Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
9718 - Hoyt Park Lot Reconstruction
This project consists of the reconstruction of the asphalt parking lot at Hoyt Park. Work includes removing the existing curb and gutter and asphalt and rebuilding the lot per the contract's plans. Resurfacing and reconstruction of some of the asphalt park paths are included in the contract. This project also adds some concrete sidewalk and a bio retention basin to the site.
02/26/2026 08:00 PM UTC
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
12/18/2025 08:00 PM UTC
9666 - Breese Stevens Field - Athletic Field Replacement
The Work includes the replacement of the synthetic turf and infill at Breese Stevens Field, 917 E. Mifflin Street, Madison, WI 53703.
11/20/2025 08:00 PM UTC
9691 - 2026 Playgrounds - Set 1
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at four (4) City of Madison park locations including Kennedy Park, Ontario Park, Sandburg Park, and Skyview Park.
11/20/2025 08:00 PM UTC
8841 - 114 E Wilson Site Restoration
This project includes site restoration of the City of Madison-owned gravel lot at 114 E. Wilson St. The site was formerly part of the Government East Parking Ramp, and since the ramp was demolished, the site has been used for construction staging by various local Contractors working in the area. The last Contractor to occupy the space is anticipated to be offsite in November 2025.
11/20/2025 08:00 PM UTC
9697 - Monona Terrace Tunnel Lighting
This work generally consists of the replacement and upgrades to the existing lighting and electrical systems under the Monona Terrace parking structure.
10/30/2025 07:00 PM UTC
9681-Dairy Drive Campground Demo and Site Restoration
This contract is for the demolition of structures, site features and asphalt and/or concrete paving located 3202 Dairy Dr.
09/25/2025 07:00 PM UTC