General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02112026.pdf (91 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02112026.pdf (92.3 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02112026.pdf (84.3 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02112026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
8794 - Chip Sealing 2025 - West
The work under this contract consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
03/27/2025 07:00 PM UTC
8795 - Chip Sealing 2025 - South
The work under this contract consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
03/27/2025 07:00 PM UTC
8781 - Evergreen Avenue, Ohio Avenue, Sommers Avenue Assessment District - 2025
The work under this contract shall include, but not be limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking, signing, replacement of a traffic signals, and replacement of street lighting.
03/27/2025 07:00 PM UTC
8800 - 2025 Safe Streets
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk, asphalt pavement, and replacement of storm sewer main and storm sewer structures.
03/20/2025 07:00 PM UTC
8796 - Repairing and Sealing Pavement Cracks - Major Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
03/20/2025 07:00 PM UTC
8797 - Repairing and Sealing Pavement Cracks - Local Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
03/20/2025 07:00 PM UTC
9318 - Olin Waste Transfer Drop-Off
This project is to provide a dedicated Public Waste and Recycling Drop-off site at the existing Olin Waste Transfer site. Currently the temporary site is co-mingled with large city vehicles and the drop-off site runs limited hours for safety reasons. This project will install a separate public access road off of Quann-Olin Pkwy. The internal circulation of the drop-off area will keep public and city vehicle traffic separated.
03/13/2025 07:00 PM UTC
8811 - Bridge Repairs - 2025
This project consists of bridge repairs for the Park Street pedestrian bridge (P-13-760), Commercial Avenue bridge, USH-51 pedestrian bridge (B-13-341), and the Campus Drive Bridge (B-13-266) over Highland Avenue.
03/13/2025 07:00 PM UTC
8791 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 20) - 2025
The work includes horizontally sawcutting/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/27/2025 08:00 PM UTC
8788 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 10) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work.
02/27/2025 08:00 PM UTC
41 - 50 of 1072 Solicitations
1 2 3 5 7 8 9 107 108