was not provided and debris and moisture has fouled compressors and refrigerant control components. The system has also experienced failures of check valves and linear expansion valves. The combination of debris, compressor failures, and refrigerant valve failures, paired with equipment that relies on load diversity, have left KSU with a system that is no longer able to provide adequate heating and cooling to the interior spaces and occupants.
We would like to replace the existing VRF systems with new VRF systems due to the tight floor to floor heights available and the unavailable location for chillers and piping and pumping equipment. The new systems will keep the current at-grade location of the outdoor units, and will re-use the indoor unit and refrigerant valving locations with similar equipment.
The new systems should also not rely on diversity of load; the outdoor units should have the same nominal capacity as the sum of the connected indoor units’ capacities to the greatest extent possible. Re-use of the existing electrical feeders is expected. New outdoor units shall operate individually, not be twinned or paired together, and shall serve a single refrigerant valving unit and associated indoor units. New VRF system controls shall be provided.
New interface controllers will be required between the VRF system and KSU’s Johnson Controls BAS.
Removal and replacement of any and all wall, floor, and ceiling materials is expected to occur under this project; this is expected to occur to accommodate replacement of all refrigerant piping/insulation and control wiring.
Interested parties may attend a pre-proposal meeting on December 8 2026, at 9 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242.
| 12/18/2026 04:00 PM UTC |
| Number | Deadline |
|---|---|
|
KSU-19L036
North Campus Lawn -Phase 1
Project includes site demolition and preparation, storm water underground, site grading, walls, stairs and railings, concrete sidewalks, site lighting, irrigation, landscaping and fountain.
150 Terrace Drive
Estimates:
Base Bid: $2,802,375.00
Alternate 1 Terrace Drive Stairs: $511,085.00
| 01/31/2024 03:00 PM UTC |
|
KSU-23S076
WKSU Modifications for Teleproductions
Interior Renovations to the offices and broadcast studios. Fire Alarm Package was previously bid and is being awarded separately under separate funding.
1613 Summit Street, Kent, Ohio 44242
WKSU Broadcast Center
Estimate: $605,900 Base Bid
Alternate G-01: Door 110a.1 and adjacent wall: $10,000
Alternate G-02: Server Room mechanical unit: $20,000
Alternate G-03: Upgraded Electrical Panel: $33,000
Alternate G-04: UPS Alternate -$5,000
Alternate G-05: Exterior Antenna/Satellite Dish Demo: $12,000
Alternate G-06: Select Finishes and Associated Demo: $30,000
Alternate G-07: Select Door Painting Area #1: $8,000
Alternate G-08: Select Door Painting Area #2: $8,000
| 01/11/2024 04:00 PM UTC |
|
KSU-21L055
Project Title: Devine Diamond Phase II
Project Description: Renovations and additions to the dugouts for Women's Softball at Devine Diamond
Projection Location: 2213 Summit Street, Kent, Ohio 44242
Name of building (if applicable): Dix Stadium Complex, Devine Diamond
Estimate(s):
Base Bid: $375,000.00
Alternate 1 Concrete Pavement: $25,000
Alternate 2 Concrete Sidewalks: $20,000
Alternate 3 Backstop Replacement: $275,000
Alternate 4 Barrier Fencing: $25,000
Alternate 5 Dugout Standing Spaces: $50,000
| 11/28/2023 03:00 PM UTC |
|
KSU-23S076_FA
WKSU Modifications for Teleproductions -Fire Alarm Package
Interior Renovations to the offices and broadcast studios. This bid is building fire alarm package only. The balance of the general trades and MEP will be bid as a single general contract. This package is being bid early because it is state funded and subject to controlling board timelines.
1613 Summit Street, Kent, Ohio 44242
WKSU Broadcast Center
Estimate: $85,000 Base Bid
| 11/17/2023 04:00 PM UTC |
|
KSU-23L059
Student Center STC Suite 120 Demolition
Project Description:
Kent Campus
Student Center
1075 Risman Drive, Kent, Ohio 44242
Estimate(s): $387,500.00
| 10/13/2023 03:00 PM UTC |
|
KSU-23L119
STC Chilled Water Loop Renovation
Project Description: Renovations to the Refrigeration Loop
Kent Campus
Student Center
1075 Risman Drive, Kent, Ohio 44242
Estimate(s):
Base Bid: $212,000
Alternate 1: $35,000
Alternate 2: $33,000
Alternate 3: (-$6,000)
| 10/06/2023 03:00 PM UTC |
|
KSU-21S092 Rebid
Rebid of prior solicitation KSU-21S092
Note: Refer to 00 31 00- AVAILABLE PROJECT INFORMATION for high-level overview of major of changes between bid packages.
CAED Twin Center Second Floor Rehabilitation
Description: Full renovation of 2nd floor former kitchen and cafeteria and limited renovation of associated 1st floor areas of Twin Center into new studio classroom space for the College of Architecture and Environmental Design
Project Address:
Twin Center: 575 Senshauser Drive, Kent, Ohio 44242 Kent Campus Portage County
ESTIMATES:
Base Bid: $4,875,000
Alternate G-1 New Exterior Curtainwall: $119,250
Alternate G-2 New Large Skylight: $108,700
Alternate G-3 Acoustic Ceiling Cloud ACT-3: $62,000
Alternate G-4: Sculptural Elevator Shaft Cladding FP-2: $80,000
Alternate G-5: Direct Applied Acoustic Ceiling Product: $80,000
Alternate G-6: New Window Openings on East Side: $125,000
Alternate G-7: Linear Light Fixtures: $37,000
| 08/18/2023 03:00 PM UTC |
|
KSU-22L019
Summit Street Power Plant Emergency Fuel Oil Storage
Adding generator fuel oil storage within existing structure
Summit Street Power Plant
1501 Ted Boyd Drive, Kent, Ohio 44242
Portage County
Estimate:
Base Bid: $418,000.00
No Alternates
| 08/16/2023 03:00 PM UTC |
|
KSU-23L037
Library iSchool Gallery Renovations
The work consists of select renovations to the common area and galleries located on the 3rd floor of the Library. Work includes an operable glass partition, minor demolition, flooring, lighting and minor mechanical work.
1125 Risman Drive
Library Third Floor
Estimated Base Bid: $300,000.00
| 07/13/2023 03:00 PM UTC |
|
KSU-21S092
CAED Twin Center Second Floor Rehabilitation
Description: Full renovation of 2nd floor former kitchen and cafeteria and limited renovation of associated 1st floor areas of Twin Center into new studio classroom space for the College of Architecture and Environmental Design
Twin Center: 575 Senshauser Drive, Kent, Ohio 44243 Kent Campus Portage County
Estimates:
Base Bid: $4,815,000
Alternate G-1 Exterior Curtainwall: $119,250
Alternate G-2 Provide Large Skylight: $108,700
Alternate G-3 Lighting for Entry Felt Sculpture: $82,500
Alternate G-4: Replace 1st Floor Storefront East and West: $448,400
Alternate G-5: Sprayed Cellulose Acoustic Ceiling Coating: deduct -($75,500)
| 06/26/2023 09:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.