General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
9582 - LED Street Lights
This project generally consists of removal and replacement of old streetlight fixtures with new LED fixtures Citywide.
10/17/2024 07:00 PM UTC
8770 - West Towne Path - Phase 2A
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, block retaining wall, lighting conduit and base/poles, pavement markings, and ground restoration.
09/26/2024 07:00 PM UTC
9486 - Commercial Avenue Sanitary Sewer Reconstruction
The work under this contract shall include, but is not limited to, installation of sanitary sewer main (open trench and bore & jack methods), lateral reconnections, and asphalt pavement patching.
09/12/2024 07:00 PM UTC
9536 - CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon & CIPP Lining Rehabilitation - North Mills Street Sanitary Sewer Siphon
The work includes the trenchless rehabilitation of an approximately 79 feet linear feet of 8” ductile iron sanitary sewer mains using thermal cure CIPP methods (two mains total).
09/12/2024 07:00 PM UTC
8767 - Door Creek Park Connection
The work under this contract shall include, but is not limited to, installing new conduit and fiber optic between an existing splice point at the intersection of Milwaukee Street and Sprecher Road and a new shelter being built at Door Creek Park.
08/29/2024 07:00 PM UTC
9561 - S. Paterson Street Sanitary Sewer Replacement Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, lateral reconnection, bore and jacking of casing pipe, and asphalt pavement patching.
08/29/2024 07:00 PM UTC
9238 - Burr Jones Shoreline Repair
The work includes removing two existing metal seawalls, placing riprap protection along the bank, asphalt path construction, incorporating a stone step area to the water from the edge of path, grading, erosion control, soil matting, and restoration.
08/15/2024 07:00 PM UTC
9174 - McPike Park - Building Demolition and Site Restoration
The work includes the demolition and removal of structures, site features and asphalt paving located at 202-212 S. Baldwin Street, Madison, WI.
08/15/2024 07:00 PM UTC
9489 - 3400 Block E Washington Ave Sanitary Sewer Replacement
This project generally consists of replacement and installation of sanitary sewer pipes and structures, abandoning existing sanitary sewer, and replacement of concrete pavement.
07/18/2024 07:00 PM UTC
8742 Rutledge Street Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
07/18/2024 07:00 PM UTC
41 - 50 of 1047 Solicitations
1 2 3 5 7 8 9 104 105