General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8786PlanHolders03132026.pdf (91.6 KB)
Contract 8786 - MacArthur, Larson, Sycamore
8810PlanHolders03132026.pdf (88.5 KB)
Contract 8810 - Midvale Boulevard Pavement
8845PlanHolders03132026.pdf (91.7 KB)
Contract 8845 - Campus Babcock Railroad Crossing
9593PlanHolders03132026.pdf (88.5 KB)
Contract 9593 - Pressure Zone 4 Crossing
9613PlanHolders03132026.pdf (91.2 KB)
Contract 9613 - CIPP UV Lining Rehabilitation
9694PlanHolders03132026.pdf (86.5 KB)
Contract 9694 - Warner & Worthington Park Courts
9712PlanHolders03132026.pdf (88.6 KB)
Contract 9712 - Yahara Hills Golf Course Well Pipe
9726PlanHolders03132026.pdf (96.1 KB)
Contract 9726 - Country Grove Singletrack Trail
9730PlanHolders03132026.pdf (92.3 KB)
Contract 9730 - Manitou Way Storm Box
9740PlanHolders03132026.pdf (94 KB)
Contract 9740 - Unit Well 12 Upgrade
11 Documents

Upcoming Solicitations

Number Deadline
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/19/2026 07:00 PM UTC
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
03/19/2026 07:00 PM UTC
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
03/19/2026 07:00 PM UTC
8845 - Campus Drive at Babcock Drive Railroad Crossing Improvements
Work includes, but is not limited to, base preparation, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, electrical, traffic signals, lighting, pavement marking, signs, fencing, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
03/19/2026 07:00 PM UTC
8810 - Midvale Boulevard Pavement Patching
The work under this contract shall include, but not be limited to, asphalt pavement patching, pavement markings, tubular bollard curb extensions, and rectangular rapid flashing beacon installations.
03/19/2026 07:00 PM UTC
8786 - MacArthur Road, MacArthur Court, Larson Court, Sycamore Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
03/19/2026 07:00 PM UTC
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
8806 - Buffalo Trail, Barron Court, and Green Lake Pass Assessment District - 2025
Work shall include, but not be limited to, replacement of a portion of the sanitary sewer main and laterals, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, asphalt pavement, pavement marking, and signing.
08/21/2025 07:00 PM UTC
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
07/24/2025 07:00 PM UTC
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
07/24/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
07/03/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
9655 - Fire Station 8 Lighting Retrofit
This project includes replacement of lighting and lighting controls. This will reduce energy consumption and maintenance cost.
06/05/2025 07:00 PM UTC
21 - 30 of 1076 Solicitations