City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9593PlanHolders04012026.pdf (90 KB) |
Contract 9593 - Pressure Zone 4 Crossing
| |
| 9694PlanHolders04012026.pdf (90.3 KB) |
Contract 9694 - Warner & Worthington Park Courts
| |
| 9726PlanHolders04012026.pdf (97.4 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9740PlanHolders04012026.pdf (96.7 KB) |
Contract 9740 - Unit Well 12 Upgrade
| |
| 9751PlanHolders04012026.pdf (86.4 KB) |
Contract 9751 - 2026 Parking Garage Maintenance
| |
| 9757PlanHolders04012026.pdf (88.3 KB) |
Contract 9757 - Imagination Center Fiber
| |
| 9766PlanHolders04012026.pdf (88.9 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| Number | Deadline |
|---|---|
|
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
| 04/02/2026 07:00 PM UTC |
|
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
| 04/02/2026 07:00 PM UTC |
|
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex.
The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
| 04/02/2026 07:00 PM UTC |
|
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
| 04/02/2026 07:00 PM UTC |
|
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
| 04/02/2026 07:00 PM UTC |
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8798 - Resurfacing 2025 - Assessment District
The work in this contract includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes, adjusting inlets and castings, installation of new storm sewer, and pulverizing/milling, and paving various streets that are included with the resurfacing program.
| 05/08/2025 07:00 PM UTC |
|
9642 - Rennebohm Park East Tennis Courts 2025
This project consists of reconstructing the east tennis court complex at Rennebohm Park. Work includes asphalt pavement, grading, base course, electrical and lighting, fencing, gates, net posts, net tie downs, and sport court finishing and striping.
| 04/17/2025 07:00 PM UTC |
|
9648 - 2025 Parking Garage Maintenance
Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
| 04/17/2025 07:00 PM UTC |
|
9646 - 2025 Sport Court Resurfacings
This project consists of resurfacing existing basketball, tennis and pickleball courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
| 04/17/2025 07:00 PM UTC |
|
8783 - Shawnee Pass Assessment District 2025, Nakoma Sidewalk, and Nakoma Culvert
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, sanitary sewer replacement, and replacement of storm sewer main, culvert, and storm sewer structures.
| 04/17/2025 07:00 PM UTC |
|
9610 Imagination Center at Reindahl Park
Work shall include but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
| 04/03/2025 07:00 PM UTC |
|
9633 - CIPP 2025 Churchill Dr Water Main Rehabilitation
The rehabilitation of these water mains is to be completed by lining the existing water mains with a Class IV structural cured-in-place pipe (CIPP), certified for the conveyance of drinking water.
| 04/03/2025 07:00 PM UTC |
|
9617 - Solar PV - Water Utility Olin Ave
The work includes installation of new arrays totaling 74 kW across the two buildings and the reinstallation of a 9.84 kW array on the office building.
| 03/27/2025 07:00 PM UTC |
|
9627 - South Madison Demolitions & Site Restorations
Hazmat remediation and demolition of structures, removing site features and site restoration grading and reseeding of six parcels located at 810 & 818 W. Badger Rd., 814-826 North Ave., 1810 South Park St., and 1901-1915 South Park St.
| 03/27/2025 07:00 PM UTC |
|
8757 - Bartillon Sidewalk
The work under this contract shall include, but is not limited to, clearing, grubbing, concrete sidewalk, and terrace restoration with topsoil, seed, and matting.
| 03/27/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.