Upcoming Solicitations

Number Deadline
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
12/18/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9298 - 2023 West Parks Playground Replacements
Installation of new playground equipment, benches, playground safety surfacing, asphalt paths and associated sitework at three City of Madison parks locations. The General Contractor and subcontractor must be prequalified in Category 262, Playground Equipment Installer.
05/04/2023 07:00 PM UTC
9245 - Door Creek Park Shelter
Door Creek Park Shelter
04/20/2023 07:00 PM UTC
8721 - W. Main Street Bike Boulevard Improvements
Construction of W. Main Street Bike Boulevard Improvements, including pedestrian and bicycle crossing improvements at W. Main St. and Proudfit St.
04/20/2023 07:00 PM UTC
9313 - Madison Senior Center Courtyard
Renovation of the Madison Senior Center Courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials. The project also includes lighting and storm sewer.
04/20/2023 07:00 PM UTC
9306 - 2023 Penn Park Courts
Installing asphalt pavement, including base course for path and courts, installing fencing, basketball hoops, mini-pitch system, and sport court finishing, striping and site restoration to construct two (2) basketball courts and a mini-pitch at Penn Park.
04/20/2023 07:00 PM UTC
8300 - W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
04/20/2023 07:00 PM UTC
9312 - Truax Lift Station Replacement
Truax Lift Station Replacement
04/20/2023 07:00 PM UTC
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
04/06/2023 07:00 PM UTC
9240 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
04/06/2023 07:00 PM UTC
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
04/06/2023 07:00 PM UTC