General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
7431PlanHolders06022026.pdf (88.5 KB)
Contract 7431 - Cannonball Path Ph 6
8829PlanHolders06022026.pdf (88.1 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders06022026.pdf (89.5 KB)
Contract 8830 - Bridge Repairs - 2026
8842PlanHolders06022026.pdf (86.2 KB)
Contract 8842 - SW Path & W Wash Signal
9758PlanHolders06022026.pdf (85.5 KB)
Contract 9758 - Milwaukee St Sprecher Road Signal
9787PlanHolders06022026.pdf (88.2 KB)
Contract 9787 - Newville Park Redevelopment
9795PlanHolders06022026.pdf (87.9 KB)
Contract 9795 - James Madison Park Wall
8 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
9795 - James Madison Park Retaining Wall Repair
This project will replace a failing concrete retaining wall in James Madison Park. This concrete wall supports the driveway to the underground parking garage serving the Lincoln School Apartments. The project uses a hybrid approach to replace a portion of the wall in kind then regrade a portion of the hillside within the park to support the driveway without a need for a retaining wall.
06/11/2026 07:00 PM UTC
8842 - Southwest Commuter Path & West Washington Avenue Traffic Signal
The work under this contract shall include but not be limited to removing existing Rectangular Rapid Flashing Beacons, installing new traffic signal bases, conduit, removing concrete sidewalk and ramps, and installing new sidewalks and ramps.
06/11/2026 07:00 PM UTC
9758 - Milwaukee Street & Sprecher Road Traffic Signal Assessment District
The work under this contract shall include but not be limited to removing and salvaging existing arms, poles, breakaway bases, and flashing red light devices; installing new traffic signal bases, conduit, and pullboxes. The project limits for the work at the intersection of Sprecher Road & Milwaukee Street are approximately 330-feet on each approach of the intersection.
06/11/2026 07:00 PM UTC
7431 - Cannonball Path Phase 6
The work under this contract shall include but is not limited to replacement and upgrade of sanitary sewer and laterals, storm sewer pipes and structures, as well as the installation and replacement of concrete sidewalk, concrete curb & gutter, concrete driveway aprons, concrete pavement, asphalt driveways, asphalt pavement, roadway base, path and street lighting, fiber conduit, pavement markings, bike-pedestrian bridge structure, and soil restoration.
06/11/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
8797 - Repairing and Sealing Pavement Cracks - Local Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
03/20/2025 07:00 PM UTC
9318 - Olin Waste Transfer Drop-Off
This project is to provide a dedicated Public Waste and Recycling Drop-off site at the existing Olin Waste Transfer site. Currently the temporary site is co-mingled with large city vehicles and the drop-off site runs limited hours for safety reasons. This project will install a separate public access road off of Quann-Olin Pkwy. The internal circulation of the drop-off area will keep public and city vehicle traffic separated.
03/13/2025 07:00 PM UTC
8811 - Bridge Repairs - 2025
This project consists of bridge repairs for the Park Street pedestrian bridge (P-13-760), Commercial Avenue bridge, USH-51 pedestrian bridge (B-13-341), and the Campus Drive Bridge (B-13-266) over Highland Avenue.
03/13/2025 07:00 PM UTC
8791 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 20) - 2025
The work includes horizontally sawcutting/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/27/2025 08:00 PM UTC
8788 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 10) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work.
02/27/2025 08:00 PM UTC
9551 - Rennebohm Park Sprayground
This contract consists of installation of a Sprayground at Rennebohm Park (115 N. Eau Claire Ave.). Work to include: -Water service lateral and associated pavement patching -Concrete paving (colored and standard) -Plumbing from command center to spray features -Spray feature installation -Shade structure installation -Site earthwork -Site restoration
02/13/2025 08:00 PM UTC
9529 - Parks Sun Shelter Installations
This contract consists of installation of one (1) new prefabricated park sun shelter, concrete footings, concrete slab base and associated sitework at (3) park locations: -Kestrel Park (9702 Grey Kestrel Dr, Verona, WI 53593) -North Star Park (502 North Star Dr, Madison, WI 53718) -Sycamore Park (830 Jana Ln, Madison, WI 53704)
02/13/2025 08:00 PM UTC
8766 - N Franklin and Lynn Terrace Assessment District - 2025
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
02/13/2025 08:00 PM UTC
8790 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 10) - 2025
The work includes horizontal sawcutting/grinding repair work primarily throughout the 10th Aldermanic District.
02/13/2025 08:00 PM UTC
9621 - 2025 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown on the plans provided by the City of Madison.
02/13/2025 08:00 PM UTC
81 - 90 of 1107 Solicitations
1 2 5 6 7 9 11 12 13 110 111