General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9668PlanHolders08212026.pdf (94.4 KB)
Contract 9668 - Mayflower Lift Station Replacement
9782PlanHolders08212026.pdf (97.6 KB)
Contract 9782 - South Point Public Works Facility
9806PlanHolders08212026.pdf (83.7 KB)
Contract 9806 - 2026 Playgrounds -- Set 2
9818PlanHolders08212026.pdf (86 KB)
Contract 9818 - Cypress Spray Park Redevelopment
5 Documents

Upcoming Solicitations

Number Deadline
9668 - Mayflower Lift Station Replacement
The work under this contract shall include, but is not limited to, the removal and replacement of the existing Mayflower sanitary sewer lift station, replacement of the existing force main, replacement of gravity sanitary sewer mains and structures, installation of an emergency generator, installation of a telemetry antenna tower, installation of a new site access drive, grading of the site, and restoration of the site.
08/27/2026 07:00 PM UTC
9782 - South Point Public Works Facility
This single contract is for the installation of a new Streets Division Operations Building and the remodeling of an existing warm storage building for Parks Division West Maintenance Operations.
09/10/2026 07:00 PM UTC
9818 - Cypress Spray Park Redevelopment
This contract consists of installation of a Splash Pad and Playground at Cypress Spray Park (902 Magnolia Ln.). The Contractor shall view the site prior to bidding to become familiar with the existing conditions. The Contractor shall work with the existing utilities to resolve conflicts during the construction process.
09/10/2026 07:00 PM UTC
9806 - 2026 Playgrounds -- Set 2
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at five (5) City of Madison park locations including James Madison Park, Marshall Park, Eastmorland Park, Orton Park, and Heifetz Park.
09/10/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
9682 - Monona Terrace Tunnel Lighting
This work generally consists of the replacement and upgrades to the existing lighting and electrical systems under the Monona Terrace Parking structure.
09/04/2025 07:00 PM UTC
9657 - Stricker Pond Forebay Dredging
Dewater and dredge the existing stormwater forebay located at the City of Madison Park Stricker's Pond, 7214 Longmeadow Rd. This work also includes construction of four catch basins, topsoiling and native seeding.
09/04/2025 07:00 PM UTC
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
9673 - Bartillon Shelter Fiber Connection
1904 Bartillon Drive, Madison, WI.
08/21/2025 07:00 PM UTC
9677 - Quann Park Lighting Project
The project generally consists of installing City-standard path lighting (LED, cut-off fixtures) along the Quann Park Path. The project also includes work at Penn Park to install two solar street lighting units.
08/21/2025 07:00 PM UTC
8806 - Buffalo Trail, Barron Court, and Green Lake Pass Assessment District - 2025
Work shall include, but not be limited to, replacement of a portion of the sanitary sewer main and laterals, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, asphalt pavement, pavement marking, and signing.
08/21/2025 07:00 PM UTC
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
07/24/2025 07:00 PM UTC
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
07/24/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
07/03/2025 07:00 PM UTC
61 - 70 of 1121 Solicitations
1 2 3 4 5 7 9 10 11 112 113