General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02112026.pdf (91 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02112026.pdf (92.3 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02112026.pdf (84.3 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02112026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
8759 - Starker Avenue Resurfacing Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter replacement, driveway aprons replacement, sidewalk replacement, asphalt pavement, pavement marking and signing.
11/21/2024 08:00 PM UTC
9535 - CIPP UV Lining Rehabilitation of Sewers Phase 2 - 2024
The work includes the trenchless rehabilitation of approximately 5,382 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system.
11/21/2024 08:00 PM UTC
9517 - Pheasant Branch Greenway Enhancement
Work shall include, but is not limited to; clearing & grubbing, tree removal, channel excavation and riprap placement, base course, installation of box culvert crossings, installation of storm pipe and structures, installation of water main and appurtenances, installation of sanitary sewer main and structures, installation of pedestrian bridge, grading, road reconstruction, pavement marking and restoration including the removal of invasive species, seeding and planting operations, and maintenance of plantings. This project has received FEMA funding and is subject to all federal, state and local regulations and requirements as provided in these contract documents.
11/14/2024 08:00 PM UTC
9605 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing the existing sediment buildup from the bottom of the Prairie Hills Detention Basin and grading the pond closer to original design elevations. Along with removing sediment, constructing a maintenance access drive off of Dorchester Way, constructing four 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, D-2 clearing and grubbing, grading, street restoration and site restoration.
11/14/2024 08:00 PM UTC
9572 - N Lake Street Boat Ramp
This contract and associated plan set describes the work necessary to install a new 26’x20’ concrete slab at the existing boat launch located within the right-of-way of North Lake Street located in Madison, Wisconsin. This works includes but is not limited to excavation cut, placing concrete, and lake control.
11/07/2024 08:00 PM UTC
9582 - LED Street Lights
This project generally consists of removal and replacement of old streetlight fixtures with new LED fixtures Citywide.
10/17/2024 07:00 PM UTC
8770 - West Towne Path - Phase 2A
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, block retaining wall, lighting conduit and base/poles, pavement markings, and ground restoration.
09/26/2024 07:00 PM UTC
9486 - Commercial Avenue Sanitary Sewer Reconstruction
The work under this contract shall include, but is not limited to, installation of sanitary sewer main (open trench and bore & jack methods), lateral reconnections, and asphalt pavement patching.
09/12/2024 07:00 PM UTC
9536 - CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon & CIPP Lining Rehabilitation - North Mills Street Sanitary Sewer Siphon
The work includes the trenchless rehabilitation of an approximately 79 feet linear feet of 8” ductile iron sanitary sewer mains using thermal cure CIPP methods (two mains total).
09/12/2024 07:00 PM UTC
8767 - Door Creek Park Connection
The work under this contract shall include, but is not limited to, installing new conduit and fiber optic between an existing splice point at the intersection of Milwaukee Street and Sprecher Road and a new shelter being built at Door Creek Park.
08/29/2024 07:00 PM UTC
61 - 70 of 1072 Solicitations
1 2 3 4 5 7 9 10 11 107 108