City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
Name * | Description | |
---|---|---|
How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
8763PlanHolders06182025.pdf (89.9 KB) |
Contract 8763 - Badger Rusk Path
| |
8784PlanHolders06182025.pdf (91.4 KB) |
Contract 8784 - E Main S Hancock
| |
9612PlanHolders06182025.pdf (108 KB) |
Contract 9612 - CIPP UVLining - Phase 1 2025
| |
9626PlanHolders06182025.pdf (110 KB) |
Contract 9626 - Mid Town Hydraulic Improvements
| |
9654PlanHolders06182025.pdf (106 KB) |
Contract 9654 - CIPP Thermal Lining - Phase 1
| |
Number | Deadline |
---|---|
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
| 06/20/2025 07:00 PM UTC |
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
| 06/20/2025 07:00 PM UTC |
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
| 06/20/2025 07:00 PM UTC |
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
| 06/25/2025 07:00 PM UTC |
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
| 07/03/2025 07:00 PM UTC |
Number | Deadline |
---|---|
9546 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
| 07/11/2024 07:00 PM UTC |
8626 - Olin-Turville Court and E. Lakeside Street Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, culverts, earthwork, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, curb ramps, pavement marking, and restoration.
| 07/11/2024 07:00 PM UTC |
9502 - Warner Park Community Recreation Center Expansion
The work includes removal of some existing exterior walls, excavation for new footings and foundations, construction of a building addition, which includes a gymnasium, with new exterior walls, roofs and interior slabs. Installation of new mechanical, electrical, and plumbing systems, and interior renovations to create new restrooms and a comfort room. Site work including geothermal, landscaping, and parking lot modifications.
| 06/27/2024 07:00 PM UTC |
9372 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing 100 cu. yards of existing sediment buildup from the bottom of the Prairie Hills Detention Basin West Cell under an existing maintenance permit, constructing a maintenance access drive off Dorchester Way, constructing three 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, clearing and grubbing, grading and street and site restoration.
| 06/27/2024 07:00 PM UTC |
9521 2024 Playground Improvements
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at four (4) City of Madison park locations including Garner Park, Manchester Park, Meadowood Park, and Sherwood Forest Park.
| 06/27/2024 07:00 PM UTC |
8744 - Atticus Way Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of storm sewer structures and pipes, base preparation, curb and gutter, asphalt pavement, sidewalk, street lighting, pavement marking, and signing.
| 06/27/2024 07:00 PM UTC |
9522 - 20 Is Plenty
The work includes providing, hauling, and installing 24” x 30” “Speed Limit 20” signs on residential streets throughout the City of Madison as shown on the provided plan sheets and per the provided detail drawings and bid items specifications.
| 06/13/2024 07:00 PM UTC |
9527 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
| 06/13/2024 07:00 PM UTC |
8635 - Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, installation of storm sewer main and storm sewer structures, adjustment of sanitary sewer man structures, adjustment of water valves, excavation, base course preparation, bridge rehabilitation, curb and gutter, driveway aprons, sidewalk installation, green infrastructure, colored concrete pavement, asphalt pavement, pavement marking and signing.
| 06/13/2024 07:00 PM UTC |
9358 - Bartillon Shelter
The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
| 05/23/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.