City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 8786PlanHolders03132026.pdf (91.6 KB) |
Contract 8786 - MacArthur, Larson, Sycamore
| |
| 8810PlanHolders03132026.pdf (88.5 KB) |
Contract 8810 - Midvale Boulevard Pavement
| |
| 8845PlanHolders03132026.pdf (91.7 KB) |
Contract 8845 - Campus Babcock Railroad Crossing
| |
| 9593PlanHolders03132026.pdf (88.5 KB) |
Contract 9593 - Pressure Zone 4 Crossing
| |
| 9613PlanHolders03132026.pdf (91.2 KB) |
Contract 9613 - CIPP UV Lining Rehabilitation
| |
| 9694PlanHolders03132026.pdf (86.5 KB) |
Contract 9694 - Warner & Worthington Park Courts
| |
| 9712PlanHolders03132026.pdf (88.6 KB) |
Contract 9712 - Yahara Hills Golf Course Well Pipe
| |
| 9726PlanHolders03132026.pdf (96.1 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9730PlanHolders03132026.pdf (92.3 KB) |
Contract 9730 - Manitou Way Storm Box
| |
| 9740PlanHolders03132026.pdf (94 KB) |
Contract 9740 - Unit Well 12 Upgrade
| |
| Number | Deadline |
|---|---|
|
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 03/19/2026 07:00 PM UTC |
|
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
| 03/19/2026 07:00 PM UTC |
|
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
| 03/19/2026 07:00 PM UTC |
|
8845 - Campus Drive at Babcock Drive Railroad Crossing Improvements
Work includes, but is not limited to, base preparation, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, electrical, traffic signals, lighting, pavement marking, signs, fencing, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 03/19/2026 07:00 PM UTC |
|
8810 - Midvale Boulevard Pavement Patching
The work under this contract shall include, but not be limited to, asphalt pavement patching, pavement markings, tubular bollard curb extensions, and rectangular rapid flashing beacon installations.
| 03/19/2026 07:00 PM UTC |
|
8786 - MacArthur Road, MacArthur Court, Larson Court, Sycamore Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
| 03/19/2026 07:00 PM UTC |
|
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
| 04/02/2026 07:00 PM UTC |
|
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
| 04/02/2026 07:00 PM UTC |
|
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex.
The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
| 04/02/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8626 - Olin-Turville Court and E. Lakeside Street Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, culverts, earthwork, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, curb ramps, pavement marking, and restoration.
| 07/11/2024 07:00 PM UTC |
|
9502 - Warner Park Community Recreation Center Expansion
The work includes removal of some existing exterior walls, excavation for new footings and foundations, construction of a building addition, which includes a gymnasium, with new exterior walls, roofs and interior slabs. Installation of new mechanical, electrical, and plumbing systems, and interior renovations to create new restrooms and a comfort room. Site work including geothermal, landscaping, and parking lot modifications.
| 06/27/2024 07:00 PM UTC |
|
9372 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing 100 cu. yards of existing sediment buildup from the bottom of the Prairie Hills Detention Basin West Cell under an existing maintenance permit, constructing a maintenance access drive off Dorchester Way, constructing three 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, clearing and grubbing, grading and street and site restoration.
| 06/27/2024 07:00 PM UTC |
|
9521 2024 Playground Improvements
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at four (4) City of Madison park locations including Garner Park, Manchester Park, Meadowood Park, and Sherwood Forest Park.
| 06/27/2024 07:00 PM UTC |
|
8744 - Atticus Way Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of storm sewer structures and pipes, base preparation, curb and gutter, asphalt pavement, sidewalk, street lighting, pavement marking, and signing.
| 06/27/2024 07:00 PM UTC |
|
9522 - 20 Is Plenty
The work includes providing, hauling, and installing 24” x 30” “Speed Limit 20” signs on residential streets throughout the City of Madison as shown on the provided plan sheets and per the provided detail drawings and bid items specifications.
| 06/13/2024 07:00 PM UTC |
|
9527 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
| 06/13/2024 07:00 PM UTC |
|
8635 - Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, installation of storm sewer main and storm sewer structures, adjustment of sanitary sewer man structures, adjustment of water valves, excavation, base course preparation, bridge rehabilitation, curb and gutter, driveway aprons, sidewalk installation, green infrastructure, colored concrete pavement, asphalt pavement, pavement marking and signing.
| 06/13/2024 07:00 PM UTC |
|
9358 - Bartillon Shelter
The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
| 05/23/2024 07:00 PM UTC |
|
8745 - Stevens Street Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
| 05/23/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.