General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8745 - Stevens Street Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
05/23/2024 07:00 PM UTC
8709 Doncaster Beverly Danbury Reconstruction Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, terrace rain gardens, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, and asphalt pavement.
05/23/2024 07:00 PM UTC
9487 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2024
The work includes the trenchless rehabilitation of approximately 14,973 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system. This contract shall also include the trenchless rehabilitation of approximately 860 linear feet of corrugated metal pipe (CMP) storm sewer pipelines with sizes of 21” diameter circular and 18”x24” elliptical using a thermal cure CIPP system.
05/09/2024 07:00 PM UTC
8740 - Hermina St & Union St Reconstruction Assessment District
The work includes the removal and replacement of the following: sanitary sewer main and laterals, storm sewer pipes and structures, asphalt pavement and roadway gravel base, concrete curb & gutter, concrete driveway aprons, and concrete sidewalk as needed.
05/09/2024 07:00 PM UTC
9497 - Streets West Facility HVAC and Lighting Upgrade
The work includes replacement of garage ventilation system with new make-up air unit and exhaust fan system. Lighting will be replaced in all garage and shop areas.
04/25/2024 07:00 PM UTC
9525 - 2024 Sport Court Resurfacing
The work includes resurfacing and/or power washing existing basketball and tennis courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
04/25/2024 07:00 PM UTC
9526 - 2024 Rennebohm Park East Tennis Courts
The work includes installing asphalt pavement, including base course for asphalt path and pickleball/tennis courts, installing footings/bases and electrical supply for the court lighting system, installing fencing, gates, net posts, net tie downs and sport court finishing and striping to construct a three (3) court (pickleball and tennis) complex at Rennebohm Park.
04/25/2024 07:00 PM UTC
8317 - Blue Harvest Lane, Feather Edge Drive, & Soaring Sky Run Assessment District - 2023
The work under this contract shall include, but is not limited to, installation sanitary sewer main, laterals, water main and services, storm sewer structures and pipes, culverts, earthwork, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, driveway aprons, pavement marking, and restoration.
04/25/2024 07:00 PM UTC
8695 - Safe Streets Madison 2024
The work includes installing traffic calming measures, pedestrian improvements and intersection updates at various locations in the City. This generally includes the installation of traffic calming islands, speed humps, sidewalk, curb and gutter, and pavement markings.
04/11/2024 07:00 PM UTC
8735 - E. Wilson St. and E. Doty St. Reconstruction Assessment District - 2023
The work includes replacement and installation of sanitary sewer pipes and structures, water main, and storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of new bicycle facilities, underground terrace and sidewalk support systems, pavement marking, and signing.
04/04/2024 07:00 PM UTC
61 - 70 of 1047 Solicitations
1 2 3 4 5 7 9 10 11 104 105