General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8789 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 20) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work
02/13/2025 08:00 PM UTC
9616 - Truax Apartments PV - Roofing Alterations
Work includes installation of roof anchors for solar racking attachment.
01/30/2025 08:00 PM UTC
North Shore Drive Path and East Madison Bikeways: Safe Streets
The work under this contract shall include but is not limited storm sewer pipe and structure installation, to excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, and driveway aprons, lighting conduit and bases/poles, pavement markings, ground restoration, erosion control installation and removal, and work zone traffic control signs and devices.
01/30/2025 08:00 PM UTC
9550 - Yahara Hills Golf Course Pump Station and Irrigation Improvements
The work for this contract is to decommission the existing irrigation pump station, remove the pump motors, and cover the existing wet well. The contractor will provide and install a complete Watertronics irrigation pump station, including the equipment pad, wet well, intake flume/screen, and a prefabricated pump station enclosure powered by the existing transformer. Additionally, the irrigation system will be adjusted to align with revised golf course boundaries, with components cut, capped, sealed, and added/adjusted as indicated on the drawings. The contractor is also responsible for surveying all property boundaries.
01/16/2025 08:00 PM UTC
9583 - CCB Remodel - DCR 104 & 108A
The work shall include but not be limited to all of the following: • Demolition and construction. • Installation of finish materials. • Installation of electrical, lighting and heating equipment and materials. • Installation of built-in cabinetry. • Cooperation with other contractors doing work for the City of Madison or Dane County within the contract work spaces.
01/16/2025 08:00 PM UTC
8759 - Starker Avenue Resurfacing Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter replacement, driveway aprons replacement, sidewalk replacement, asphalt pavement, pavement marking and signing.
11/21/2024 08:00 PM UTC
9535 - CIPP UV Lining Rehabilitation of Sewers Phase 2 - 2024
The work includes the trenchless rehabilitation of approximately 5,382 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system.
11/21/2024 08:00 PM UTC
9517 - Pheasant Branch Greenway Enhancement
Work shall include, but is not limited to; clearing & grubbing, tree removal, channel excavation and riprap placement, base course, installation of box culvert crossings, installation of storm pipe and structures, installation of water main and appurtenances, installation of sanitary sewer main and structures, installation of pedestrian bridge, grading, road reconstruction, pavement marking and restoration including the removal of invasive species, seeding and planting operations, and maintenance of plantings. This project has received FEMA funding and is subject to all federal, state and local regulations and requirements as provided in these contract documents.
11/14/2024 08:00 PM UTC
9605 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing the existing sediment buildup from the bottom of the Prairie Hills Detention Basin and grading the pond closer to original design elevations. Along with removing sediment, constructing a maintenance access drive off of Dorchester Way, constructing four 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, D-2 clearing and grubbing, grading, street restoration and site restoration.
11/14/2024 08:00 PM UTC
9572 - N Lake Street Boat Ramp
This contract and associated plan set describes the work necessary to install a new 26’x20’ concrete slab at the existing boat launch located within the right-of-way of North Lake Street located in Madison, Wisconsin. This works includes but is not limited to excavation cut, placing concrete, and lake control.
11/07/2024 08:00 PM UTC