City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 8786PlanHolders03122026.pdf (90.5 KB) |
Contract 8786 - MacArthur, Larson, Sycamore
| |
| 8810PlanHolders03122026.pdf (88.5 KB) |
Contract 8810 - Midvale Boulevard Pavement
| |
| 8845PlanHolders03122026.pdf (91.5 KB) |
Contract 8845 - Campus Babcock Railroad Crossing
| |
| 9593PlanHolders03122026.pdf (86.4 KB) |
Contract 9593 - Pressure Zone 4 Crossing
| |
| 9613PlanHolders03122026.pdf (91.2 KB) |
Contract 9613 - CIPP UV Lining Rehabilitation
| |
| 9712PlanHolders03122026.pdf (88.6 KB) |
Contract 9712 - Yahara Hills Golf Course Well Pipe
| |
| 9726PlanHolders03122026.pdf (96.1 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9730PlanHolders03122026.pdf (92.3 KB) |
Contract 9730 - Manitou Way Storm Box
| |
| 9740PlanHolders03122026.pdf (94 KB) |
Contract 9740 - Unit Well 12 Upgrade
| |
| Number | Deadline |
|---|---|
|
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 03/19/2026 07:00 PM UTC |
|
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
| 03/19/2026 07:00 PM UTC |
|
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
| 03/19/2026 07:00 PM UTC |
|
8845 - Campus Drive at Babcock Drive Railroad Crossing Improvements
Work includes, but is not limited to, base preparation, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, electrical, traffic signals, lighting, pavement marking, signs, fencing, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 03/19/2026 07:00 PM UTC |
|
8810 - Midvale Boulevard Pavement Patching
The work under this contract shall include, but not be limited to, asphalt pavement patching, pavement markings, tubular bollard curb extensions, and rectangular rapid flashing beacon installations.
| 03/19/2026 07:00 PM UTC |
|
8786 - MacArthur Road, MacArthur Court, Larson Court, Sycamore Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
| 03/19/2026 07:00 PM UTC |
|
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
| 04/02/2026 07:00 PM UTC |
|
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
| 04/02/2026 07:00 PM UTC |
|
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex.
The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
| 04/02/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
9616 - Truax Apartments PV - Roofing Alterations
Work includes installation of roof anchors for solar racking attachment.
| 01/30/2025 08:00 PM UTC |
|
North Shore Drive Path and East Madison Bikeways: Safe Streets
The work under this contract shall include but is not limited storm sewer pipe and structure installation, to excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, and driveway aprons, lighting conduit and bases/poles, pavement markings, ground restoration, erosion control installation and removal, and work zone traffic control signs and devices.
| 01/30/2025 08:00 PM UTC |
|
9550 - Yahara Hills Golf Course Pump Station and Irrigation Improvements
The work for this contract is to decommission the existing irrigation pump station, remove the pump motors, and cover the existing wet well. The contractor will provide and install a complete Watertronics irrigation pump station, including the equipment pad, wet well, intake flume/screen, and a prefabricated pump station enclosure powered by the existing transformer. Additionally, the irrigation system will be adjusted to align with revised golf course boundaries, with components cut, capped, sealed, and added/adjusted as indicated on the drawings. The contractor is also responsible for surveying all property boundaries.
| 01/16/2025 08:00 PM UTC |
|
9583 - CCB Remodel - DCR 104 & 108A
The work shall include but not be limited to all of the following:
• Demolition and construction.
• Installation of finish materials.
• Installation of electrical, lighting and heating equipment and materials.
• Installation of built-in cabinetry.
• Cooperation with other contractors doing work for the City of Madison or Dane County within the contract work spaces.
| 01/16/2025 08:00 PM UTC |
|
8759 - Starker Avenue Resurfacing Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter replacement, driveway aprons replacement, sidewalk replacement, asphalt pavement, pavement marking and signing.
| 11/21/2024 08:00 PM UTC |
|
9535 - CIPP UV Lining Rehabilitation of Sewers Phase 2 - 2024
The work includes the trenchless rehabilitation of approximately 5,382 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system.
| 11/21/2024 08:00 PM UTC |
|
9517 - Pheasant Branch Greenway Enhancement
Work shall include, but is not limited to; clearing & grubbing, tree removal, channel excavation and riprap placement, base course, installation of box culvert crossings, installation of storm pipe and structures, installation of water main and appurtenances, installation of sanitary sewer main and structures, installation of pedestrian bridge, grading, road reconstruction, pavement marking and restoration including the removal of invasive species, seeding and planting operations, and maintenance of plantings.
This project has received FEMA funding and is subject to all federal, state and local regulations and requirements as provided in these contract documents.
| 11/14/2024 08:00 PM UTC |
|
9605 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing the existing sediment buildup from the bottom of the Prairie Hills Detention Basin and grading the pond closer to original design elevations. Along with removing sediment, constructing a maintenance access drive off of Dorchester Way, constructing four 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, D-2 clearing and grubbing, grading, street restoration and site restoration.
| 11/14/2024 08:00 PM UTC |
|
9572 - N Lake Street Boat Ramp
This contract and associated plan set describes the work necessary to install a new 26’x20’ concrete slab at the existing boat launch located within the right-of-way of North Lake Street located in Madison, Wisconsin. This works includes but is not limited to excavation cut, placing concrete, and lake control.
| 11/07/2024 08:00 PM UTC |
|
9582 - LED Street Lights
This project generally consists of removal and replacement of old streetlight fixtures with new LED fixtures Citywide.
| 10/17/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.