General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8786PlanHolders03132026.pdf (91.6 KB)
Contract 8786 - MacArthur, Larson, Sycamore
8810PlanHolders03132026.pdf (88.5 KB)
Contract 8810 - Midvale Boulevard Pavement
8845PlanHolders03132026.pdf (91.7 KB)
Contract 8845 - Campus Babcock Railroad Crossing
9593PlanHolders03132026.pdf (88.5 KB)
Contract 9593 - Pressure Zone 4 Crossing
9613PlanHolders03132026.pdf (91.2 KB)
Contract 9613 - CIPP UV Lining Rehabilitation
9694PlanHolders03132026.pdf (86.5 KB)
Contract 9694 - Warner & Worthington Park Courts
9712PlanHolders03132026.pdf (88.6 KB)
Contract 9712 - Yahara Hills Golf Course Well Pipe
9726PlanHolders03132026.pdf (96.1 KB)
Contract 9726 - Country Grove Singletrack Trail
9730PlanHolders03132026.pdf (92.3 KB)
Contract 9730 - Manitou Way Storm Box
9740PlanHolders03132026.pdf (94 KB)
Contract 9740 - Unit Well 12 Upgrade
11 Documents

Upcoming Solicitations

Number Deadline
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/19/2026 07:00 PM UTC
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
03/19/2026 07:00 PM UTC
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
03/19/2026 07:00 PM UTC
8845 - Campus Drive at Babcock Drive Railroad Crossing Improvements
Work includes, but is not limited to, base preparation, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, electrical, traffic signals, lighting, pavement marking, signs, fencing, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
03/19/2026 07:00 PM UTC
8810 - Midvale Boulevard Pavement Patching
The work under this contract shall include, but not be limited to, asphalt pavement patching, pavement markings, tubular bollard curb extensions, and rectangular rapid flashing beacon installations.
03/19/2026 07:00 PM UTC
8786 - MacArthur Road, MacArthur Court, Larson Court, Sycamore Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
03/19/2026 07:00 PM UTC
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
8770 - West Towne Path - Phase 2A
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, block retaining wall, lighting conduit and base/poles, pavement markings, and ground restoration.
09/26/2024 07:00 PM UTC
9486 - Commercial Avenue Sanitary Sewer Reconstruction
The work under this contract shall include, but is not limited to, installation of sanitary sewer main (open trench and bore & jack methods), lateral reconnections, and asphalt pavement patching.
09/12/2024 07:00 PM UTC
9536 - CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon & CIPP Lining Rehabilitation - North Mills Street Sanitary Sewer Siphon
The work includes the trenchless rehabilitation of an approximately 79 feet linear feet of 8” ductile iron sanitary sewer mains using thermal cure CIPP methods (two mains total).
09/12/2024 07:00 PM UTC
8767 - Door Creek Park Connection
The work under this contract shall include, but is not limited to, installing new conduit and fiber optic between an existing splice point at the intersection of Milwaukee Street and Sprecher Road and a new shelter being built at Door Creek Park.
08/29/2024 07:00 PM UTC
9561 - S. Paterson Street Sanitary Sewer Replacement Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, lateral reconnection, bore and jacking of casing pipe, and asphalt pavement patching.
08/29/2024 07:00 PM UTC
9238 - Burr Jones Shoreline Repair
The work includes removing two existing metal seawalls, placing riprap protection along the bank, asphalt path construction, incorporating a stone step area to the water from the edge of path, grading, erosion control, soil matting, and restoration.
08/15/2024 07:00 PM UTC
9174 - McPike Park - Building Demolition and Site Restoration
The work includes the demolition and removal of structures, site features and asphalt paving located at 202-212 S. Baldwin Street, Madison, WI.
08/15/2024 07:00 PM UTC
9489 - 3400 Block E Washington Ave Sanitary Sewer Replacement
This project generally consists of replacement and installation of sanitary sewer pipes and structures, abandoning existing sanitary sewer, and replacement of concrete pavement.
07/18/2024 07:00 PM UTC
8742 Rutledge Street Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
07/18/2024 07:00 PM UTC
9546 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
07/11/2024 07:00 PM UTC
71 - 80 of 1076 Solicitations