General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8733PlanHolders12122025.pdf (91.1 KB)
Contract 8733 - Hawthorne, Lake, W Dayton
2 Documents

Upcoming Solicitations

Number Deadline
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
12/18/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
9655 - Fire Station 8 Lighting Retrofit
This project includes replacement of lighting and lighting controls. This will reduce energy consumption and maintenance cost.
06/05/2025 07:00 PM UTC
9651 - Madison Public Market - Exterior Signage
This contract is for the fabrication, delivery, and installation of exterior signage for the future Madison Public Market located at 202 N First St., Madison, WI 53704. The work includes, but is not limited to, electrical hookup and testing of signage elements, with electrical rough-in already provided near each sign location. This contract includes a potential for (1) Additive Alternate labeled as ITEM 90001.
05/22/2025 07:00 PM UTC
9591 - Capital City Trail Box Culvert Replacement
The work under this contract shall include, but is not limited to, excavation, replacement of storm sewer main, culvert, and storm structures, base preparation, curb and gutter, path aprons, sidewalk, asphalt pavement.
05/22/2025 07:00 PM UTC
8792 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2025
This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work.
05/08/2025 07:00 PM UTC
8807 - Resurfacing 2025 - Asphalt Base Patching and Base Patch Grinding
Included with this contract is asphalt base patching, patch by grind (mill/overlay) citywide, and infrared patching.
05/08/2025 07:00 PM UTC
8798 - Resurfacing 2025 - Assessment District
The work in this contract includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes, adjusting inlets and castings, installation of new storm sewer, and pulverizing/milling, and paving various streets that are included with the resurfacing program.
05/08/2025 07:00 PM UTC
21 - 30 of 1071 Solicitations
1 3 5 6 7 8 9 107 108