City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 8809PlanHolders02112026.pdf (91 KB) |
Contract 8809 - South Charter Street Alley
| |
| 9726PlanHolders02112026.pdf (92.3 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9737PlanHolders02112026.pdf (84.3 KB) |
Contract 9737 - 2026 Semi-Permanent Epoxy
| |
| 9745PlanHolders02112026.pdf (87.7 KB) |
Contract 9745 - MMB Flagpole Replacement
| |
| Number | Deadline |
|---|---|
|
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
| 02/12/2026 08:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 02/26/2026 08:00 PM UTC |
|
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
| 02/26/2026 08:00 PM UTC |
|
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn
out epoxy markings as needed for the entire City.
| 02/26/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
8798 - Resurfacing 2025 - Assessment District
The work in this contract includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes, adjusting inlets and castings, installation of new storm sewer, and pulverizing/milling, and paving various streets that are included with the resurfacing program.
| 05/08/2025 07:00 PM UTC |
|
9642 - Rennebohm Park East Tennis Courts 2025
This project consists of reconstructing the east tennis court complex at Rennebohm Park. Work includes asphalt pavement, grading, base course, electrical and lighting, fencing, gates, net posts, net tie downs, and sport court finishing and striping.
| 04/17/2025 07:00 PM UTC |
|
9648 - 2025 Parking Garage Maintenance
Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
| 04/17/2025 07:00 PM UTC |
|
9646 - 2025 Sport Court Resurfacings
This project consists of resurfacing existing basketball, tennis and pickleball courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
| 04/17/2025 07:00 PM UTC |
|
8783 - Shawnee Pass Assessment District 2025, Nakoma Sidewalk, and Nakoma Culvert
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, sanitary sewer replacement, and replacement of storm sewer main, culvert, and storm sewer structures.
| 04/17/2025 07:00 PM UTC |
|
9610 Imagination Center at Reindahl Park
Work shall include but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
| 04/03/2025 07:00 PM UTC |
|
9633 - CIPP 2025 Churchill Dr Water Main Rehabilitation
The rehabilitation of these water mains is to be completed by lining the existing water mains with a Class IV structural cured-in-place pipe (CIPP), certified for the conveyance of drinking water.
| 04/03/2025 07:00 PM UTC |
|
9617 - Solar PV - Water Utility Olin Ave
The work includes installation of new arrays totaling 74 kW across the two buildings and the reinstallation of a 9.84 kW array on the office building.
| 03/27/2025 07:00 PM UTC |
|
9627 - South Madison Demolitions & Site Restorations
Hazmat remediation and demolition of structures, removing site features and site restoration grading and reseeding of six parcels located at 810 & 818 W. Badger Rd., 814-826 North Ave., 1810 South Park St., and 1901-1915 South Park St.
| 03/27/2025 07:00 PM UTC |
|
8757 - Bartillon Sidewalk
The work under this contract shall include, but is not limited to, clearing, grubbing, concrete sidewalk, and terrace restoration with topsoil, seed, and matting.
| 03/27/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.