City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 8809PlanHolders02112026.pdf (91 KB) |
Contract 8809 - South Charter Street Alley
| |
| 9726PlanHolders02112026.pdf (92.3 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9737PlanHolders02112026.pdf (84.3 KB) |
Contract 9737 - 2026 Semi-Permanent Epoxy
| |
| 9745PlanHolders02112026.pdf (87.7 KB) |
Contract 9745 - MMB Flagpole Replacement
| |
| Number | Deadline |
|---|---|
|
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
| 02/12/2026 08:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 02/26/2026 08:00 PM UTC |
|
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
| 02/26/2026 08:00 PM UTC |
|
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn
out epoxy markings as needed for the entire City.
| 02/26/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and
laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
| 07/03/2025 07:00 PM UTC |
|
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
| 06/25/2025 07:00 PM UTC |
|
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
| 06/20/2025 07:00 PM UTC |
|
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
| 06/20/2025 07:00 PM UTC |
|
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
| 06/20/2025 07:00 PM UTC |
|
9655 - Fire Station 8 Lighting Retrofit
This project includes replacement of lighting and lighting controls. This will reduce energy consumption and maintenance cost.
| 06/05/2025 07:00 PM UTC |
|
9651 - Madison Public Market - Exterior Signage
This contract is for the fabrication, delivery, and installation of exterior signage for the future Madison Public Market located at 202 N First St., Madison, WI 53704. The work includes, but is not limited to, electrical hookup and testing of signage elements, with electrical rough-in already provided near each sign location. This contract includes a potential for (1) Additive Alternate labeled as ITEM 90001.
| 05/22/2025 07:00 PM UTC |
|
9591 - Capital City Trail Box Culvert Replacement
The work under this contract shall include, but is not limited to, excavation, replacement of storm sewer main, culvert, and storm structures, base preparation, curb and gutter, path aprons, sidewalk, asphalt pavement.
| 05/22/2025 07:00 PM UTC |
|
8792 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2025
This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work.
| 05/08/2025 07:00 PM UTC |
|
8807 - Resurfacing 2025 - Asphalt Base Patching and Base Patch Grinding
Included with this contract is asphalt base patching, patch by grind (mill/overlay) citywide, and infrared patching.
| 05/08/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.